← Back
Two stories - detached, small or mid-size
169-15 140 AVENUE
QUEENS · BIN 4270720
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R2Zoning
1,280 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES307/22/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor107/30/2026
Building Lifecycle
All (40)Filed (3)Permit Issued (1)Violation (2)Objection (5)Special Inspection (29)
09/03/2026
Objection resolved — Resolved
08/25/2026
Objection raised — Scope
08/05/2026
Objection resolved — Resolved
07/29/2026
Permit issued — Construction Fence
Q01411754-S1-FN
07/29/2026
Objection raised — Zoning
07/29/2026
Objection raised — Scope
07/22/2026
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT OF EXISTING TWO-STORY AND CELLAR BUILDING; ONE-FAMILY TO REMAIN.
Q01411754-S2
07/13/2026
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT OF EXISTING TWO-STORY AND CELLAR BUILDING; ONE-FAMILY TO REMAIN.
Q01411754-S1
07/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/13/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/13/2026
Special inspection requirement — Maintenance information
07/13/2026
Special inspection requirement — Permanent certificate
06/30/2026
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT OF EXISTING TWO-STORY AND CELLAR BUILDING; ONE-FAMILY TO REMAIN.
Q01411754-I1
06/10/2026
Special inspection requirement — Permanent certificate
06/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/10/2026
Special inspection requirement — Concrete - Cast-In-Place
06/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2026
Special inspection requirement — Masonry
06/10/2026
Special inspection requirement — Maintenance information
06/10/2026
Special inspection requirement — Metering
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
06/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/10/2026
Special inspection requirement — Fenestration areas
06/10/2026
Special inspection requirement — Fenestration air leakage
06/10/2026
Special inspection requirement — Interior lighting power
06/10/2026
Special inspection requirement — Air barrier - visual inspection
06/10/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/10/2026
Special inspection requirement — Insulation placement and R values
06/03/2026
Special inspection requirement — Footing and Foundation
06/03/2026
Special inspection requirement — Final
08/30/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPRECISION HOME DEV INC07/29/2026
1 project · most recent 07/22/2026
FiledStatusContractorScope
07/22/2026Permit IssuedPRECISION HOME DEV INC1 scope_items
1 project · most recent 07/22/2026
Fence
FiledStatusContractorScope
07/22/2026Permit IssuedPRECISION HOME DEV INCFence
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
07/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/13/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
07/13/2026Energy Code Compliance Inspections—progress
07/13/2026HVAC-R and service water heating system controls—energy_progress
07/13/2026HVAC-R and service water heating equipment—energy_progress
07/13/2026HVAC-R and service water piping design and insulation—energy_progress
07/13/2026Fire-Resistant Penetrations and Joints—special
07/13/2026Maintenance information—energy_progress
07/13/2026Permanent certificate—energy_progress
06/10/2026Permanent certificate—energy_progress
06/10/2026Subsurface Investigations (Borings/Test Pits)—special
06/10/2026Structural Stability – Alterations of existing buildings—special
06/10/2026Concrete - Cast-In-Place—special
06/10/2026Excavations - Sheeting, Shoring, and Bracing—special
06/10/2026Fire-Resistant Penetrations and Joints—special
06/10/2026Masonry—special
06/10/2026Maintenance information—energy_progress
06/10/2026Metering—energy_progress
06/10/2026Energy Code Compliance Inspections—progress
06/10/2026Fire-Resistance Rated Construction—progress
06/10/2026Fenestration areas—energy_progress
06/10/2026Fenestration air leakage—energy_progress
06/10/2026Interior lighting power—energy_progress
06/10/2026Air barrier - visual inspection—energy_progress
06/10/2026Electric vehicle service equipment requirements—energy_progress
Latest 25 of 29.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01411754-S1Request digital key ↗
08/16/2026Q01411754-S2Request digital key ↗
08/14/2026Q01411754-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q01411754-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01411754-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026Q01411754-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01411754-S2Open ↗
08/16/2026Q01411754-I1Open ↗
08/16/2026Q01411754-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026Q01411754-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026Q01411754-I1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026Q01411754-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/14/2026Q01411754-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01411754-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026Q01411754-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026Q01411754-I1Open ↗