← Back
Two family converted from one family
146-38 181 STREET
QUEENS · BIN 4285957
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3-2Zoning
1,845 sfGross Floor Area
2Units
9 Open Violations ▸
Two family converted from one family · Owner of record: LEGACY VII TRUST · 4,000 sf lot · 0.46 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 9 docs
Floor 2Under Construction2p · 1 filing · 9 docs
Floor 1
CellarUnder Construction6p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYRTLE DEVELOPMENT105/15/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.204/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NCR CONSTRUCTION INCGeneral Contractor105/15/2026
Building Lifecycle
All (40)Filed (2)Permit Issued (1)Violation (9)Special Inspection (28)
06/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/13/2026
Permit issued — Construction Fence
Q01385107-S2-FN
04/28/2026
Filed — Alteration
Proposed installation of temporary construction fence in conjunction with alteration application # Q01385107-I1
Q01385107-S2
04/25/2026
Filed — Alteration
Proposed installation of temporary construction fence in conjunction with alteration application # Q01385107-I1
Q01385107-I1
04/25/2026
Special inspection requirement — Fenestration air leakage
04/25/2026
Special inspection requirement — Metering
04/25/2026
Special inspection requirement — Permanent certificate
04/25/2026
Special inspection requirement — Insulation placement and R values
04/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/25/2026
Special inspection requirement — Ventilation and air distribution system
04/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/25/2026
Special inspection requirement — Concrete - Cast-In-Place
04/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/25/2026
Special inspection requirement — Heating Systems
04/25/2026
Special inspection requirement — Energy Code Compliance Inspections
04/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/25/2026
Special inspection requirement — Preliminary
04/25/2026
Special inspection requirement — Structural Wood Frame
04/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/25/2026
Special inspection requirement — Air barrier - visual inspection
04/25/2026
Special inspection requirement — Fenestration areas
04/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/25/2026
Special inspection requirement — Interior lighting power
04/25/2026
Special inspection requirement — Maintenance information
04/11/2026
Special inspection requirement — Chimneys and vents
04/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/09/2026
Special inspection requirement — Mechanical Systems
04/09/2026
Special inspection requirement — Final
04/09/2026
Special inspection requirement — Footing and Foundation
08/31/2012
Violation issued (HPD, open)
A
08/31/2012
Violation issued (HPD, open)
B
08/31/2012
Violation issued (HPD, open)
B
08/31/2012
Violation issued (HPD, open)
A
08/31/2012
Violation issued (HPD, open)
B
06/05/2012
Violation issued (HPD, open)
B
06/05/2012
Violation issued (HPD, open)
B
12/28/2011
Violation issued (HPD, open)
B
12/28/2011
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedNCR CONSTRUCTION INC05/13/2026
1 project · most recent 04/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/28/2026Permit IssuedNCR CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tuttokool AAC5048E1000A 45,000 BTU · Condensing Unit ×2
AGF96M120D5B 115,000 BTU · Furnace ×2
Ventilation
Panasonic FV-06VQ5 60 CFM · Exhaust Fan ×5
1 project · most recent 04/28/2026
Concrete Wood
FiledStatusContractorScope
04/28/2026Permit IssuedNCR CONSTRUCTION INCConcrete, Wood
1 project · most recent 04/28/2026
Fence
FiledStatusContractorScope
04/28/2026Permit IssuedNCR CONSTRUCTION INCFence
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/17/2026Subsurface Investigations (Borings/Test Pits)—special
04/25/2026Fenestration air leakage—energy_progress
04/25/2026Metering—energy_progress
04/25/2026Permanent certificate—energy_progress
04/25/2026Insulation placement and R values—energy_progress
04/25/2026Duct leakage testing, insulation and design—energy_progress
04/25/2026Ventilation and air distribution system—energy_progress
04/25/2026Excavations - Sheeting, Shoring, and Bracing—special
04/25/2026Concrete - Cast-In-Place—special
04/25/2026Fire-Resistant Penetrations and Joints—special
04/25/2026Heating Systems—special
04/25/2026Energy Code Compliance Inspections—progress
04/25/2026Fire-Resistance Rated Construction—progress
04/25/2026Preliminary—progress
04/25/2026Structural Wood Frame—progress
04/25/2026Fenestration and door U-factor and product ratings—energy_progress
04/25/2026HVAC-R and service water heating system controls—energy_progress
04/25/2026Air barrier - visual inspection—energy_progress
04/25/2026Fenestration areas—energy_progress
04/25/2026HVAC-R and service water piping design and insulation—energy_progress
04/25/2026HVAC-R and service water heating equipment—energy_progress
04/25/2026Interior lighting power—energy_progress
04/25/2026Maintenance information—energy_progress
04/11/2026Chimneys and vents—special
04/11/2026Structural Stability – Alterations of existing buildings—special
Latest 25 of 28.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01385107-S2Request digital key ↗
08/17/2026Q01385107-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01385107-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01385107-S2Open ↗
08/17/2026Q01385107-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01385107-I1Open ↗
▸Other Documents3
▸DOB NOWPlot Diagram1
08/17/2026Q01385107-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01385107-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01385107-I1Open ↗