← Back
Two family frame
250-03 FRANCIS LEWIS BLVD
QUEENS · BIN 4289280
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R3XZoning
2,340 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,550 sf lot · 0.51 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 11p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUNE DANIEL ARCHITECT410/16/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKSSKR CONSULTING SERVICEGeneral Contractor303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUNE DANIEL ARCHITECT6062310/16/2024
Building Lifecycle
All (44)Filed (4)Permit Issued (2)Signed Off (2)Violation (25)Inspection (3)Objection (2)Special Inspection (6)
12/06/2024
Signed off — Alteration
1. LEGALIZE LAVATORY TOILET AND SHOWER IN CELLAR. 2. DEMOLISH EXISTING WALLS IN CELLAR.3. ADD NEW 1HR RATED WALL AND FPSC DOOR IN BOILER ROOM.
Q00817962-I1
12/06/2024
Signed off — Alteration
1. LEGALIZE LAVATORY TOILET AND SHOWER IN CELLAR. 2. DEMOLISH EXISTING WALLS IN CELLAR.3. ADD NEW 1HR RATED WALL AND FPSC DOOR IN BOILER ROOM.
Q00817962-S2
12/05/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
June Daniel-bradshaw
10/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
June Daniel-bradshaw
10/16/2024
Filed — Alteration
1. LEGALIZE LAVATORY TOILET AND SHOWER IN CELLAR. 2. DEMOLISH EXISTING WALLS IN CELLAR.3. ADD NEW 1HR RATED WALL AND FPSC DOOR IN BOILER ROOM.
Q00817962-P2
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
June Daniel-bradshaw
10/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
June Daniel-bradshaw
10/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/11/2024
Permit issued — Plumbing
Q00817962-S2-PL
07/01/2024
Filed — Alteration
1. LEGALIZE LAVATORY TOILET AND SHOWER IN CELLAR. 2. DEMOLISH EXISTING WALLS IN CELLAR.3. ADD NEW 1HR RATED WALL AND FPSC DOOR IN BOILER ROOM.
Q00817962-S2
04/15/2024
Filed — Alteration
1. LEGALIZE LAVATORY TOILET AND SHOWER IN CELLAR. 2. DEMOLISH EXISTING WALLS IN CELLAR.3. ADD NEW 1HR RATED WALL AND FPSC DOOR IN BOILER ROOM.
Q00817962-P1
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
June Daniel-bradshaw
04/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
June Daniel-bradshaw
04/09/2024
Permit issued — General Construction
Q00817962-I1-GC
05/01/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Fire_Protection
02/21/2023
Filed — Alteration
1. LEGALIZE LAVATORY TOILET AND SHOWER IN CELLAR. 2. DEMOLISH EXISTING WALLS IN CELLAR.3. ADD NEW 1HR RATED WALL AND FPSC DOOR IN BOILER ROOM.
Q00817962-I1
12/02/2021
Violation issued (ECB, closed)
Construction
09/30/2021
Violation issued (ECB, closed)
Construction
08/13/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2020
Violation issued (ECB, closed)
Quality of Life
01/28/2020
Violation issued (ECB, closed)
Construction
01/28/2020
Violation issued (ECB, closed)
Quality of Life
01/28/2020
Violation issued (ECB, closed)
Quality of Life
01/28/2020
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC09/11/2024
DOB NOWGeneral ConstructionSigned-offMKSSKR CONSULTING SERVICE04/09/2024
BISOTISSUEDPATRIOT ENERGY SOL CO08/02/2021
2 projects · most recent 09/30/2024
General Wiring
FiledStatusContractorScope
09/30/2024CompleteWCK ELECTRIC CORP.General Wiring
09/03/2021CompleteMAK ELECTRICAL CONTR CORP3 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/05/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/24/2024Fire-Resistant Penetrations and JointsJune Daniel-bradshawspecial
10/24/2024Fire-Resistance Rated ConstructionJune Daniel-bradshawprogress
10/15/2024Fire-Resistant Penetrations and JointsJune Daniel-bradshawspecial
10/15/2024Fire-Resistance Rated ConstructionJune Daniel-bradshawprogress
04/10/2024Fire-Resistant Penetrations and JointsJune Daniel-bradshawspecial
04/10/2024Fire-Resistance Rated ConstructionJune Daniel-bradshawprogress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q00817962-S2Request digital key ↗
08/22/2026Q00817962-P1Request digital key ↗
08/22/2026Q00817962-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/13/2021440677073Open ↗
▸BISWORK PERMIT APPLICATION1
08/02/2021440677073Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/22/2026Q00817962-S2Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026Q00817962-P1Open ↗
08/22/2026Q00817962-I1Open ↗
08/22/2026Q00817962-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q00817962-I1Open ↗
08/31/2026Q00817962-P2Open ↗
08/31/2026Q00817962-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q00817962-I1Open ↗
08/31/2026Q00817962-P2Open ↗
08/31/2026Q00817962-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/13/2021440677073Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/09/2021440677073Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/13/2021440677073Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
07/09/2021440677073Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026Q00817962-P1Open ↗
08/22/2026Q00817962-P2Open ↗
08/22/2026Q00817962-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/09/2021440677073Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/08/2022440677073Open ↗
08/01/2022440677073Open ↗
07/28/2022440677073Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/13/2021440677073Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/08/2022440677073Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/01/2022440677073Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/09/2021440677073Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/28/2022440677073Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/08/2022440677073Open ↗
08/01/2022440677073Open ↗
07/28/2022440677073Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISFINAL ELECTRICAL SIGNOFF1
08/01/2022440677073Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/29/2022440677073Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/10/2022440677073Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/09/2021440677073Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/28/2022440677073Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/09/2021440677073Open ↗