← Back
Two stories - detached, small or mid-size
8-03 DORIAN COURT
QUEENS · BIN 4298412
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2XZoning
2,400 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,550 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Roof1p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 11p · 2 filings · 10 docs
Cellar3p · 3 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/05/2016$910K—Private party → Private party$379/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENGINEERING PROFESSIONAL SERVICE P.104/27/2023
SHMUEL D. FLAUM, ARCHITECT411/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEP DESIGNS203/21/2026
Building Lifecycle
All (59)Filed (5)Objection (24)Special Inspection (30)
04/27/2023
Filed — Alteration
Installation of sprinkler system in conjunction with new building application Q08028424.
Q00832521-I1
04/20/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection resolved — Addressed
11/15/2022
Objection raised — Scope
11/15/2022
Objection resolved — Resolved
11/15/2022
Objection raised — Fire_Protection
11/15/2022
Objection raised — Energy
11/15/2022
Objection raised — Zoning
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Zoning
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Zoning
11/15/2022
Objection resolved — Resolved
11/15/2022
Objection raised — Scope
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Mechanical
11/15/2022
Objection raised — Zoning
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Zoning
11/15/2022
Objection resolved — Addressed
11/10/2022
Objection raised — Scope
11/10/2022
Objection raised — Scope
11/09/2022
Objection raised — Other
11/09/2022
Objection raised — Scope
11/09/2022
Objection raised — Energy
11/03/2022
Filed — Alteration
Q08031185-I1
11/03/2022
Filed — New Building
PROPOSED NEW SINGLE FAMILY DWELLING
Q08028424-I1
11/03/2022
Filed — Alteration
Q08031090-I1
11/03/2022
Filed — Alteration
Q08031142-I1
11/01/2022
Special inspection requirement — Structural Steel - Details
10/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/28/2022
Special inspection requirement — Subgrade Inspections
10/28/2022
Special inspection requirement — Permanent certificate
10/28/2022
Special inspection requirement — Concrete - Cast-In-Place
10/28/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/28/2022
Special inspection requirement — Protection of exposed foundation insulation
10/28/2022
Special inspection requirement — Interior lighting power
10/28/2022
Special inspection requirement — Insulation placement and R values
10/28/2022
Special inspection requirement — Energy Code Compliance Inspections
10/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
10/28/2022
Special inspection requirement — Preliminary
10/28/2022
Special inspection requirement — Structural Wood Frame
10/28/2022
Special inspection requirement — Air barrier — testing
10/28/2022
Special inspection requirement — Air barrier - visual inspection
10/28/2022
Special inspection requirement — Maintenance information
10/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
10/28/2022
Special inspection requirement — Fenestration air leakage
10/28/2022
Special inspection requirement — Metering
10/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
10/28/2022
Special inspection requirement — Duct leakage testing, insulation and design
10/28/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
10/28/2022
Special inspection requirement — Electric vehicle service equipment requirements
10/28/2022
Special inspection requirement — Fenestration areas
10/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
10/26/2022
Special inspection requirement — Mechanical Systems
10/26/2022
Special inspection requirement — Footing and Foundation
10/26/2022
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 11/03/2022
Heating and Air Conditioning Systems
FiledStatusContractorScope
11/03/2022——Heating and Air Conditioning Systems
1 project · most recent 04/27/2023
FiledStatusContractorScope
04/27/2023———
1 project · most recent 04/27/2023
Water/Sanitary
FiledStatusContractorScope
04/27/2023——Water/Sanitary
1 project · most recent 11/03/2022
Steel Wood
FiledStatusContractorScope
11/03/2022——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/20/2023Subsurface Investigations (Borings/Test Pits)—special
04/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/01/2022Structural Steel - Details—special
10/28/2022Fire-Resistant Penetrations and Joints—special
10/28/2022Subgrade Inspections—special
10/28/2022Permanent certificate—energy_progress
10/28/2022Concrete - Cast-In-Place—special
10/28/2022Excavations - Sheeting, Shoring, and Bracing—special
10/28/2022Protection of exposed foundation insulation—energy_progress
10/28/2022Interior lighting power—energy_progress
10/28/2022Insulation placement and R values—energy_progress
10/28/2022Energy Code Compliance Inspections—progress
10/28/2022Fire-Resistance Rated Construction—progress
10/28/2022Preliminary—progress
10/28/2022Structural Wood Frame—progress
10/28/2022Air barrier — testing —energy_progress
10/28/2022Air barrier - visual inspection—energy_progress
10/28/2022Maintenance information—energy_progress
10/28/2022HVAC-R and service water heating system controls—energy_progress
10/28/2022Fenestration air leakage—energy_progress
10/28/2022Metering—energy_progress
10/28/2022HVAC-R and service water piping design and insulation—energy_progress
10/28/2022Duct leakage testing, insulation and design—energy_progress
10/28/2022Fenestration and door U-factor and product ratings—energy_progress
10/28/2022Electric vehicle service equipment requirements—energy_progress
Latest 25 of 30.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08031185-I1Request digital key ↗
08/25/2026Q08031090-I1Request digital key ↗
08/25/2026Q08031142-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q08028424-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08028424-I1Open ↗
08/25/2026Q08031185-I1Open ↗
08/13/2026Q00832521-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q08028424-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q08028424-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026Q08028424-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q08028424-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q08028424-I1Open ↗