← Back
Two family converted from one family
172-25 127 AVENUE
QUEENS · BIN 4270121
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
1,940 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 3,234 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Floor 218p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC BUILDING SOLUTIONS CO403/22/2026
172-25 127TH AVE 2020,LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2022$980K—172-25 127TH AVE 2020, LLC → Private party$505/sf building
02/10/2021$360K—Private party → 172-25 127TH AVE 2020, LLC$186/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.504/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor407/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781404/20/2022
Building Lifecycle
All (93)Filed (5)Permit Issued (3)Signed Off (2)Violation (28)Inspection (9)Objection (16)Special Inspection (30)
11/15/2022
Signed off — Alteration CO
PROP. VERTICAL & HORIZONTAL ENLARGEMENT OF THE EXIST. ONE & HALF STORY, ONE-FAMILY BLDG INTO A TWO STORY, TWO-FAMILY BLDG AS SHOWN ON THE PLANS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILING TO RESOLVE ECB VIOLATION # 34842872J, 34842871H & VACP Q276/10.
Q00576021-S2
11/05/2022
Signed off — Alteration CO
PROP. VERTICAL & HORIZONTAL ENLARGEMENT OF THE EXIST. ONE & HALF STORY, ONE-FAMILY BLDG INTO A TWO STORY, TWO-FAMILY BLDG AS SHOWN ON THE PLANS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILING TO RESOLVE ECB VIOLATION # 34842872J, 34842871H & VACP Q276/10.
Q00576021-S1
04/26/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2022
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Masonry
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Chimneys and vents
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/25/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
04/25/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
04/20/2022
Filed — Alteration CO
PROP. VERTICAL & HORIZONTAL ENLARGEMENT OF THE EXIST. ONE & HALF STORY, ONE-FAMILY BLDG INTO A TWO STORY, TWO-FAMILY BLDG AS SHOWN ON THE PLANS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILING TO RESOLVE ECB VIOLATION # 34842872J, 34842871H & VACP Q276/10.
Q00576021-P3
04/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/15/2022
Permit issued — Plumbing
Q00576021-S2-PL
02/08/2022
Violation issued (ECB, closed)
Construction
02/08/2022
Violation issued (ECB, closed)
Construction
12/28/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/16/2021
Filed — Alteration CO
PROP. VERTICAL & HORIZONTAL ENLARGEMENT OF THE EXIST. ONE & HALF STORY, ONE-FAMILY BLDG INTO A TWO STORY, TWO-FAMILY BLDG AS SHOWN ON THE PLANS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILING TO RESOLVE ECB VIOLATION # 34842872J, 34842871H & VACP Q276/10.
Q00576021-P1
11/05/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/05/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Permit issued — General Construction
Q00576021-I1-GC-CX
10/14/2021
Permit issued — Construction Fence
Q00576021-S1-FN
09/30/2021
Filed — Alteration CO
PROP. VERTICAL & HORIZONTAL ENLARGEMENT OF THE EXIST. ONE & HALF STORY, ONE-FAMILY BLDG INTO A TWO STORY, TWO-FAMILY BLDG AS SHOWN ON THE PLANS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILING TO RESOLVE ECB VIOLATION # 34842872J, 34842871H & VACP Q276/10.
Q00576021-S2
09/30/2021
Filed — Alteration CO
PROP. VERTICAL & HORIZONTAL ENLARGEMENT OF THE EXIST. ONE & HALF STORY, ONE-FAMILY BLDG INTO A TWO STORY, TWO-FAMILY BLDG AS SHOWN ON THE PLANS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILING TO RESOLVE ECB VIOLATION # 34842872J, 34842871H & VACP Q276/10.
Q00576021-S1
09/15/2021
Objection raised — Scope
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Scope
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC02/15/2022
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO10/20/2021
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO10/14/2021
1 project · most recent 04/20/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2022Permit IssuedNYC BUILDING SOLUTIONS COVentilation Systems
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×6
Delta Breeze SMT150 150 CFM · Exhaust Fan ×4
2 projects · most recent 11/01/2021
General Wiring
FiledStatusContractorScope
11/01/2021CompleteRONEY ELECTRIC INC1 meters, 1 new_meters
10/26/2021CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 04/20/2022
Wood
FiledStatusContractorScope
04/20/2022Signed-offROCK E SMALL PLBG&HTG INCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/26/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/05/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
04/25/2022FinalCHRISTIAN LOZADAprogress
04/25/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
04/25/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/25/2022MeteringCHRISTIAN LOZADAenergy_progress
04/25/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/25/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/25/2022Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
04/25/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
04/25/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
04/25/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/25/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/25/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
04/25/2022Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
04/25/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/25/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/25/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/25/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/25/2022Footing and FoundationCHRISTIAN LOZADAprogress
04/25/2022Structural Wood FrameCHRISTIAN LOZADAprogress
04/25/2022Structural Steel - DetailsCHRISTIAN LOZADAspecial
04/25/2022Subgrade InspectionsCHRISTIAN LOZADAspecial
04/25/2022Mechanical SystemsCHRISTIAN LOZADAspecial
04/25/2022MasonryCHRISTIAN LOZADAspecial
04/25/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/25/2022Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
Latest 25 of 100.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00576021-S2Request digital key ↗
08/27/2026Q00576021-P1Request digital key ↗
08/27/2026Q00576021-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00576021-P3Open ↗
08/13/2026Q00576021-I1Open ↗
08/13/2026Q00576021-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00576021-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026Q00576021-I1Open ↗
08/30/2026Q00576021-I1Open ↗
08/24/2026Q00576021-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/30/2026Q00576021-I1Open ↗
08/30/2026Q00576021-I1Open ↗
08/30/2026Q00576021-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00576021-P1Open ↗
08/13/2026Q00576021-I1Open ↗
08/13/2026Q00576021-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00576021-I1Open ↗
08/13/2026Q00576021-P1Open ↗
08/13/2026Q00576021-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00576021-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00576021-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00576021-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q00576021-S2Open ↗
08/13/2026Q00576021-P3Open ↗
08/13/2026Q00576021-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00576021-I1Open ↗
08/13/2026Q00576021-S2Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00576021-P1Open ↗
08/13/2026Q00576021-P3Open ↗
08/13/2026Q00576021-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00576021-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00576021-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00576021-P1Open ↗
08/13/2026Q00576021-P3Open ↗
08/13/2026Q00576021-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00576021-I1Open ↗
08/13/2026Q00576021-P3Open ↗
08/13/2026Q00576021-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00576021-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00576021-I1Open ↗