← Back
Two stories - detached, small or mid-size
145-07 177 STREET
QUEENS · BIN 4285276
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R3-2Zoning
1,938 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.48 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC107/13/2026
M.S. SAVANI ARCHITECT, PC705/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCASTLE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXQUISITE CONSTRUCTION COGeneral Contractor603/21/2026
TRINITY SOLAR LLCGeneral Contractor107/15/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036107/13/2026
M.S. SAVANI ARCHITECT, PC3525505/15/2025
Building Lifecycle
All (67)Filed (8)Permit Issued (5)Signed Off (2)Inspection (8)Objection (14)Special Inspection (30)
07/14/2026
Permit issued — Solar
Q01429385-I1-SL
07/13/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01429385-I1
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
07/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
07/10/2026
Special inspection requirement — Final
Ayracon Almaraz
07/10/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
03/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Signed off — Alteration
HEREWITH TO PROPOSE PLUMBING WORK FOR PROPOSE SECOND FLOOR ADDITION APPLICATION FILED IN CONJUNCTION WITH ALT-1 DOB NOW # Q00567332-I1.
Q00598252-I1
05/15/2025
Filed — Alteration CO
HEREWITH TO PROPOSE SECOND FLOOR ADDITION TO EXISTING 1-STY BUILDING. EXISTING ONE FAMILY DWELLING TO REMAIN
Q00567332-P3
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Manish Savani
05/02/2025
Special inspection requirement — Mechanical Systems
Manish Savani
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Manish Savani
05/02/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Manish Savani
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Manish Savani
05/02/2025
Special inspection requirement — Final
Manish Savani
05/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Manish Savani
05/02/2025
Special inspection requirement — Structural Wood Frame
Manish Savani
05/02/2025
Special inspection requirement — Fenestration air leakage
Manish Savani
05/02/2025
Special inspection requirement — Interior lighting power
Manish Savani
05/02/2025
Special inspection requirement — Insulation placement and R values
Manish Savani
05/02/2025
Special inspection requirement — Fenestration areas
Manish Savani
05/02/2025
Special inspection requirement — Air barrier - visual inspection
Manish Savani
05/02/2025
Special inspection requirement — Lighting in dwelling units
Manish Savani
05/02/2025
Special inspection requirement — Permanent certificate
Manish Savani
05/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Manish Savani
05/02/2025
Special inspection requirement — Chimneys and vents
Manish Savani
05/02/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Manish Savani
03/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Manish Savani
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Manish Savani
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Manish Savani
01/22/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING WORK FOR PROPOSE SECOND FLOOR ADDITION APPLICATION FILED IN CONJUNCTION WITH ALT-1 DOB NOW # Q00567332-I1.
Q00598252-P2
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Manish Savani
11/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Manish Savani
11/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Manish Savani
10/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2024
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING WORK FOR PROPOSE SECOND FLOOR ADDITION APPLICATION FILED IN CONJUNCTION WITH ALT-1 DOB NOW # Q00567332-I1.
Q00598252-P1
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Manish Savani
07/23/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2024
Permit issued — Plumbing
Q00598252-I1-PL
02/07/2023
Signed off — Alteration
Q00595146-I1
09/30/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2022
Permit issued — Plumbing
Q00598252-I1-PL
05/23/2022
Permit issued — Structural
Q00567332-I1-GC-CX
03/22/2022
Filed — Alteration CO
HEREWITH TO PROPOSE SECOND FLOOR ADDITION TO EXISTING 1-STY BUILDING. EXISTING ONE FAMILY DWELLING TO REMAIN
Q00567332-P1
03/08/2022
Permit issued — Construction Fence
Q00595146-I1-FN
11/01/2021
Objection resolved — Addressed
11/01/2021
Objection resolved — Addressed
10/28/2021
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING WORK FOR PROPOSE SECOND FLOOR ADDITION APPLICATION FILED IN CONJUNCTION WITH ALT-1 DOB NOW # Q00567332-I1.
Q00598252-I1
10/25/2021
Objection resolved — Addressed
10/25/2021
Objection resolved — Addressed
10/18/2021
Filed — Alteration
Q00595146-I1
10/18/2021
Objection resolved — Addressed
10/01/2021
Objection resolved — Addressed
10/01/2021
Objection resolved — Addressed
09/13/2021
Objection raised — Fire_Protection
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC07/14/2026
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/13/2024
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING07/20/2022
DOB NOWStructuralPermit IssuedEXQUISITE CONSTRUCTION CO05/23/2022
DOB NOWConstruction FenceSigned-offEXQUISITE CONSTRUCTION CO03/08/2022
1 project · most recent 05/15/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/15/2025Permit IssuedEXQUISITE CONSTRUCTION COVentilation Systems
Ventilation
Broan-Nutone PEN811 100 CFM · Exhaust Fan ×2
2 projects · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026Permit IssuedREDLINE ELECTRIC INC—
07/12/2022CompleteTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 05/15/2025
Wood
FiledStatusContractorScope
05/15/2025Permit IssuedEXQUISITE CONSTRUCTION COWood
1 project · most recent 07/13/2026
FiledStatusContractorScope
07/13/2026Permit IssuedTRINITY SOLAR LLC9 panels, 3.69 kw, 1,102 roof_area_sqft
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/30/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
07/10/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
07/10/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
07/10/2026Energy Code Compliance InspectionsAyracon Almarazprogress
07/10/2026FinalAyracon Almarazprogress
07/10/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
05/02/2025Fire-Resistant Penetrations and JointsManish Savanispecial
05/02/2025Mechanical SystemsManish Savanispecial
05/02/2025Structural Stability – Alterations of existing buildingsManish Savanispecial
05/02/2025Wall Panels, Curtain Walls, and VeneersManish Savanispecial
05/02/2025Energy Code Compliance InspectionsManish Savaniprogress
05/02/2025FinalManish Savaniprogress
05/02/2025Fire-Resistance Rated ConstructionManish Savaniprogress
05/02/2025Structural Wood FrameManish Savaniprogress
05/02/2025Fenestration air leakageManish Savanienergy_progress
05/02/2025Interior lighting powerManish Savanienergy_progress
05/02/2025Insulation placement and R valuesManish Savanienergy_progress
05/02/2025Fenestration areasManish Savanienergy_progress
05/02/2025Air barrier - visual inspectionManish Savanienergy_progress
05/02/2025Lighting in dwelling unitsManish Savanienergy_progress
05/02/2025Permanent certificateManish Savanienergy_progress
05/02/2025Fenestration and door U-factor and product ratingsManish Savanienergy_progress
05/02/2025Chimneys and ventsManish Savanispecial
05/02/2025Exterior Insulation and Finish Systems (EIFS)Manish Savanispecial
02/13/2025HVAC-R and service water piping design and insulationManish Savanienergy_progress
02/13/2025Fire-Resistant Penetrations and JointsManish Savanispecial
Latest 25 of 32.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00595146-I1Request digital key ↗
08/21/2026Q00598252-P2Request digital key ↗
08/21/2026Q00598252-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/14/2026Q00567332-I1Open ↗
08/13/2026Q00567332-P3Open ↗
08/13/2026Q00567332-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q00567332-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature11
09/06/2026Q01429385-I1Open ↗
09/06/2026Q01429385-I1Open ↗
09/06/2026Q01429385-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026Q00567332-P1Open ↗
08/20/2026Q00567332-P3Open ↗
08/20/2026Q00567332-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/06/2026Q01429385-I1Open ↗
09/06/2026Q01429385-I1Open ↗
09/01/2026Q00598252-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/20/2026Q00567332-P3Open ↗
08/20/2026Q00567332-P1Open ↗
08/14/2026Q00567332-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q00567332-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/14/2026Q00567332-I1Open ↗
08/13/2026Q00598252-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01429385-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026Q00567332-I1Open ↗
08/13/2026Q00598252-I1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram3
08/14/2026Q00567332-I1Open ↗
08/13/2026Q00567332-P3Open ↗
08/13/2026Q00567332-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/14/2026Q00567332-I1Open ↗
08/13/2026Q00567332-P1Open ↗
08/13/2026Q00567332-P3Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026Q00567332-I1Open ↗
08/13/2026Q00567332-P3Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q00567332-I1Open ↗