← Back
One story - permanent living quarter
132-35 158 STREET
QUEENS · BIN 4266327
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R3XZoning
1,230 sfGross Floor Area
1Units
One story - permanent living quarter · 4,125 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Floor 213p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRANDKIRK ASSOCIATES1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/22/2025$1.3M—BRANDKIRK ASSOCIATES CORPORATION → Private party$1,091/sf building
01/11/2024$560K—— → —$455/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM ENGINEERING PC105/16/2025
J.K.DESIGN511/07/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASSURED BUILDERS INCGeneral Contractor407/08/2026
SUNATION SOLAR SYSTEMSGeneral Contractor303/21/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARUN CORP8842105/16/2025
HRF SERVICES CORP5616411/07/2024
Building Lifecycle
All (73)Filed (6)Permit Issued (6)Signed Off (3)Inspection (8)Objection (20)Special Inspection (30)
08/08/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01225961-I1
06/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/23/2025
Permit issued — Solar
Q01225961-I1-SL
05/16/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01225961-I1
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
05/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRIS KIM
05/14/2025
Special inspection requirement — Final
CHRIS KIM
05/14/2025
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
11/27/2024
Signed off — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #Q00977717-I1
Q01073117-I1
11/23/2024
Signed off — Alteration
Q01028316-I1
11/07/2024
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #Q00977717-I1
Q01073117-P1
11/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/07/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
10/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/16/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/16/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
10/16/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/16/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/16/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
10/16/2024
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
10/16/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/16/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
10/16/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/16/2024
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
10/16/2024
Special inspection requirement — Footing and Foundation
FAHAD FATEH
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/16/2024
Special inspection requirement — Final
FAHAD FATEH
10/16/2024
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
10/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/04/2024
Filed — Alteration CO
Existing one family dwelling to be horizontally and vertically enlarged and converted into a two family dwellings. New drywall partitions ,and plumbing fixtures as per plans.
Q00977717-P1
08/30/2024
Permit issued — Construction Fence
Q01028316-I1-FN
08/30/2024
Permit issued — Structural
Q00977717-I1-GC-CX
08/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/16/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2024
Permit issued — Plumbing
Q01073117-I1-PL
06/30/2024
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #Q00977717-I1
Q01073117-I1
04/29/2024
Permit issued — General Construction
Q00977717-I1-GC-CX
04/25/2024
Permit issued — Construction Fence
Q01028316-I1-FN
04/02/2024
Filed — Alteration
Q01028316-I1
03/28/2024
Objection resolved — Addressed
03/15/2024
Objection raised — Energy
03/08/2024
Objection resolved — Addressed
03/08/2024
Objection resolved — Addressed
02/10/2024
Objection resolved — Addressed
02/10/2024
Objection resolved — Addressed
02/10/2024
Objection resolved — Addressed
02/10/2024
Objection resolved — Addressed
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS05/23/2025
DOB NOWConstruction FenceSigned-offASSURED BUILDERS INC08/30/2024
DOB NOWStructuralPermit IssuedASSURED BUILDERS INC08/30/2024
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP07/30/2024
DOB NOWGeneral ConstructionPermit IssuedASSURED BUILDERS INC04/29/2024
DOB NOWConstruction FenceSigned-offASSURED BUILDERS INC04/25/2024
2 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteGALLANT ELEC'L CONST, INC3 meters
07/25/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 10/04/2024
Concrete Wood
FiledStatusContractorScope
10/04/2024Permit IssuedASSURED BUILDERS INCConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/16/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
05/14/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
05/14/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
05/14/2025Energy Code Compliance InspectionsCHRIS KIMprogress
05/14/2025FinalCHRIS KIMprogress
05/14/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
11/07/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/07/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/07/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/07/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/07/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/07/2024Maintenance informationFAHAD FATEHenergy_progress
10/16/2024Fenestration areasFAHAD FATEHenergy_progress
10/16/2024Maintenance informationFAHAD FATEHenergy_progress
10/16/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/16/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
10/16/2024Permanent certificateFAHAD FATEHenergy_progress
10/16/2024Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
10/16/2024Interior lighting powerFAHAD FATEHenergy_progress
10/16/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/16/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/16/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
10/16/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
10/16/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/16/2024Subgrade InspectionsFAHAD FATEHspecial
10/16/2024Footing and FoundationFAHAD FATEHprogress
Latest 25 of 51.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q01028316-I1Request digital key ↗
08/22/2026Q01073117-P1Request digital key ↗
08/22/2026Q01073117-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00977717-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q01073117-P1Open ↗
09/01/2026Q01073117-P1Open ↗
09/01/2026Q00977717-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01073117-P1Open ↗
09/01/2026Q00977717-I1Open ↗
09/01/2026Q00977717-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026Q01073117-I1Open ↗
08/22/2026Q01073117-P1Open ↗
08/21/2026Q00977717-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026Q01073117-I1Open ↗
08/22/2026Q01073117-P1Open ↗
08/21/2026Q00977717-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00977717-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01225961-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸DOB NOWPlot Diagram2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q00977717-I1Open ↗
08/13/2026Q00977717-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00977717-I1Open ↗