| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/05/2026 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Cooper & Hunter CH-N48LCU-230VO 55,000 BTU · Condensing Unit ×1 CH-N60LCU-230VO 60,000 BTU · Condensing Unit ×1 Heating Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×6 Delta Breeze SMT150 150 CFM · Kitchen Exhaust ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | — | — | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | — | — | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| 135-223 STREET | 1 | 09/01/2026 |
| THE OWNER OF | 2 | 03/22/2026 |
| OWNER OF PREMISES | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| NKM ENGINEERING PLLC | 2 | 08/05/2026 |
| PETER CHO ARCHITECTS, PLLC | 1 | 08/05/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/29/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/29/2026 | Mechanical Systems | — | special |
| 06/29/2026 | Concrete - Cast-In-Place | — | special |
| 06/29/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/29/2026 | Heating Systems | — | special |
| 06/29/2026 | Masonry | — | special |
| 06/29/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 06/29/2026 | Structural Steel - Details | — | special |
| 06/29/2026 | Structural Steel - High Strength Bolting | — | special |
| 06/29/2026 | Subgrade Inspections | — | special |
| 06/29/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 06/29/2026 | Final | — | progress |
| 06/29/2026 | Footing and Foundation | — | progress |
| 06/29/2026 | Energy Code Compliance Inspections | — | progress |
| 06/29/2026 | Fire-Resistance Rated Construction | — | progress |
| 06/29/2026 | Structural Wood Frame | — | progress |
| 06/29/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 06/29/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 06/29/2026 | Fenestration areas | — | energy_progress |
| 06/29/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/29/2026 | Electric vehicle service equipment requirements | — | energy_progress |
| 06/29/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/29/2026 | Metering | — | energy_progress |
| 06/29/2026 | Interior lighting power | — | energy_progress |