| Firm | Filings | Most Recent |
|---|---|---|
| NA | 1 | 10/04/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| ADAM BERGMAN CONSTRUCTION AND DEVEL | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| MOTTES, STEVE | Electrical | 1 | 03/21/2026 |
| SANDHA GENERAL CONTRACTIN | Electrical | 1 | 03/21/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/20/2022 | Lowest Floor Elevation | — | progress |
| 09/21/2021 | Concrete - Cast-In-Place | — | special |
| 09/21/2021 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 09/21/2021 | Fire-Resistant Penetrations and Joints | — | special |
| 09/21/2021 | Seismic Isolation Systems | — | special |
| 09/21/2021 | Structural Stability – Alterations of existing buildings | — | special |
| 09/21/2021 | Energy Code Compliance Inspections | — | progress |
| 09/21/2021 | Fire-Resistance Rated Construction | — | progress |
| 09/21/2021 | Preliminary | — | progress |
| 09/21/2021 | Insulation placement and R values | — | energy_progress |
| 09/21/2021 | Fenestration areas | — | energy_progress |
| 09/21/2021 | Electric vehicle service equipment requirements | — | energy_progress |
| 09/21/2021 | Air barrier — testing | — | energy_progress |
| 09/21/2021 | Interior lighting power | — | energy_progress |
| 09/21/2021 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/21/2021 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 09/21/2021 | Maintenance information | — | energy_progress |
| 09/21/2021 | Protection of exposed foundation insulation | — | energy_progress |
| 09/21/2021 | Air barrier - visual inspection | — | energy_progress |
| 09/21/2021 | Chimneys and vents | — | special |
| 09/21/2021 | Permanent certificate | — | energy_progress |