← Back
Other miscellaneous
111-02 ROCKAWAY BEACH BLVD
QUEENS · BIN 4303747
💬 Discuss this project
0Year Built
1Stories
Z9Building Class
R5BZoning
324 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Other miscellaneous · Owner of record: SOL FORTE LLC · 4,880 sf lot · 0.07 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Roof7p · 1 filing · 6 docs
Bulkhead2p · 1 filing · 6 docs
Floor 44p · 1 filing · 6 docs
Floor 33p · 1 filing · 6 docs
Floor 25p · 1 filing · 6 docs
Floor 13p · 1 filing · 6 docs
Basement2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NACCARATO CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSULTING ENGINEER104/18/2024
Building Lifecycle
All (49)Filed (1)Violation (4)Objection (14)Special Inspection (30)
06/19/2025
Objection resolved — Resolved
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
05/04/2024
Objection raised — Zoning
05/04/2024
Objection raised — Zoning
05/04/2024
Objection raised — Zoning
05/04/2024
Objection raised — Structural
05/04/2024
Objection raised — Admin
05/03/2024
Objection raised — Structural
05/03/2024
Objection raised — Zoning
05/03/2024
Objection raised — Structural
05/02/2024
Objection raised — Zoning
05/02/2024
Objection raised — Zoning
04/18/2024
Filed — New Building
General construction, Structural, and mechanical work to erect 4 story new building.
Q00529357-I1
03/15/2023
Special inspection requirement — Lowest Floor Elevation
06/07/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/07/2021
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/07/2021
Special inspection requirement — Heating Systems
06/07/2021
Special inspection requirement — Masonry
06/07/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/07/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/07/2021
Special inspection requirement — Structural Steel - High Strength Bolting
06/07/2021
Special inspection requirement — Structural Steel - Welding
06/07/2021
Special inspection requirement — Subgrade Inspections
06/07/2021
Special inspection requirement — Fenestration air leakage
06/07/2021
Special inspection requirement — Protection of exposed foundation insulation
06/07/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
06/07/2021
Special inspection requirement — Lighting controls
06/07/2021
Special inspection requirement — Exterior lighting power
06/07/2021
Special inspection requirement — Concrete - Cast-In-Place
06/07/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/07/2021
Special inspection requirement — Energy Code Compliance Inspections
06/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
06/07/2021
Special inspection requirement — Fenestration areas
06/07/2021
Special inspection requirement — Maintenance information
06/07/2021
Special inspection requirement — Insulation placement and R values
06/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
06/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
06/07/2021
Special inspection requirement — Air barrier - visual inspection
06/07/2021
Special inspection requirement — Metering
06/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
06/07/2021
Special inspection requirement — Interior lighting power
06/07/2021
Special inspection requirement — Lighting in dwelling units
03/26/2008
Violation issued (ECB, closed)
Construction
04/24/1991
Violation issued (ECB, closed)
Construction
04/24/1991
Violation issued (ECB, closed)
Construction
02/07/1991
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 04/18/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/18/2024——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PUMY-HP48NKMU2 48,000 BTU · Vrf Outdoor ×5
PUY-A12NKA7 12,000 BTU · Condensing Unit ×1
PUZ-HA24NHA 24,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric PUMY-HP48NKMU2 54,000 BTU · Vrf Outdoor ×5
PUY-A12NKA7 12,000 BTU · Condensing Unit ×1
PUZ-HA24NHA 26,000 BTU · Condensing Unit ×1
1 project · most recent 04/18/2024
Steel Concrete
FiledStatusContractorScope
04/18/2024——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
03/15/2023Lowest Floor Elevation—progress
06/07/2021Excavations - Sheeting, Shoring, and Bracing—special
06/07/2021Exterior Insulation and Finish Systems (EIFS)—special
06/07/2021Fire-Resistant Penetrations and Joints—special
06/07/2021Heating Systems—special
06/07/2021Masonry—special
06/07/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/07/2021Structural Stability – Alterations of existing buildings—special
06/07/2021Structural Steel - High Strength Bolting—special
06/07/2021Structural Steel - Welding—special
06/07/2021Subgrade Inspections—special
06/07/2021Fenestration air leakage—energy_progress
06/07/2021Protection of exposed foundation insulation—energy_progress
06/07/2021Fenestration and door U-factor and product ratings—energy_progress
06/07/2021Lighting controls—energy_progress
06/07/2021Exterior lighting power—energy_progress
06/07/2021Concrete - Cast-In-Place—special
06/07/2021Subsurface Investigations (Borings/Test Pits)—special
06/07/2021Energy Code Compliance Inspections—progress
06/07/2021Fire-Resistance Rated Construction—progress
06/07/2021Fenestration areas—energy_progress
06/07/2021Maintenance information—energy_progress
06/07/2021Insulation placement and R values—energy_progress
06/07/2021HVAC-R and service water heating equipment—energy_progress
06/07/2021HVAC-R and service water heating system controls—energy_progress
Latest 25 of 36.
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q00529357-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00529357-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00529357-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q00529357-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00529357-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/22/2026Q00529357-I1Open ↗