| Owner | Filings | Most Recent |
|---|---|---|
| NACCARATO CONTRACTING | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CONSULTING ENGINEER | 1 | 04/18/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/18/2024 | — | — | Air Conditioning Systems, Heating Systems | Cooling Mitsubishi Electric PUMY-HP48NKMU2 48,000 BTU · Vrf Outdoor ×5 PUY-A12NKA7 12,000 BTU · Condensing Unit ×1 PUZ-HA24NHA 24,000 BTU · Condensing Unit ×1 Heating Mitsubishi Electric PUMY-HP48NKMU2 54,000 BTU · Vrf Outdoor ×5 PUY-A12NKA7 12,000 BTU · Condensing Unit ×1 PUZ-HA24NHA 26,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/18/2024 | — | — | Steel, Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/15/2023 | Lowest Floor Elevation | — | progress |
| 06/07/2021 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/07/2021 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 06/07/2021 | Fire-Resistant Penetrations and Joints | — | special |
| 06/07/2021 | Heating Systems | — | special |
| 06/07/2021 | Masonry | — | special |
| 06/07/2021 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 06/07/2021 | Structural Stability – Alterations of existing buildings | — | special |
| 06/07/2021 | Structural Steel - High Strength Bolting | — | special |
| 06/07/2021 | Structural Steel - Welding | — | special |
| 06/07/2021 | Subgrade Inspections | — | special |
| 06/07/2021 | Fenestration air leakage | — | energy_progress |
| 06/07/2021 | Protection of exposed foundation insulation | — | energy_progress |
| 06/07/2021 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 06/07/2021 | Lighting controls | — | energy_progress |
| 06/07/2021 | Exterior lighting power | — | energy_progress |
| 06/07/2021 | Concrete - Cast-In-Place | — | special |
| 06/07/2021 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 06/07/2021 | Energy Code Compliance Inspections | — | progress |
| 06/07/2021 | Fire-Resistance Rated Construction | — | progress |
| 06/07/2021 | Fenestration areas | — | energy_progress |
| 06/07/2021 | Maintenance information | — | energy_progress |
| 06/07/2021 | Insulation placement and R values | — | energy_progress |
| 06/07/2021 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/07/2021 | HVAC-R and service water heating system controls | — | energy_progress |