1968Year Built
2Stories
C0Building Class
R3XZoning
2,350 sfGross Floor Area
3Units
1 Open Violation ▸
Three families · 4,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BKH ARCHITECT, PLLC108/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BKH ARCHITECT, PLLC6255108/17/2026
Building Lifecycle
All (26)Filed (1)Violation (1)Special Inspection (24)
08/17/2026
Filed — Alteration
direct replace bathroom and kitchen fixtures; new 3 piece cellar bathroom filed with ACRIS
Q01441300-I1
08/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Brandon Hamchuk
08/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Brandon Hamchuk
08/10/2026
Special inspection requirement — Exterior lighting power
Brandon Hamchuk
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Brandon Hamchuk
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brandon Hamchuk
08/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
Brandon Hamchuk
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Brandon Hamchuk
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Brandon Hamchuk
08/10/2026
Special inspection requirement — Structural Wood Frame
Brandon Hamchuk
08/10/2026
Special inspection requirement — Maintenance information
Brandon Hamchuk
08/10/2026
Special inspection requirement — Insulation placement and R values
Brandon Hamchuk
08/10/2026
Special inspection requirement — Fenestration areas
Brandon Hamchuk
08/10/2026
Special inspection requirement — Interior lighting power
Brandon Hamchuk
08/10/2026
Special inspection requirement — Permanent certificate
Brandon Hamchuk
08/10/2026
Special inspection requirement — Lighting controls
Brandon Hamchuk
08/10/2026
Special inspection requirement — Lighting in dwelling units
Brandon Hamchuk
08/10/2026
Special inspection requirement — Shutoff dampers
Brandon Hamchuk
08/10/2026
Special inspection requirement — Ventilation and air distribution system
Brandon Hamchuk
08/10/2026
Special inspection requirement — Air barrier - visual inspection
Brandon Hamchuk
08/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Brandon Hamchuk
08/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
Brandon Hamchuk
08/05/2026
Special inspection requirement — Mechanical Systems
Brandon Hamchuk
08/05/2026
Special inspection requirement — Final
Brandon Hamchuk
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Brandon Hamchuk
07/28/2025
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 08/17/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026——Ventilation Systems
Ventilation
1 project · most recent 08/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2026——Gas, Water/Sanitary
1 project · most recent 04/17/2026
FiledStatusContractorScope
04/17/2026Permit IssuedALL WAYS ELECTRIC CORP.W3 meters
1 project · most recent 08/17/2026
Wood
FiledStatusContractorScope
08/17/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/10/2026HVAC-R and service water heating system controlsBrandon Hamchukenergy_progress
08/10/2026HVAC-R and service water heating equipmentBrandon Hamchukenergy_progress
08/10/2026Exterior lighting powerBrandon Hamchukenergy_progress
08/10/2026Fenestration and door U-factor and product ratingsBrandon Hamchukenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
08/10/2026Tenant Protection Plan ComplianceBrandon Hamchukspecial
08/10/2026Energy Code Compliance InspectionsBrandon Hamchukprogress
08/10/2026Fire-Resistance Rated ConstructionBrandon Hamchukprogress
08/10/2026Structural Wood FrameBrandon Hamchukprogress
08/10/2026Maintenance informationBrandon Hamchukenergy_progress
08/10/2026Insulation placement and R valuesBrandon Hamchukenergy_progress
08/10/2026Fenestration areasBrandon Hamchukenergy_progress
08/10/2026Interior lighting powerBrandon Hamchukenergy_progress
08/10/2026Permanent certificateBrandon Hamchukenergy_progress
08/10/2026Lighting controlsBrandon Hamchukenergy_progress
08/10/2026Lighting in dwelling unitsBrandon Hamchukenergy_progress
08/10/2026Shutoff dampersBrandon Hamchukenergy_progress
08/10/2026Ventilation and air distribution systemBrandon Hamchukenergy_progress
08/10/2026Air barrier - visual inspectionBrandon Hamchukenergy_progress
08/10/2026HVAC-R and service water piping design and insulationBrandon Hamchukenergy_progress
08/10/2026Duct leakage testing, insulation and designBrandon Hamchukenergy_progress
08/05/2026Mechanical SystemsBrandon Hamchukspecial
08/05/2026FinalBrandon Hamchukprogress
08/05/2026Structural Stability – Alterations of existing buildingsBrandon Hamchukspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01441300-S1Request digital key ↗
08/18/2026Q01441300-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q01441300-I1Open ↗
08/25/2026Q01441300-I1Open ↗
08/25/2026Q01441300-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01441300-I1Open ↗
08/25/2026Q01441300-I1Open ↗
08/25/2026Q01441300-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01441300-S1Open ↗
08/18/2026Q01441300-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/18/2026Q01441300-I1Open ↗
08/18/2026Q01441300-S1Open ↗