← Back
One story - permanent living quarter
133-32 GUY R BREWER BLVD
QUEENS · BIN 4266384
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R3XZoning
1,152 sfGross Floor Area
1Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: FAIRMONT REALTY GROUP LLC · 4,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
PlumbingCivil
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
1 job · most recent 02/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/24/2026Permit IssuedA & S CONTRACTORS OF NY IHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric CU1- MXZ-2C20NA4 AH-1- MSZ-GS09 AH-2- MSZ-GS12 20,000 BTU · Split System ×9
CU-1: MXZ-SM48NAMHZ AH-1, AH-2, AH-3: MSZ-GS09 AH-4 , AH-5: MSZ-GS12 48,000 BTU · Vrf Outdoor ×6
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×15
FV-15VQ5 150 CFM · Exhaust Fan ×6
1 job · most recent 02/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/24/2026Signed-offM & M PIPING AND HEATINGStorm, Water/Sanitary
1 job · most recent 07/16/2025
General Wiring
FiledStatusContractorScope
07/16/2025CompleteTRINCITY ELECTRIC, INCGeneral Wiring
1 job · most recent 02/24/2026
Concrete Wood
FiledStatusContractorScope
02/24/2026Signed-offM & M PIPING AND HEATINGConcrete, Wood
Building Lifecycle
All (76)Filed (6)Permit Issued (3)Signed Off (3)Violation (8)Inspection (8)Objection (18)Special Inspection (30)
05/11/2026
Violation issued (HPD, open)
C
04/13/2026
Signed off — Alteration CO
CONVERSION OF AN EXISTING 1 -1/2 STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01178457-I1
03/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
03/05/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/05/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
03/05/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
03/05/2026
Special inspection requirement — Final
FAHAD FATEH
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/05/2026
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/05/2026
Special inspection requirement — Preliminary
FAHAD FATEH
03/05/2026
Special inspection requirement — Footing and Foundation
FAHAD FATEH
03/05/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/05/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/05/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/05/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/05/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/05/2026
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/05/2026
Special inspection requirement — Metering
FAHAD FATEH
03/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
03/05/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/05/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/24/2026
Filed — Alteration CO
CONVERSION OF AN EXISTING 1 -1/2 STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01178457-P3
01/27/2026
Signed off — Alteration CO
CONVERSION OF AN EXISTING 1 -1/2 STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01178457-S1
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Cost
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection raised — Cost
12/02/2025
Signed off — Alteration CO
CONVERSION OF AN EXISTING 1 -1/2 STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01178457-S2
11/29/2025
Filed — Alteration CO
CONVERSION OF AN EXISTING 1 -1/2 STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01178457-P2
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/26/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
11/21/2025
Filed — Alteration CO
CONVERSION OF AN EXISTING 1 -1/2 STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01178457-P1
10/27/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Violation issued (ECB, closed)
Construction
08/12/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 76 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A S CONTRACTORS OF NY I203/22/2026
FAIRMONT REALTY GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2021$325K—HSBC BANK USA, NATIONAL ASSOCIATION → FAIRMONT REALTY GROUP LLC$282/sf building
01/16/2020$838K—Private party → HSBC BANK USA, NATIONAL ASSOCIATION AS INDENTURE$727/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.602/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S CONTRACTORS OF NY IGeneral Contractor204/09/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616502/24/2026
TRIANGLE INSPECTION & TES7495211/29/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING07/15/2025
DOB NOWEarth WorkPermit IssuedA S CONTRACTORS OF NY I06/12/2025
DOB NOWConstruction FenceSigned-offA S CONTRACTORS OF NY I05/29/2025
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/27/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
03/05/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
03/05/2026Subgrade InspectionsFAHAD FATEHspecial
03/05/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/05/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/05/2026Mechanical SystemsFAHAD FATEHspecial
03/05/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/05/2026Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
03/05/2026Heating SystemsFAHAD FATEHspecial
03/05/2026FinalFAHAD FATEHprogress
03/05/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/05/2026Structural Wood FrameFAHAD FATEHprogress
03/05/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/05/2026PreliminaryFAHAD FATEHprogress
03/05/2026Footing and FoundationFAHAD FATEHprogress
03/05/2026Maintenance informationFAHAD FATEHenergy_progress
03/05/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/05/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/05/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/05/2026Permanent certificateFAHAD FATEHenergy_progress
03/05/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/05/2026Ventilation and air distribution systemFAHAD FATEHenergy_progress
03/05/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/05/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/05/2026MeteringFAHAD FATEHenergy_progress
03/05/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
Latest 25 of 36.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01178457-P2Request digital key ↗
08/20/2026Q01178457-P1Request digital key ↗
08/20/2026Q01178457-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026Q01178457-P3Open ↗
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-P3Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01178457-P2Open ↗
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q01178457-I1Open ↗
08/31/2026Q01178457-I1Open ↗
08/28/2026Q01178457-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026Q01178457-I1Open ↗
08/31/2026Q01178457-I1Open ↗
08/28/2026Q01178457-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/20/2026Q01178457-P3Open ↗
08/20/2026Q01178457-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q01178457-P2Open ↗
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-S2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026Q01178457-P3Open ↗
08/20/2026Q01178457-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026Q01178457-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-P3Open ↗
▸DOB NOWPlot Diagram2
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-P3Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01178457-P1Open ↗
08/20/2026Q01178457-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/20/2026Q01178457-I1Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q01178457-I1Open ↗