← Back
Miscellaneous warehouse
350 BEACH 79 STREET
QUEENS · BIN 4303330
💬 Discuss this project
1956Year Built
2Stories
E9Building Class
M1-2Zoning
34,740 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Miscellaneous warehouse · Owner of record: ROCKAWAY REAL EQUITY LLC · 49,075 sf lot · 0.71 FAR built · Flood zone AE
Locations of Work
PlumbingFire Protection
Floor 13p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKAWAY REAL EQUITY LLC103/22/2026
ABINGDON CAPITAL103/22/2026
79 ARVERNE DEVELOPMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIZARDOS ENGINEERING504/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLM ELECTRIC LLCElectrical103/22/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
ABINGDON CAPITAL LLCGeneral Contractor104/09/2026
ABSOLUTE PLBG HTG & MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864404/09/2025
Building Lifecycle
All (21)Filed (4)Permit Issued (3)Violation (5)Inspection (5)Special Inspection (4)
07/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
04/10/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
04/09/2025
Filed — Alteration
SPRINKLER FILING FOR NEW FIRE PROTECTION PIPING FROM THE NEW WATER SERVICE ALONG SOUTH WALL TO THE EXISTING FIRE WATER DISTRIBUTION PIPING TO REMAIN. EXISTING FDC ON EAST WALL TO BE RELOCATED TO SOUTH WALL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01106255-P1
04/09/2025
Filed — Alteration
PLUMBING WORK CONSISTING OF RECONNECTING TO EXISTING WATER ALONG FRONT WALL DUE TO NEW WATER SERVICES. NO CHANGE TO USE OR OCCUPANCY. NO EXTERIOR WORK.
Q01106191-P1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
04/08/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
11/18/2024
Permit issued — Plumbing
Q01106191-I1-PL
11/15/2024
Permit issued — Sprinklers
Q01106255-I1-EW-SP
09/26/2024
Filed — Alteration
PLUMBING WORK CONSISTING OF RECONNECTING TO EXISTING WATER ALONG FRONT WALL DUE TO NEW WATER SERVICES. NO CHANGE TO USE OR OCCUPANCY. NO EXTERIOR WORK.
Q01106191-I1
09/26/2024
Filed — Alteration
SPRINKLER FILING FOR NEW FIRE PROTECTION PIPING FROM THE NEW WATER SERVICE ALONG SOUTH WALL TO THE EXISTING FIRE WATER DISTRIBUTION PIPING TO REMAIN. EXISTING FDC ON EAST WALL TO BE RELOCATED TO SOUTH WALL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01106255-I1
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2020
Permit issued — Construction Fence
Q00353707-I1-FN
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offABSOLUTE PLBG HTG & MECH11/18/2024
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC11/15/2024
DOB NOWConstruction FenceSigned-offABINGDON CAPITAL LLC06/30/2020
BIS—ISSUED79 ARVERNE DEVELOPMENT LLC12/10/2021
1 job · most recent 04/09/2025
FiledStatusContractorScope
04/09/2025Signed-offARCO PLBG AND HTG INC1 heads
1 job · most recent 04/09/2025
Water/Sanitary
FiledStatusContractorScope
04/09/2025Signed-offABSOLUTE PLBG HTG & MECHWater/Sanitary
1 job · most recent 03/16/2023
FiledStatusContractorScope
03/16/2023CompletePLM ELECTRIC LLC1 meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/10/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
04/10/2025Post-installed AnchorsJUAN GOMEZspecial
04/08/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
04/08/2025Post-installed AnchorsJUAN GOMEZspecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026Q01106255-I1Request digital key ↗
08/20/2026Q01106255-P1Request digital key ↗
08/20/2026Q01106191-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
06/14/2022421790271Open ↗
06/08/2022421790271Open ↗
03/10/2022421790271Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/10/2021421790271Open ↗
▸BISWORK PERMIT APPLICATION1
12/10/2021421790271Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/05/2022421790271Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
05/08/2023421790271Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/18/2023421790271Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q01106191-P1Open ↗
08/13/2026Q01106255-I1Open ↗
08/13/2026Q01106255-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01106191-I1Open ↗
08/22/2026Q01106191-P1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/10/2021421790271Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q01106191-I1Open ↗
08/13/2026Q01106191-P1Open ↗
08/13/2026Q01106255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed1
08/13/2026Q01106191-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/10/2021421790271Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/08/2021421790271Open ↗
11/08/2021421790271Open ↗
11/08/2021421790271Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
06/14/2022421790271Open ↗
06/08/2022421790271Open ↗
07/10/2021421790271Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
05/08/2023421790271Open ↗
07/10/2021421790271Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/13/2023421790271Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION4
11/09/2022421790271Open ↗
06/24/2022421790271Open ↗
11/16/2021421790271Open ↗
Showing 3 of 4 on file for this type