← Back
One story - permanent living quarter
231-01 EDGEWOOD AVENUE
QUEENS · BIN 4287549
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3-1Zoning
—Gross Floor Area
1Units
One story - permanent living quarter · 0.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Roof2p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 1
Cellar4p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC107/14/2026
Building Lifecycle
All (28)Filed (1)Special Inspection (27)
07/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT-1 FILING TO CONVERT ONE TO TWO FAMILY DWELLING WITH REAR EXTENSION AND NEW 2ND FLOOR
Q01429345-I1
07/13/2026
Special inspection requirement — Protection of exposed foundation insulation
07/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
07/13/2026
Special inspection requirement — Designated Seismic System
07/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/13/2026
Special inspection requirement — Masonry
07/13/2026
Special inspection requirement — Subgrade Inspections
07/13/2026
Special inspection requirement — Wood – Seismic Resistance
07/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/13/2026
Special inspection requirement — Fenestration areas
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/13/2026
Special inspection requirement — Structural Wood Frame
07/13/2026
Special inspection requirement — Air barrier — testing
07/13/2026
Special inspection requirement — Insulation placement and R values
07/13/2026
Special inspection requirement — Metering
07/13/2026
Special inspection requirement — Air barrier - visual inspection
07/13/2026
Special inspection requirement — Fenestration air leakage
07/13/2026
Special inspection requirement — Interior lighting power
07/13/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/13/2026
Special inspection requirement — Maintenance information
07/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/13/2026
Special inspection requirement — Permanent certificate
07/10/2026
Special inspection requirement — Final
07/10/2026
Special inspection requirement — Footing and Foundation
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUED1ST LIGHT ENERGY INC01/25/2017
1 project · most recent 07/14/2026
Wood
FiledStatusContractorScope
07/14/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/13/2026Protection of exposed foundation insulation—energy_progress
07/13/2026Structural Steel - High Strength Bolting—special
07/13/2026Concrete - Cast-In-Place—special
07/13/2026Designated Seismic System—special
07/13/2026Excavations - Sheeting, Shoring, and Bracing—special
07/13/2026Fire-Resistant Penetrations and Joints—special
07/13/2026Masonry—special
07/13/2026Subgrade Inspections—special
07/13/2026Wood – Seismic Resistance—special
07/13/2026Subsurface Investigations (Borings/Test Pits)—special
07/13/2026Fenestration areas—energy_progress
07/13/2026Structural Stability – Alterations of existing buildings—special
07/13/2026Energy Code Compliance Inspections—progress
07/13/2026Fire-Resistance Rated Construction—progress
07/13/2026Structural Wood Frame—progress
07/13/2026Air barrier — testing —energy_progress
07/13/2026Insulation placement and R values—energy_progress
07/13/2026Metering—energy_progress
07/13/2026Air barrier - visual inspection—energy_progress
07/13/2026Fenestration air leakage—energy_progress
07/13/2026Interior lighting power—energy_progress
07/13/2026Electric vehicle service equipment requirements—energy_progress
07/13/2026Maintenance information—energy_progress
07/13/2026Fenestration and door U-factor and product ratings—energy_progress
07/13/2026Permanent certificate—energy_progress
Latest 25 of 27.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01429345-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/24/2017440379314Open ↗
▸BISWORK PERMIT APPLICATION1
01/24/2017440379314Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01429345-I1Open ↗
▸Seals & Professional Certifications4
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/24/2017440379314Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/24/2017440379314Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2017440379314Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01429345-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
01/24/2017440379314Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/24/2017440379314Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/24/2017440379314Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/24/2017440379314Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/24/2017440379314Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026Q01429345-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/24/2017440379314Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/24/2017440379314Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01429345-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01429345-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026Q01429345-I1Open ↗