← Back
Two stories - detached, small or mid-size
244-74 136 ROAD
QUEENS · BIN 4284574
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
966 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,625 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 8 docs
1 job · most recent 04/13/2025
FiledStatusContractorScope
04/13/2025Permit IssuedMAK ELECTRICAL CONTR CORP1 meters
1 job · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025Permit IssuedPATRIOT ENERGY SOL CO26 panels, 10.79 kw, 645 roof_area_sqft
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/17/2025
Permit issued — Solar
Q01207294-I1-SL
04/14/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q01207294-I1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
04/08/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
04/08/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC104/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116104/14/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedPATRIOT ENERGY SOL CO04/17/2025
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/08/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/08/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
04/08/2025FinalVYACHESLAV NECHAYEVprogress
04/08/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01207294-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q01207294-I1Open ↗
08/28/2026Q01207294-I1Open ↗
08/28/2026Q01207294-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01207294-I1Open ↗
08/28/2026Q01207294-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01207294-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01207294-I1Open ↗