← Back
Two stories - detached, small or mid-size
251 BEACH 140 STREET
QUEENS · BIN 4306112
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2Zoning
2,250 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,000 sf lot · 0.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
1 job · most recent 09/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/15/2025Permit IssuedPLUMBING PLBG & PLBG CORPGas, Water/Sanitary
1 job · most recent 06/28/2025
General Wiring
FiledStatusContractorScope
06/28/2025Permit IssuedE D ELECTRICAL INCGeneral Wiring
1 job · most recent 09/15/2025
FiledStatusContractorScope
09/15/2025Permit IssuedJ&J DESIGNS INC3 scope_items
Building Lifecycle
All (74)Filed (4)Permit Issued (3)Violation (1)Inspection (5)Objection (42)Special Inspection (19)
04/10/2026
Permit issued — General Construction
Q01068567-I1-GC-CX
12/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2025
Objection resolved — Addressed
10/07/2025
Objection raised — Scope
09/15/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for horizontal and vertical enlargement & renovation of a single-family dwelling. all work as per plans filed herewith.
Q01068567-P2
09/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
09/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
09/10/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Paul Raymond
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
09/10/2025
Special inspection requirement — Final
Paul Raymond
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
09/10/2025
Special inspection requirement — Footing and Foundation
Paul Raymond
09/10/2025
Special inspection requirement — Lowest Floor Elevation
Paul Raymond
09/10/2025
Special inspection requirement — Permanent certificate
Paul Raymond
09/10/2025
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
09/10/2025
Special inspection requirement — Fenestration areas
Paul Raymond
09/10/2025
Special inspection requirement — Fenestration air leakage
Paul Raymond
09/10/2025
Special inspection requirement — Electric vehicle service equipment requirements
Paul Raymond
09/10/2025
Special inspection requirement — Air barrier — testing
Paul Raymond
09/10/2025
Special inspection requirement — Insulation placement and R values
Paul Raymond
09/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
09/10/2025
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
09/10/2025
Special inspection requirement — Interior lighting power
Paul Raymond
08/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for horizontal and vertical enlargement & renovation of a single-family dwelling. all work as per plans filed herewith.
Q01068567-P1
05/13/2025
Permit issued — Plumbing
Q01068567-S1-PL
05/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/11/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
12/24/2024
Permit issued — Foundation
Q01068567-I1-GC-CX
12/13/2024
Objection raised — Other
11/29/2024
Objection raised — Other
11/18/2024
Objection resolved — Addressed
11/15/2024
Objection raised — Other
11/04/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
10/28/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
09/19/2024
Objection raised — Other
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Other
08/14/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/09/2024
Objection raised — Scope
07/09/2024
Objection raised — Inspections
07/09/2024
Objection raised — Scope
07/08/2024
Objection raised — Fire_Protection
07/08/2024
Objection raised — Structural
Latest 60 of 74 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ESSENAR GROUP COMPANY804/12/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/22/2024$1.2M—MGM PROPERTY 251 LLC → Private party$523/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VALENTINO POMPEO ARCHITECT, P.C.409/15/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor204/12/2026
PLUMBING PLBG & PLBG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394409/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC04/10/2026
DOB NOWPlumbingPermit IssuedPLUMBING PLBG & PLBG CORP05/13/2025
DOB NOWFoundationPermit IssuedJ&J DESIGNS INC12/24/2024
BISOTISSUEDNA02/03/1999
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/10/2025Concrete - Cast-In-PlacePaul Raymondspecial
09/10/2025Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
09/10/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
09/10/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Paul Raymondspecial
09/10/2025Energy Code Compliance InspectionsPaul Raymondprogress
09/10/2025FinalPaul Raymondprogress
09/10/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
09/10/2025Footing and FoundationPaul Raymondprogress
09/10/2025Lowest Floor ElevationPaul Raymondprogress
09/10/2025Permanent certificatePaul Raymondenergy_progress
09/10/2025Air barrier - visual inspectionPaul Raymondenergy_progress
09/10/2025Fenestration areasPaul Raymondenergy_progress
09/10/2025Fenestration air leakagePaul Raymondenergy_progress
09/10/2025Electric vehicle service equipment requirementsPaul Raymondenergy_progress
09/10/2025Air barrier — testing Paul Raymondenergy_progress
09/10/2025Insulation placement and R valuesPaul Raymondenergy_progress
09/10/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
09/10/2025Protection of exposed foundation insulationPaul Raymondenergy_progress
09/10/2025Interior lighting powerPaul Raymondenergy_progress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q01068567-P2Request digital key ↗
08/22/2026Q01068567-P1Request digital key ↗
08/22/2026Q01068567-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature15
08/23/2026Q01068567-P2Open ↗
08/23/2026Q01068567-P2Open ↗
08/23/2026Q01068567-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026Q01068567-S1Open ↗
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026Q01068567-P2Open ↗
08/23/2026Q01068567-P2Open ↗
08/23/2026Q01068567-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01068567-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026Q01068567-S1Open ↗
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01068567-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026Q01068567-I1Open ↗
08/13/2026Q01068567-P2Open ↗