← Back
Over six families without stores
145 BEACH 59 STREET
QUEENS · BIN 4302057
💬 Discuss this project
1955Year Built
2Stories
C1Building Class
R6Zoning
11,000 sfGross Floor Area
13Units
Rent Stabilized31 Open Violations 29 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: H20 HOLDING, · 8,175 sf lot · 1.35 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H2O HOLDING LLC1107/08/2026
H20 HOLDING1003/22/2026
TO OWNR OR 149 BEAN 59 ST103/22/2026
OCEANVIEW APTE CORP C O FAR RO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING ENGINEERING SYSTEMS PLLC311/09/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETERKIN CONSTRUCTION LLCGeneral Contractor303/21/2026
ALMAX ELECTRIC, INC.Electrical103/22/2026
TRIANGLE ELECTRIC INC.Electrical103/22/2026
WALTON PLUMBING & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC4288311/09/2024
Building Lifecycle
All (85)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)Special Inspection (15)
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
B
04/09/2026
Violation issued (HPD, closed)
C
02/17/2026
Violation issued (HPD, closed)
C
02/17/2026
Violation issued (HPD, open)
C
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, open)
C
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/2025
Violation issued (ECB, open)
Boilers
01/08/2025
Signed off — Alteration
APPLICATION BEING FILE TO RELAMINATE ALL WALLS, TO REPLACE ALL PLUMBING AND GAS FIXTURES ON EXISTING ROUGHIN AND TO REPLACE ALL WINDOWS ON EXISTING OPENING AT APARTMENT #6 AT 1ST FLOOR.
Q01030740-I1
01/08/2025
Signed off — Alteration
APPLICATION BEING FILED TO REPLACE ALL FIXTURES ON EXISTING ROUGH IN AT APARTMENT #6
Q01030753-I1
11/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
SEBERT DYER
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
11/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
11/09/2024
Filed — Alteration
APPLICATION BEING FILED TO REPLACE ALL FIXTURES ON EXISTING ROUGH IN AT APARTMENT #6
Q01030753-P1
10/07/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2024
Permit issued — Plumbing
Q01030753-I1-PL
07/05/2024
Permit issued — General Construction
Q01030740-I1-GC
06/24/2024
Violation issued (HPD, closed)
A
06/02/2024
Violation issued (HPD, closed)
A
06/02/2024
Violation issued (HPD, closed)
C
05/30/2024
Violation issued (HPD, closed)
C
05/30/2024
Violation issued (HPD, closed)
C
05/30/2024
Violation issued (HPD, closed)
C
05/06/2024
Filed — Alteration
APPLICATION BEING FILE TO RELAMINATE ALL WALLS, TO REPLACE ALL PLUMBING AND GAS FIXTURES ON EXISTING ROUGHIN AND TO REPLACE ALL WINDOWS ON EXISTING OPENING AT APARTMENT #6 AT 1ST FLOOR.
Q01030740-I1
05/06/2024
Filed — Alteration
APPLICATION BEING FILED TO REPLACE ALL FIXTURES ON EXISTING ROUGH IN AT APARTMENT #6
Q01030753-I1
05/06/2024
Special inspection requirement — Insulation placement and R values
SEBERT DYER
05/06/2024
Special inspection requirement — Interior lighting power
SEBERT DYER
05/06/2024
Special inspection requirement — Fenestration areas
SEBERT DYER
05/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBERT DYER
05/06/2024
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
05/06/2024
Special inspection requirement — Fenestration air leakage
SEBERT DYER
05/06/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SEBERT DYER
04/16/2024
Violation issued (HPD, closed)
A
04/04/2024
Special inspection requirement — Final
SEBERT DYER
04/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
02/09/2024
Violation issued (HPD, closed)
I
01/31/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
A
01/06/2024
Violation issued (HPD, closed)
A
01/06/2024
Violation issued (HPD, closed)
A
01/06/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWALTON PLUMBING & HTG LLC09/16/2024
DOB NOWGeneral ConstructionSigned-offPETERKIN CONSTRUCTION LLC07/05/2024
BISOTISSUEDEMPIREHD, INC04/29/2019
BISPLISSUEDC JAMES PLBG & HTG INC12/10/2018
BISOTISSUEDEMPIREHD, INC05/02/2018
BISEQISSUEDEMPIREHD, INC05/02/2018
BISPLISSUEDC JAMES PLBG & HTG INC09/19/2017
BISEQISSUEDEMPIREHD, INC08/30/2017
BISOTISSUEDEMPIREHD, INC08/25/2017
BISBLISSUEDBAYSIDE FUEL01/26/2004
4 projects · most recent 04/13/2026
General Wiring
FiledStatusContractorScope
04/13/2026Permit IssuedTRINCITY ELECTRIC, INC12 meters, 1 new_meters
12/05/2024Permit IssuedTRINCITY ELECTRIC, INC1 meters, 1 new_meters
05/06/2024CompleteALMAX ELECTRIC, INC.General Wiring
08/29/2019CompleteTRIANGLE ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
11/21/2024Tenant Protection Plan ComplianceSEBERT DYERspecial
11/21/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
11/21/2024HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
11/21/2024Energy Code Compliance InspectionsSEBERT DYERprogress
05/06/2024Insulation placement and R valuesSEBERT DYERenergy_progress
05/06/2024Interior lighting powerSEBERT DYERenergy_progress
05/06/2024Fenestration areasSEBERT DYERenergy_progress
05/06/2024Fenestration and door U-factor and product ratingsSEBERT DYERenergy_progress
05/06/2024Air barrier - visual inspectionSEBERT DYERenergy_progress
05/06/2024Fenestration air leakageSEBERT DYERenergy_progress
05/06/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SEBERT DYERspecial
04/04/2024FinalSEBERT DYERprogress
04/04/2024Fire-Resistance Rated ConstructionSEBERT DYERprogress
04/04/2024Energy Code Compliance InspectionsSEBERT DYERprogress
04/04/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026Q01030740-I1Request digital key ↗
08/22/2026Q01030753-I1Request digital key ↗
08/22/2026Q01030753-P1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION10
07/10/2019440556435Open ↗
05/07/2019440378217Open ↗
05/07/2019440378217Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
07/10/2019440556435Open ↗
05/24/2019440378217Open ↗
12/01/2017440378217Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature11
08/27/2026Q01030740-I1Open ↗
08/27/2026Q01030740-I1Open ↗
08/27/2026Q01030740-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q01030740-I1Open ↗
08/27/2026Q01030740-I1Open ↗
08/26/2026Q01030753-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026Q01030753-I1Open ↗
08/22/2026Q01030753-P1Open ↗
08/13/2026Q01030740-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/10/2019440556435Open ↗
03/08/2017440389740Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/10/2019440556435Open ↗
03/08/2017440389740Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/10/2019440556435Open ↗
03/08/2017440389740Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/18/2017440378217Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/30/2019440556435Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING7
05/31/2019440378217Open ↗
05/24/2019440378217Open ↗
12/01/2017440378217Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
03/07/2017440378217Open ↗
07/10/2019440556435Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026Q01030753-I1Open ↗
08/22/2026Q01030753-P1Open ↗
08/13/2026Q01030740-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/10/2019440556435Open ↗
01/18/2017440378217Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/28/2020440378217Open ↗
08/28/2020440389740Open ↗
07/10/2019440556435Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/28/2020440378217Open ↗
08/28/2020440389740Open ↗
09/30/2019440556435Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/10/2019440556435Open ↗
03/08/2017440389740Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/30/2019440556435Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/28/2020440378217Open ↗
08/28/2020440389740Open ↗
07/10/2019440556435Open ↗
Showing 3 of 6 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
10/19/2020440378217Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/19/2020440378217Open ↗
08/28/2020440389740Open ↗
10/08/2019440556435Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/08/2019440556435Open ↗
03/21/2017440378217Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/30/2019440556435Open ↗
07/10/2019440556435Open ↗
03/08/2017440389740Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
01/15/2020440378217Open ↗
07/30/2019440378217Open ↗
12/01/2017440378217Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/10/2019440556435Open ↗
03/08/2017440389740Open ↗
01/18/2017440378217Open ↗
▸Other Documents1
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
03/07/2017440378217Open ↗