← Back
Two stories - detached, small or mid-size
151 BEACH 136 STREET
QUEENS · BIN 4306326
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2Zoning
1,791 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
1 job · most recent 01/26/2024
General Wiring
FiledStatusContractorScope
01/26/2024CompletePAPPAS & FODERA ELECT'LGeneral Wiring
Building Lifecycle
All (32)Filed (5)Permit Issued (3)Signed Off (2)Inspection (4)Special Inspection (18)
12/02/2024
Signed off — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-I1
11/27/2024
Permit issued — General Construction
Q00993713-I1-ST
11/25/2024
Signed off — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-S1
08/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Nazzareno Callipo
08/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nazzareno Callipo
08/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nazzareno Callipo
08/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nazzareno Callipo
08/26/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-P3
08/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Nazzareno Callipo
07/17/2024
Special inspection requirement — Fenestration areas
Nazzareno Callipo
07/17/2024
Special inspection requirement — Lighting in dwelling units
Nazzareno Callipo
07/17/2024
Special inspection requirement — Fenestration air leakage
Nazzareno Callipo
07/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nazzareno Callipo
07/17/2024
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
07/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
07/17/2024
Special inspection requirement — Final
Nazzareno Callipo
07/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
07/17/2024
Special inspection requirement — Structural Wood Frame
Nazzareno Callipo
07/16/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-P2
07/16/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-P1
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Nazzareno Callipo
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nazzareno Callipo
07/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nazzareno Callipo
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nazzareno Callipo
04/10/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2024
Permit issued — Plumbing
Q00993713-S1-PL
01/29/2024
Permit issued — General Construction
Q00993713-I1-GC
01/25/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-I1
01/25/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of existing one family residence. no change in use, egress nor occupancy.
Q00993713-S1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2022$1.1M—— → —$614/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAZZARENO CALLIPO P.E.508/26/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKFISH CUSTOM BUILDERSGeneral Contractor207/08/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GZ & NC CODE CONSULTING P7492207/16/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROCKFISH CUSTOM BUILDERS11/27/2024
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC01/31/2024
DOB NOWGeneral ConstructionSigned-offROCKFISH CUSTOM BUILDERS01/29/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/27/2024Energy Code Compliance InspectionsNazzareno Callipoprogress
08/27/2024HVAC-R and service water piping design and insulationNazzareno Callipoenergy_progress
08/27/2024HVAC-R and service water heating system controlsNazzareno Callipoenergy_progress
08/27/2024HVAC-R and service water heating equipmentNazzareno Callipoenergy_progress
07/17/2024Energy Code Compliance InspectionsNazzareno Callipoprogress
07/17/2024Fenestration areasNazzareno Callipoenergy_progress
07/17/2024Lighting in dwelling unitsNazzareno Callipoenergy_progress
07/17/2024Fenestration air leakageNazzareno Callipoenergy_progress
07/17/2024Fenestration and door U-factor and product ratingsNazzareno Callipoenergy_progress
07/17/2024Insulation placement and R valuesNazzareno Callipoenergy_progress
07/17/2024Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
07/17/2024FinalNazzareno Callipoprogress
07/17/2024Fire-Resistance Rated ConstructionNazzareno Callipoprogress
07/17/2024Structural Wood FrameNazzareno Callipoprogress
07/11/2024Energy Code Compliance InspectionsNazzareno Callipoprogress
07/11/2024HVAC-R and service water heating system controlsNazzareno Callipoenergy_progress
07/11/2024HVAC-R and service water piping design and insulationNazzareno Callipoenergy_progress
07/11/2024HVAC-R and service water heating equipmentNazzareno Callipoenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026Q00993713-S1Request digital key ↗
08/22/2026Q00993713-I1Request digital key ↗
08/22/2026Q00993713-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00993713-S1Open ↗
09/02/2026Q00993713-S1Open ↗
08/24/2026Q00993713-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026Q00993713-I1Open ↗
08/22/2026Q00993713-S1Open ↗
08/13/2026Q00993713-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00993713-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026Q00993713-I1Open ↗
08/22/2026Q00993713-P1Open ↗
08/22/2026Q00993713-S1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026Q00993713-I1Open ↗
08/13/2026Q00993713-P2Open ↗