← Back
One story - permanent living quarter
228-11 145 AVENUE
QUEENS · BIN 4287246
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3-1Zoning
984 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.25 FAR built · Flood zone X500
Locations of Work
StructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASON REAL ESTATE609/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES408/19/2026
TOM PETERSEN ARCHITECT, LLC107/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor207/08/2026
KAMTECH RESTORATION CORPGeneral Contractor107/19/2026
INFINITI ESC PLUMBING CORPlumbing108/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854107/16/2026
TABRIZ GROUP ENTERPRISES3275204/27/2026
TRIANGLE INSPECTION & TES7495104/27/2026
Building Lifecycle
All (49)Filed (5)Permit Issued (4)Inspection (5)Objection (5)Special Inspection (30)
08/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2026
Filed — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01392330-S3
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
08/19/2026
Special inspection requirement — Ventilation and air distribution system
08/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/19/2026
Special inspection requirement — Permanent certificate
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/03/2026
Permit issued — Plumbing
Q01392330-S2-PL
07/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/17/2026
Permit issued — Solar
Q01432045-I1-SL
07/16/2026
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01432045-I1
06/29/2026
Permit issued — Foundation
Q01392330-I1-GC-CX
06/26/2026
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
05/18/2026
Permit issued — Construction Fence
Q01392330-S1-FN
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/14/2026
Special inspection requirement — Mechanical Systems
05/14/2026
Special inspection requirement — Final
04/27/2026
Filed — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01392330-S2
04/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
04/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
04/27/2026
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
04/27/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
04/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
04/24/2026
Filed — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01392330-S1
04/24/2026
Filed — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01392330-I1
04/24/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
04/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/24/2026
Special inspection requirement — Final
BAKHTIAR SHAMLOO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR08/03/2026
DOB NOWSolarPermit IssuedKAMTECH RESTORATION CORP07/17/2026
DOB NOWFoundationPermit IssuedKAIETEUR CONSTRUCTION INC.06/29/2026
DOB NOWConstruction FencePermit IssuedKAIETEUR CONSTRUCTION INC.05/18/2026
1 project · most recent 08/19/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedKAIETEUR CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Goodman GLXS3BN6010 5 tons · Condensing Unit ×2
GR9S800603BN 60,000 BTU · Furnace ×1
GR9S921005CN 100,000 BTU · Furnace ×1
Ventilation
Delta Breeze SM70 70 CFM · Exhaust Fan ×5
Glacier BCSQ130SS 300 CFM · Kitchen Exhaust ×2
1 project · most recent 08/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
2 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
07/15/2026Permit IssuedBERGER QUALITY ELEC'L CON—
1 project · most recent 08/19/2026
FiledStatusContractorScope
08/19/2026Permit IssuedINFINITI ESC PLUMBING COR2 scope_items
1 project · most recent 07/16/2026
FiledStatusContractorScope
07/16/2026Permit IssuedKAMTECH RESTORATION CORP14 panels, 5.74 kw, 688.68 roof_area_sqft
1 project · most recent 08/19/2026
Fence
FiledStatusContractorScope
08/19/2026Permit IssuedINFINITI ESC PLUMBING CORFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/19/2026Energy Code Compliance Inspections—progress
08/19/2026Ventilation and air distribution system—energy_progress
08/19/2026Duct leakage testing, insulation and design—energy_progress
08/19/2026HVAC-R and service water heating system controls—energy_progress
08/19/2026Permanent certificate—energy_progress
08/19/2026HVAC-R and service water piping design and insulation—energy_progress
08/19/2026HVAC-R and service water heating equipment—energy_progress
06/26/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
05/14/2026Mechanical Systems—special
05/14/2026Final—progress
04/27/2026HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
04/27/2026HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
04/27/2026Maintenance informationBAKHTIAR SHAMLOOenergy_progress
04/27/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
04/27/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/27/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
04/27/2026HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
04/24/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
04/24/2026Fenestration areasBAKHTIAR SHAMLOOenergy_progress
04/24/2026Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
04/24/2026MeteringBAKHTIAR SHAMLOOenergy_progress
04/24/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
04/24/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
04/24/2026Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
Latest 25 of 40.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026Q01392330-S3Request digital key ↗
08/17/2026Q01392330-I1Request digital key ↗
08/17/2026Q01392330-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01392330-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01392330-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01392330-S3Open ↗
08/17/2026Q01392330-S1Open ↗
08/17/2026Q01392330-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/22/2026Q01392330-I1Open ↗
09/22/2026Q01392330-I1Open ↗
09/01/2026Q01392330-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/22/2026Q01392330-I1Open ↗
09/22/2026Q01392330-I1Open ↗
09/01/2026Q01392330-S2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01392330-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026Q01392330-S3Open ↗
08/17/2026Q01392330-I1Open ↗
08/16/2026Q01432045-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026Q01392330-I1Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026Q01392330-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/17/2026Q01392330-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01392330-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026Q01392330-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01392330-I1Open ↗