Two stories - detached, small or mid-size
1-51 BEACH 137 STREET
QUEENS · BIN 4306355
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2Zoning
1,672 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.42 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 213p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
1 job · most recent 08/10/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026Signed-offM&R IMPROVEMENTS CORPVentilation Systems
Ventilation
N/A ×1
1 job · most recent 05/17/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/17/2024Permit IssuedSAMUEL & SONS P & H INCGas, Water/Sanitary
1 job · most recent 08/10/2026
Masonry Wood
FiledStatusContractorScope
08/10/2026Signed-offM&R IMPROVEMENTS CORPMasonry, Wood
Building Lifecycle
All (52)Filed (7)Permit Issued (6)Signed Off (2)Inspection (7)Special Inspection (30)
08/14/2026
Signed off — Alteration
GENERAL CONSTRUCTION, MECHANICAL, FOUNDATION, & STRUCTURAL WORK TO RENOVATE EXISTING ONE FAMILY RESIDENCE AT THE FIRST & SECOND FLOORS AND OSP ONLY.
Q00988139-I1
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Geary
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
08/14/2026
Special inspection requirement — Subgrade Inspections
Jeffrey Geary
08/14/2026
Special inspection requirement — Mechanical Systems
Jeffrey Geary
08/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Jeffrey Geary
08/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Geary
08/14/2026
Special inspection requirement — Masonry
Jeffrey Geary
08/14/2026
Special inspection requirement — Footing and Foundation
Jeffrey Geary
08/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Geary
08/14/2026
Special inspection requirement — Final
Jeffrey Geary
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Geary
08/14/2026
Special inspection requirement — Ventilation and air distribution system
Jeffrey Geary
08/14/2026
Special inspection requirement — Air barrier - visual inspection
Jeffrey Geary
08/14/2026
Special inspection requirement — Insulation placement and R values
Jeffrey Geary
08/14/2026
Special inspection requirement — Maintenance information
Jeffrey Geary
08/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Geary
08/14/2026
Special inspection requirement — Fenestration areas
Jeffrey Geary
08/14/2026
Special inspection requirement — Permanent certificate
Jeffrey Geary
08/14/2026
Special inspection requirement — Interior lighting power
Jeffrey Geary
08/14/2026
Special inspection requirement — Fenestration air leakage
Jeffrey Geary
08/10/2026
Filed — Alteration
GENERAL CONSTRUCTION, MECHANICAL, FOUNDATION, & STRUCTURAL WORK TO RENOVATE EXISTING ONE FAMILY RESIDENCE AT THE FIRST & SECOND FLOORS AND OSP ONLY.
Q00988139-P3
06/16/2026
Filed — Alteration
GENERAL CONSTRUCTION, MECHANICAL, FOUNDATION, & STRUCTURAL WORK TO RENOVATE EXISTING ONE FAMILY RESIDENCE AT THE FIRST & SECOND FLOORS AND OSP ONLY.
Q00988139-P2
05/28/2026
Special inspection requirement — Fenestration areas
Jeffrey Geary
05/28/2026
Special inspection requirement — Air barrier - visual inspection
Jeffrey Geary
05/28/2026
Special inspection requirement — Fenestration air leakage
Jeffrey Geary
05/28/2026
Special inspection requirement — Ventilation and air distribution system
Jeffrey Geary
05/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Geary
05/28/2026
Special inspection requirement — Maintenance information
Jeffrey Geary
05/28/2026
Special inspection requirement — Insulation placement and R values
Jeffrey Geary
05/28/2026
Special inspection requirement — Masonry
Jeffrey Geary
05/28/2026
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Geary
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
04/03/2026
Permit issued — General Construction
Q00988139-I1-GC-CX
10/03/2025
Permit issued — Mechanical Systems
Q00988139-I1-GC-CX
07/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/02/2025
Permit issued — Plumbing
Q00988134-I1-PL
06/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/11/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2024
Signed off — Alteration
Installation of temporary construction fence to be removed only after all physical work is completed.
Q00988132-I1
05/17/2024
Filed — Alteration
CAP & REMOVE (1) TUB, REPLACE (1) TOILET, (1)LAVATORY ON EXISTING ROUGHING AT THE SECOND FLOOR, RELOCATE (1) SINK) & (1) GAS RANGE, PROVIDE (1)GAS FIRED FIREPLACE, (2) DISHWASHER & (1) NEW SINK AT THE FIRST FLOOR & (1) SHOWER AT THE SECOND FL.
Q00988134-P1
05/17/2024
Filed — Alteration
GENERAL CONSTRUCTION, MECHANICAL, FOUNDATION, & STRUCTURAL WORK TO RENOVATE EXISTING ONE FAMILY RESIDENCE AT THE FIRST & SECOND FLOORS AND OSP ONLY.
Q00988139-P1
04/12/2024
Permit issued — Plumbing
Q00988134-I1-PL
04/01/2024
Permit issued — Construction Fence
Q00988132-I1-FN
04/01/2024
Permit issued — Structural
Q00988139-I1-GC-CX
01/15/2024
Filed — Alteration
GENERAL CONSTRUCTION, MECHANICAL, FOUNDATION, & STRUCTURAL WORK TO RENOVATE EXISTING ONE FAMILY RESIDENCE AT THE FIRST & SECOND FLOORS AND OSP ONLY.
Q00988139-I1
01/15/2024
Filed — Alteration
Installation of temporary construction fence to be removed only after all physical work is completed.
Q00988132-I1
01/15/2024
Filed — Alteration
CAP & REMOVE (1) TUB, REPLACE (1) TOILET, (1)LAVATORY ON EXISTING ROUGHING AT THE SECOND FLOOR, RELOCATE (1) SINK) & (1) GAS RANGE, PROVIDE (1)GAS FIRED FIREPLACE, (2) DISHWASHER & (1) NEW SINK AT THE FIRST FLOOR & (1) SHOWER AT THE SECOND FL.
Q00988134-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2023$1.0M—— → —$613/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AVID DESIGNS, INC708/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NACCARATO CONTRACTING INCGeneral Contractor404/09/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
M&R IMPROVEMENTS CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVID DESIGNS, INC.453408/10/2026
LAURIA ASSOCIATES7570205/17/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offM&R IMPROVEMENTS CORP04/03/2026
DOB NOWMechanical SystemsSigned-offNACCARATO CONTRACTING INC10/03/2025
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC06/02/2025
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC04/12/2024
DOB NOWConstruction FenceSigned-offNACCARATO CONTRACTING INC04/01/2024
DOB NOWStructuralSigned-offNACCARATO CONTRACTING INC04/01/2024
BISPLISSUEDJ.G BATTISTA PLUMBING & HEATING08/13/2003
BISOTISSUEDTWO BROTHERS INC06/12/2003
BISOTISSUEDDYER HOME IMPROVEMENT CORP.12/24/1998
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2024Pass-Final PL - UndergroundPassView ↗
07/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/14/2026Structural Stability – Alterations of existing buildingsJeffrey Gearyspecial
08/14/2026Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
08/14/2026Subgrade InspectionsJeffrey Gearyspecial
08/14/2026Mechanical SystemsJeffrey Gearyspecial
08/14/2026Subsurface Investigations (Borings/Test Pits)Jeffrey Gearyspecial
08/14/2026Concrete - Cast-In-PlaceJeffrey Gearyspecial
08/14/2026MasonryJeffrey Gearyspecial
08/14/2026Footing and FoundationJeffrey Gearyprogress
08/14/2026Fire-Resistance Rated ConstructionJeffrey Gearyprogress
08/14/2026FinalJeffrey Gearyprogress
08/14/2026Energy Code Compliance InspectionsJeffrey Gearyprogress
08/14/2026Ventilation and air distribution systemJeffrey Gearyenergy_progress
08/14/2026Air barrier - visual inspectionJeffrey Gearyenergy_progress
08/14/2026Insulation placement and R valuesJeffrey Gearyenergy_progress
08/14/2026Maintenance informationJeffrey Gearyenergy_progress
08/14/2026Fenestration and door U-factor and product ratingsJeffrey Gearyenergy_progress
08/14/2026Fenestration areasJeffrey Gearyenergy_progress
08/14/2026Permanent certificateJeffrey Gearyenergy_progress
08/14/2026Interior lighting powerJeffrey Gearyenergy_progress
08/14/2026Fenestration air leakageJeffrey Gearyenergy_progress
05/28/2026Fenestration areasJeffrey Gearyenergy_progress
05/28/2026Air barrier - visual inspectionJeffrey Gearyenergy_progress
05/28/2026Fenestration air leakageJeffrey Gearyenergy_progress
05/28/2026Ventilation and air distribution systemJeffrey Gearyenergy_progress
05/28/2026Fenestration and door U-factor and product ratingsJeffrey Gearyenergy_progress
Latest 25 of 47.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00988132-I1Request digital key ↗
08/22/2026Q00988139-P1Request digital key ↗
08/22/2026Q00988139-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026Q00988139-P2Open ↗
08/27/2026Q00988139-P2Open ↗
08/26/2026Q00988134-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026Q00988139-I1Open ↗
08/22/2026Q00988139-P1Open ↗
08/22/2026Q00988139-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q00988139-P2Open ↗
08/26/2026Q00988134-I1Open ↗
08/24/2026Q00988134-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026Q00988139-P1Open ↗
08/22/2026Q00988139-I1Open ↗
08/22/2026Q00988139-P3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/22/2026Q00988139-P2Open ↗
08/22/2026Q00988139-P3Open ↗
08/13/2026Q00988139-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/10/2023400886190Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00988139-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00988139-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/13/2023400886190Open ↗