← Back
Two stories - detached, small or mid-size
6-20 READS LANE
QUEENS · BIN 4298569
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2XZoning
3,375 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,077 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof2p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 6 docs
Cellar2p · 2 filings · 20 docs
1 job · most recent 09/30/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/30/2021Signed-offROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
Building Lifecycle
All (60)Filed (7)Permit Issued (9)Signed Off (1)Violation (4)Inspection (7)Objection (2)Special Inspection (30)
09/18/2024
Signed off — Alteration
Q00533658-I1
07/24/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/10/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/22/2023
Special inspection requirement — Concrete - Cast-In-Place
Shmuel Flaum
08/22/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
08/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Shmuel Flaum
08/22/2023
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
08/22/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shmuel Flaum
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shmuel Flaum
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Shmuel Flaum
08/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shmuel Flaum
08/22/2023
Special inspection requirement — Preliminary
Shmuel Flaum
08/22/2023
Special inspection requirement — Footing and Foundation
Shmuel Flaum
08/22/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
08/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Shmuel Flaum
08/22/2023
Special inspection requirement — Insulation placement and R values
Shmuel Flaum
08/22/2023
Special inspection requirement — Air barrier — testing
Shmuel Flaum
08/22/2023
Special inspection requirement — Protection of exposed foundation insulation
Shmuel Flaum
08/22/2023
Special inspection requirement — Fenestration areas
Shmuel Flaum
08/22/2023
Special inspection requirement — Electric vehicle service equipment requirements
Shmuel Flaum
08/22/2023
Special inspection requirement — Air barrier - visual inspection
Shmuel Flaum
08/22/2023
Special inspection requirement — Fenestration air leakage
Shmuel Flaum
06/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2023
Permit issued — Plumbing
Q00593645-I1-PL
04/20/2023
Filed — Alteration
Q00533658-P1
04/20/2023
Special inspection requirement — Footing and Foundation
Shmuel Flaum
04/20/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shmuel Flaum
04/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Shmuel Flaum
04/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shmuel Flaum
04/20/2023
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
04/20/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Shmuel Flaum
04/20/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
04/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shmuel Flaum
01/17/2023
Permit issued — Construction Fence
Q00610812-I1-FN
12/30/2022
Permit issued — Foundation
Q00533658-I1-GC-CX
11/17/2022
Permit issued — Foundation
Q00533658-I1-GC-CX
08/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/29/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2022
Violation issued (ECB, closed)
Construction
06/22/2022
Permit issued — Plumbing
Q00593645-I1-PL
05/20/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2022
Permit issued — Foundation
Q00533658-I1-GC-CX
03/18/2022
Violation issued (ECB, closed)
Construction
03/18/2022
Violation issued (ECB, closed)
Unknown
02/14/2022
Permit issued — General Construction
Q00533658-I1-GC-CX
02/02/2022
Permit issued — Curb Cut
Q00562732-I1-CC
01/03/2022
Permit issued — Construction Fence
Q00610812-I1-FN
12/16/2021
Filed — Alteration
New curb cut.
Q00562732-P2
12/07/2021
Filed — Alteration
New curb cut.
Q00562732-P1
10/19/2021
Filed — Alteration
Q00610812-I1
10/02/2021
Objection raised — Scope
10/02/2021
Objection resolved — Addressed
09/30/2021
Filed — Alteration
New curb cut.
Q00562732-I1
09/30/2021
Filed — Alteration
NEW PLUMBING FIXTURES IN CONJUNCTION WITH ALT FILING Q00533658
Q00593645-I1
06/09/2021
Filed — Alteration
Q00533658-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ISLAND INTERIORS DESIGN203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHMUEL D. FLAUM, ARCHITECT704/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND INTERIORS DESIGNGeneral Contractor1207/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHMUEL D. FLAUM, ARCHITEC4278304/20/2023
TRIANGLE INSPECTION & TES7495204/20/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC06/27/2023
DOB NOWConstruction FencePermit IssuedISLAND INTERIORS DESIGN01/17/2023
DOB NOWFoundationSigned-offISLAND INTERIORS DESIGN12/30/2022
DOB NOWFoundationSigned-offISLAND INTERIORS DESIGN11/17/2022
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC06/22/2022
DOB NOWFoundationSigned-offISLAND INTERIORS DESIGN04/06/2022
DOB NOWGeneral ConstructionSigned-offISLAND INTERIORS DESIGN02/14/2022
DOB NOWCurb CutPermit IssuedISLAND INTERIORS DESIGN02/02/2022
DOB NOWConstruction FencePermit IssuedISLAND INTERIORS DESIGN01/03/2022
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/24/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/22/2023Concrete - Cast-In-PlaceShmuel Flaumspecial
08/22/2023Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
08/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShmuel Flaumspecial
08/22/2023Subgrade InspectionsRajasekhar Sakhamurispecial
08/22/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/22/2023Structural Stability – Alterations of existing buildingsShmuel Flaumspecial
08/22/2023Fire-Resistant Penetrations and JointsShmuel Flaumspecial
08/22/2023Energy Code Compliance InspectionsShmuel Flaumprogress
08/22/2023Fire-Resistance Rated ConstructionShmuel Flaumprogress
08/22/2023PreliminaryShmuel Flaumprogress
08/22/2023Footing and FoundationShmuel Flaumprogress
08/22/2023FinalRajasekhar Sakhamuriprogress
08/22/2023Fenestration and door U-factor and product ratingsShmuel Flaumenergy_progress
08/22/2023Insulation placement and R valuesShmuel Flaumenergy_progress
08/22/2023Air barrier — testing Shmuel Flaumenergy_progress
08/22/2023Protection of exposed foundation insulationShmuel Flaumenergy_progress
08/22/2023Fenestration areasShmuel Flaumenergy_progress
08/22/2023Electric vehicle service equipment requirementsShmuel Flaumenergy_progress
08/22/2023Air barrier - visual inspectionShmuel Flaumenergy_progress
08/22/2023Fenestration air leakageShmuel Flaumenergy_progress
04/20/2023Footing and FoundationShmuel Flaumprogress
04/20/2023Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
04/20/2023Fire-Resistant Penetrations and JointsShmuel Flaumspecial
04/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShmuel Flaumspecial
04/20/2023Structural Stability – Alterations of existing buildingsShmuel Flaumspecial
Latest 25 of 46.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00533658-P1Request digital key ↗
08/27/2026Q00533658-I1Request digital key ↗
08/27/2026Q00610812-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
03/29/2022421805746Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026Q00533658-I1Open ↗
09/01/2026Q00533658-I1Open ↗
09/01/2026Q00533658-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00533658-I1Open ↗
09/01/2026Q00533658-I1Open ↗
09/01/2026Q00533658-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00533658-I1Open ↗
08/27/2026Q00593645-I1Open ↗
08/27/2026Q00610812-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00533658-I1Open ↗
08/15/2026Q00593645-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00533658-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00533658-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00533658-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
03/29/2022421805746Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
03/29/2022421805746Open ↗
▸BISEFILING COVER SHEET1
03/29/2022421805746Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸DOB NOWPlot Diagram2
08/27/2026Q00533658-I1Open ↗
08/13/2026Q00533658-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00533658-I1Open ↗