One family attached or semi-detached
122-06 SPRINGFIELD BLVD
QUEENS · BIN 4274269
💬 Discuss this project
1950Year Built
1Stories
A5Building Class
R2Zoning
840 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR104/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERGER QUALITY ELEC'L CONElectrical103/22/2026
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475104/14/2025
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
10/01/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01209783-I1
05/21/2025
Permit issued — Solar
Q01209783-I1-SL
05/01/2025
Objection resolved — Addressed
05/01/2025
Objection resolved — Addressed
04/23/2025
Objection raised — Structural
04/23/2025
Objection raised — Electrical
04/14/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01209783-I1
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/11/2025
Special inspection requirement — Final
Andres Arias Londono
04/11/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY05/21/2025
1 project · most recent 04/13/2025
FiledStatusContractorScope
04/13/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/11/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/11/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/11/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/11/2025FinalAndres Arias Londonoprogress
04/11/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01209783-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01209783-I1Open ↗
09/23/2026Q01209783-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01209783-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01209783-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01209783-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01209783-I1Open ↗