← Back
Two family converted from one family
174-06 126 AVENUE
QUEENS · BIN 4270204
💬 Discuss this project
1960Year Built
2Stories
B3Building Class
R3AZoning
1,651 sfGross Floor Area
2Units
Two family converted from one family · 2,958 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 221p · 1 filing · 20 docs
Floor 122p · 1 filing · 20 docs
Cellar23p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUNE DANIEL ARCHITECT907/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor603/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUNE DANIEL ARCHITECT6062607/03/2025
NASIR J. KHANZADA LLC1527210/31/2023
Building Lifecycle
All (80)Filed (9)Permit Issued (3)Signed Off (2)Inspection (8)Objection (28)Special Inspection (30)
08/18/2025
Signed off — Alteration
Q00837764-I1
07/25/2025
Special inspection requirement — Subgrade Inspections
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Lighting controls
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Lighting in dwelling units
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Air barrier - visual inspection
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Insulation placement and R values
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Fenestration air leakage
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Fenestration areas
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
June Daniel-bradshaw
07/25/2025
Special inspection requirement — Masonry
June Daniel-bradshaw
07/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-P6
07/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Masonry
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Subgrade Inspections
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Fenestration air leakage
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Lighting controls
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Air barrier - visual inspection
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Insulation placement and R values
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Fenestration areas
June Daniel-bradshaw
06/30/2025
Special inspection requirement — Lighting in dwelling units
June Daniel-bradshaw
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-P5
02/25/2025
Special inspection requirement — Air barrier - visual inspection
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Masonry
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Subgrade Inspections
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Lighting controls
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Lighting in dwelling units
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Insulation placement and R values
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Fenestration areas
June Daniel-bradshaw
02/25/2025
Special inspection requirement — Fenestration air leakage
June Daniel-bradshaw
08/19/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-S1
06/13/2024
Objection raised — Other
06/13/2024
Objection resolved — Addressed
06/04/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-P4
05/30/2024
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
03/22/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-P3
12/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/31/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-P2
10/16/2023
Permit issued — Plumbing
Q00537124-S1-PL
03/22/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
DEMOLISH ROOF AND BUILD A SECOND FLOOR. CONNVERT ONE FAMILY TO A TWO FAMILY DWELLING UNIT. NEW KITCHEN AND BATHROOM.
Q00537124-P1
03/07/2023
Permit issued — Construction Fence
Q00837764-I1-FN
03/07/2023
Permit issued — General Construction
Q00537124-I1-GC
03/03/2023
Filed — Alteration
Q00837764-I1
10/28/2022
Objection raised — Admin
10/28/2022
Objection resolved — Addressed
10/28/2022
Objection raised — Admin
10/28/2022
Objection resolved — Addressed
10/28/2022
Objection raised — Inspections
10/28/2022
Objection resolved — Addressed
10/28/2022
Objection raised — Inspections
10/28/2022
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/16/2023
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC03/07/2023
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC03/07/2023
1 project · most recent 07/03/2025
Storm Water/Sanitary
FiledStatusContractorScope
07/03/2025Signed-offROCK E SMALL PLBG&HTG INCStorm, Water/Sanitary
2 projects · most recent 05/24/2024
General Wiring
FiledStatusContractorScope
05/24/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/01/2023CompletePOWER SURGE ELECTRIC, INC3 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2024Pass-Final Fence Non-Directive 14PassView ↗
12/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
07/25/2025Subgrade InspectionsJune Daniel-bradshawspecial
07/25/2025Lighting controlsJune Daniel-bradshawenergy_progress
07/25/2025Lighting in dwelling unitsJune Daniel-bradshawenergy_progress
07/25/2025Air barrier - visual inspectionJune Daniel-bradshawenergy_progress
07/25/2025Insulation placement and R valuesJune Daniel-bradshawenergy_progress
07/25/2025Fenestration air leakageJune Daniel-bradshawenergy_progress
07/25/2025Fenestration areasJune Daniel-bradshawenergy_progress
07/25/2025Fire-Resistant Penetrations and JointsJune Daniel-bradshawspecial
07/25/2025Structural Stability – Alterations of existing buildingsJune Daniel-bradshawspecial
07/25/2025MasonryJune Daniel-bradshawspecial
06/30/2025Fire-Resistant Penetrations and JointsJune Daniel-bradshawspecial
06/30/2025MasonryJune Daniel-bradshawspecial
06/30/2025Structural Stability – Alterations of existing buildingsJune Daniel-bradshawspecial
06/30/2025Subgrade InspectionsJune Daniel-bradshawspecial
06/30/2025Fenestration air leakageJune Daniel-bradshawenergy_progress
06/30/2025Lighting controlsJune Daniel-bradshawenergy_progress
06/30/2025Air barrier - visual inspectionJune Daniel-bradshawenergy_progress
06/30/2025Insulation placement and R valuesJune Daniel-bradshawenergy_progress
06/30/2025Fenestration areasJune Daniel-bradshawenergy_progress
06/30/2025Lighting in dwelling unitsJune Daniel-bradshawenergy_progress
02/25/2025Air barrier - visual inspectionJune Daniel-bradshawenergy_progress
02/25/2025Fire-Resistant Penetrations and JointsJune Daniel-bradshawspecial
02/25/2025MasonryJune Daniel-bradshawspecial
02/25/2025Structural Stability – Alterations of existing buildingsJune Daniel-bradshawspecial
02/25/2025Subgrade InspectionsJune Daniel-bradshawspecial
Latest 25 of 51.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q00837764-I1Request digital key ↗
08/22/2026Q00537124-P4Request digital key ↗
08/22/2026Q00537124-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026Q00537124-P3Open ↗
08/13/2026Q00537124-P1Open ↗
08/13/2026Q00537124-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00537124-I1Open ↗
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature30
09/01/2026Q00537124-P4Open ↗
09/01/2026Q00537124-P4Open ↗
09/01/2026Q00537124-P4Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026Q00537124-P4Open ↗
09/01/2026Q00537124-P4Open ↗
09/01/2026Q00537124-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q00837764-I1Open ↗
08/22/2026Q00537124-P5Open ↗
08/22/2026Q00537124-P4Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026Q00537124-I1Open ↗
08/13/2026Q00537124-P6Open ↗
08/13/2026Q00537124-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00537124-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00537124-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00537124-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026Q00537124-P4Open ↗
08/22/2026Q00537124-P3Open ↗
08/22/2026Q00537124-P6Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00537124-I1Open ↗
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026Q00537124-I1Open ↗
08/13/2026Q00537124-P1Open ↗
08/13/2026Q00537124-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026Q00537124-P6Open ↗
08/13/2026Q00537124-P5Open ↗
08/13/2026Q00537124-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00537124-I1Open ↗