Two family frame
19-25 NEW HAVEN AVENUE
QUEENS · BIN 4298307
💬 Discuss this project
2003Year Built
2Stories
B2Building Class
R5Zoning
2,000 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family frame · Owner of record: 64 MAPLE LLC · 2,046 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof6p · 2 filings · 20 docs
Floor 13p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
536 BEACH REALTY LLC103/22/2026
107 BUILDING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DJM CONSULTING ENGINEERING312/28/2024
INFINITY DESIGN CONSULTANT INC112/24/2024
URBAN ENGINEERING, PC110/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
URBAN ENGINEERING, PC603/21/2026
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TESS CONTRACTING CORPGeneral Contractor204/09/2026
3D CONSTRUCTION, INCGeneral Contractor107/08/2026
METRO MECHANICAL GROUP INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495210/02/2024
URBAN ENGINEERING, PC2575310/02/2024
Building Lifecycle
All (33)Filed (5)Permit Issued (4)Signed Off (1)Violation (5)Inspection (3)Special Inspection (15)
12/10/2025
Violation issued (ECB, open)
Construction
10/17/2025
Signed off — Alteration
Renovation of the existing store to use it as a pharmacy as per plan. No change to use, egress or occupancy under this application.
Q01154877-I1
03/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/19/2025
Permit issued — Mechanical Systems
Q01090163-S1-MS
02/14/2025
Permit issued — Structural
Q01090163-I1-ST
01/03/2025
Permit issued — General Construction
Q01154877-I1-GC
12/28/2024
Filed — Alteration
Q01150573-I1
12/24/2024
Filed — Alteration
Renovation of the existing store to use it as a pharmacy as per plan. No change to use, egress or occupancy under this application.
Q01154877-I1
12/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/21/2024
Permit issued — Plumbing
Q01090163-S2-PL
10/02/2024
Filed — Alteration
STEEL DUNNAGE FRAMING STRUCTURAL WORK FOR SUPPORT OF ROOFTOP HVAC UNIT.
Q01090163-S2
10/02/2024
Filed — Alteration
STEEL DUNNAGE FRAMING STRUCTURAL WORK FOR SUPPORT OF ROOFTOP HVAC UNIT.
Q01090163-S1
10/02/2024
Filed — Alteration
STEEL DUNNAGE FRAMING STRUCTURAL WORK FOR SUPPORT OF ROOFTOP HVAC UNIT.
Q01090163-I1
10/02/2024
Special inspection requirement — Structural Cold-Formed Steel
Nizar Khoury
08/05/2024
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Mechanical Systems
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nizar Khoury
08/05/2024
Special inspection requirement — Heating Systems
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Final
Nizar Khoury
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Shutoff dampers
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
08/05/2024
Special inspection requirement — Post-installed Anchors
Nizar Khoury
08/01/2024
Special inspection requirement — Structural Steel - Details
Nizar Khoury
08/01/2024
Special inspection requirement — Final
Nizar Khoury
12/01/2008
Violation issued (ECB, closed)
Boilers
03/26/2007
Violation issued (ECB, closed)
Boilers
09/17/2003
Violation issued (ECB, closed)
Construction
07/16/2002
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTESS CONTRACTING CORP02/19/2025
DOB NOWStructuralPermit IssuedTESS CONTRACTING CORP02/14/2025
DOB NOWGeneral ConstructionSigned-off3D CONSTRUCTION, INC01/03/2025
DOB NOWPlumbingSigned-offMETRO MECHANICAL GROUP IN10/21/2024
BISPLISSUEDC.R.U. MECHAN & HEAT INC11/26/2014
BISBLISSUEDC.R.U. MECHAN & HEAT INC11/26/2014
1 project · most recent 10/02/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/02/2024Permit IssuedTESS CONTRACTING CORPHeating and Air Conditioning Systems
Heat / Cool
Tempstar RGV150HE2A0AAA 125 tons · Rooftop Unit ×1
1 project · most recent 10/02/2024
Gas
FiledStatusContractorScope
10/02/2024Signed-offMETRO MECHANICAL GROUP INGas
2 projects · most recent 01/02/2025
General Wiring
FiledStatusContractorScope
01/02/2025CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
05/17/2024CompleteALL PURPOSE ELECTRIC CORP1 meters, 1 new_meters
1 project · most recent 10/02/2024
Steel Wood
FiledStatusContractorScope
10/02/2024Permit IssuedTESS CONTRACTING CORPSteel, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/02/2024Structural Cold-Formed SteelNizar Khouryspecial
08/05/2024Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsRajasekhar Sakhamurispecial
08/05/2024Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
08/05/2024Mechanical SystemsRajasekhar Sakhamurispecial
08/05/2024Fire-Resistant Penetrations and JointsNizar Khouryspecial
08/05/2024Heating SystemsRajasekhar Sakhamurispecial
08/05/2024FinalNizar Khouryprogress
08/05/2024Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
08/05/2024HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
08/05/2024Maintenance informationRajasekhar Sakhamurienergy_progress
08/05/2024Shutoff dampersRajasekhar Sakhamurienergy_progress
08/05/2024HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
08/05/2024Post-installed AnchorsNizar Khouryspecial
08/01/2024Structural Steel - DetailsNizar Khouryspecial
08/01/2024FinalNizar Khouryprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01090163-S1Request digital key ↗
08/21/2026Q01090163-I1Request digital key ↗
08/21/2026Q01090163-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
12/10/2014421059124Open ↗
12/10/2014421059124Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/10/2014421059124Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026Q01090163-S2Open ↗
08/29/2026Q01090163-S1Open ↗
08/29/2026Q01090163-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026Q01090163-S2Open ↗
08/29/2026Q01090163-S2Open ↗
08/29/2026Q01090163-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q01154877-I1Open ↗
08/13/2026Q01090163-S1Open ↗
08/13/2026Q01150573-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/10/2014421059124Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/10/2014421059124Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/10/2014421059124Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
12/04/2015421059124Open ↗
12/01/2015421059124Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/10/2014421059124Open ↗
▸BISBOILER APPROVAL : 900A1
12/01/2015421059124Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/10/2014421059124Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q01090163-I1Open ↗
08/13/2026Q01150573-I1Open ↗
08/13/2026Q01154877-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/10/2014421059124Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/10/2014421059124Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
12/10/2014421059124Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/10/2014421059124Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/10/2014421059124Open ↗