← Back
Two family converted from one family
146-12 175 STREET
QUEENS · BIN 4285323
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3-2Zoning
2,245 sfGross Floor Area
2Units
Rent Stabilized82 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: 226-11 STREET REALTY INC · 3,760 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingCivil
Floor 214p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUNT B CONSTRUCTION203/22/2026
226-11 STREET REALTY INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/04/2021$180K—Private party → 226-11 STREET REALTY INC$80/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAKHTIAR SHAMLOO302/25/2026
TABRIZ DESIGN GROUP401/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUNT B CONSTRUCTION INCGeneral Contractor403/21/2026
YAFE MEOD CORPGeneral Contractor303/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275502/25/2026
Building Lifecycle
All (108)Filed (7)Permit Issued (5)Violation (60)Inspection (6)Special Inspection (30)
03/17/2026
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Final
HARI SONI
03/17/2026
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
02/25/2026
Filed — Alteration CO
Q00685919-P2
01/21/2026
Filed — Alteration
PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION JOB NUMBER Q00685919.
Q00758811-P1
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
01/21/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
11/25/2025
Violation issued (HPD, open)
I
10/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/22/2025
Permit issued — Plumbing
Q00758811-I1-PL
12/05/2024
Violation issued (HPD, open)
I
04/01/2024
Permit issued — General Construction
Q00685919-I1-GC
01/22/2024
Violation issued (ECB, open)
Construction
11/30/2023
Violation issued (HPD, open)
I
10/18/2023
Violation issued (ECB, closed)
Construction
09/18/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/18/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/01/2023
Permit issued — Plumbing
Q00758811-I1-PL
01/18/2023
Violation issued (ECB, closed)
Construction
12/12/2022
Permit issued — Earth Work
Q00685919-I1-GC
11/18/2022
Violation issued (HPD, open)
I
11/16/2022
Filed — Alteration CO
Q00685919-P1
11/16/2022
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
11/16/2022
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
11/16/2022
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
11/16/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
11/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/17/2022
Permit issued — Construction Fence
Q00702556-I1-FN
07/11/2022
Filed — Alteration
Q00759168-I1
07/11/2022
Filed — Alteration
PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION JOB NUMBER Q00685919.
Q00758811-I1
06/08/2022
Filed — Alteration CO
Q00685919-I1
03/21/2022
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE.
Q00702556-I1
03/17/2022
Violation issued (HPD, open)
I
04/22/2021
Violation issued (HPD, open)
I
02/12/2018
Violation issued (ECB, closed)
Construction
01/09/2018
Violation issued (HPD, closed)
I
05/16/2013
Violation issued (HPD, open)
B
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC08/22/2025
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP04/01/2024
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEAT07/01/2023
DOB NOWEarth WorkPermit IssuedHUNT B CONSTRUCTION INC12/12/2022
DOB NOWConstruction FencePermit IssuedHUNT B CONSTRUCTION INC08/17/2022
1 project · most recent 01/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/21/2026Permit IssuedROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
1 project · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 03/21/2022
Fence
FiledStatusContractorScope
03/21/2022Permit IssuedHUNT B CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/18/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/18/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
03/17/2026Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
03/17/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/17/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
03/17/2026MasonryBAKHTIAR SHAMLOOspecial
03/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
03/17/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
03/17/2026FinalHARI SONIprogress
03/17/2026Footing and FoundationBAKHTIAR SHAMLOOprogress
03/17/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
03/17/2026Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
03/17/2026Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
03/17/2026MeteringBAKHTIAR SHAMLOOenergy_progress
03/17/2026Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
03/17/2026Fenestration areasBAKHTIAR SHAMLOOenergy_progress
03/17/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
03/17/2026Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
03/17/2026Maintenance informationBAKHTIAR SHAMLOOenergy_progress
03/17/2026Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
03/17/2026Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
03/17/2026Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
03/17/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
03/17/2026HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/21/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
11/16/2022Fenestration areasBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 46.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00702556-I1Request digital key ↗
08/26/2026Q00759168-I1Request digital key ↗
08/25/2026Q00685919-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00685919-P2Open ↗
08/13/2026Q00685919-P1Open ↗
08/13/2026Q00685919-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature30
09/02/2026Q00685919-I1Open ↗
09/02/2026Q00685919-I1Open ↗
09/02/2026Q00685919-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026Q00685919-I1Open ↗
09/02/2026Q00685919-I1Open ↗
09/02/2026Q00685919-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026Q00758811-I1Open ↗
08/17/2026Q00758811-P1Open ↗
08/13/2026Q00759168-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00685919-P2Open ↗
08/13/2026Q00685919-P1Open ↗
08/13/2026Q00685919-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026Q00758811-P1Open ↗
08/17/2026Q00758811-I1Open ↗
08/13/2026Q00685919-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00685919-P2Open ↗
08/13/2026Q00685919-I1Open ↗
08/13/2026Q00685919-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00685919-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00685919-P2Open ↗
08/13/2026Q00685919-P1Open ↗
08/13/2026Q00685919-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00685919-P1Open ↗
08/13/2026Q00685919-I1Open ↗
08/13/2026Q00685919-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00685919-I1Open ↗
08/13/2026Q00685919-P2Open ↗
08/13/2026Q00685919-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026Q00685919-I1Open ↗
08/13/2026Q00685919-P2Open ↗
08/13/2026Q00685919-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00685919-I1Open ↗