← Back
Elevator apt, semi-fireproof with stores
88-32 50 AVENUE
QUEENS · BIN 4311323
💬 Discuss this project
1990Year Built
8Stories
D7Building Class
R5Zoning
26,000 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized41 Open Violations 39 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: TEAM L MGMNT LLC · 9,750 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES309/15/2026
TOWER 88607/08/2026
SHAH GROUP ENTERPRISES IN307/08/2026
GSR CONTRACTOR INC.503/22/2026
TEAM L MGMNT LLC1503/22/2026
TEAM MGMNT LLC203/22/2026
TEAM L MANAGEMENT1503/22/2026
AL/BAGUIDICE CONST. CORP103/22/2026
ALBA GUIDICE CORP.103/22/2026
TAJ MAHAL CONTRACTING COR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB109/09/2026
ASR ENGINEERING PC105/18/2025
ASHRAF CORP105/07/2024
MA ENGINEERING, P.C.102/15/2024
LIGHT HOUSE204/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
MA ENGINEERING P C203/21/2026
HAQUE ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSR CONTRACTOR INCGeneral Contractor303/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor209/12/2026
MCSHANELLE CONTRACTING INGeneral Contractor107/08/2026
SHAH GROUP ENTERPRISES INGeneral Contractor107/08/2026
SUNSHINE BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963102/15/2024
Building Lifecycle
All (80)Filed (6)Permit Issued (6)Signed Off (3)Facade (FISP) (3)Violation (60)Special Inspection (2)
09/10/2026
Permit issued — Supported Scaffold
Q01457746-I1-SF
09/09/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01457746-I1
09/09/2026
Permit issued — Sidewalk Shed
Q01457607-I1-SH
06/25/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01222327-I1
05/19/2025
Permit issued — Supported Scaffold
Q01222327-I1-SF
05/18/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01222327-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2024
Signed off — Alteration
Application filing remove and replace defective stucco at west facade apprx. 400 sf as per plan. No change of use, egress and occupancy under application.
Q01001241-I1
10/15/2024
Signed off — Alteration
Q01046288-I1
09/26/2024
Permit issued — Sidewalk Shed
Q01046288-I1-SH
05/07/2024
Filed — Alteration
Q01046288-I1
04/05/2024
Permit issued — General Construction
Q01001241-I1-GC
03/20/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2024
Violation issued (FDNY_NOV, closed)
02/15/2024
Filed — Alteration
Application filing remove and replace defective stucco at west facade apprx. 400 sf as per plan. No change of use, egress and occupancy under application.
Q01001241-I1
02/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
IGOR LISOVENKO
02/05/2024
Special inspection requirement — Final
MOATEZ ALI
01/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/15/2024
Violation issued (ECB, closed)
Construction
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2023
Violation issued (FDNY_NOV, closed)
08/20/2023
Cycle 9 facade report submitted
08/20/2023
Cycle 9 facade report signed — SWARMP
07/20/2023
Cycle 9 facade inspection completed
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/28/2023
Violation issued (HPD, closed)
A
12/02/2022
Violation issued (ECB, closed)
Local Law
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2022
Violation issued (ECB, closed)
Unknown
03/03/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/13/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2021
Violation issued (ECB, closed)
Local Law
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/14/2021
Violation issued (HPD, closed)
I
04/14/2021
Violation issued (HPD, closed)
A
08/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2020
Violation issued (ECB, closed)
Construction
05/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/07/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/2019
Violation issued (ECB, closed)
Construction
05/10/2019
Violation issued (ECB, closed)
Boilers
05/10/2019
Violation issued (ECB, open)
Boilers
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/15/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
Q00154045-I1
04/15/2019
Permit issued — Supported Scaffold
Q00154045-I1-SF
04/13/2019
Filed — Alteration
Q00154044-I1
04/03/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2019
Violation issued (ECB, closed)
Construction
01/01/2019
Violation issued (ECB, closed)
Construction
08/29/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC09/10/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC09/09/2026
DOB NOWSupported ScaffoldSigned-offGSR CONTRACTOR INC05/19/2025
DOB NOWSidewalk ShedSigned-offSUNSHINE BUILDERS INC09/26/2024
DOB NOWGeneral ConstructionSigned-offMCSHANELLE CONTRACTING IN04/05/2024
DOB NOWSupported ScaffoldPermit IssuedSHAH GROUP ENTERPRISES IN04/15/2019
BISOTISSUEDTAJ MAHAL CONTRACTING COR11/01/2019
BISOTISSUEDCONSTRUCTION HEADS INC04/01/2019
BISSPISSUEDDANICA PLG. & HTG.07/11/1990
2 projects · most recent 09/09/2026
FiledStatusContractorScope
09/09/2026Permit IssuedRICHARD NEU—
04/10/2019Permit IssuedRICHARD NEU—
2 projects · most recent 09/09/2026
Scaffold
FiledStatusContractorScope
09/09/2026Permit IssuedRELIABLE ENTERPRISES INCScaffold
04/15/2019Permit IssuedSHAH GROUP ENTERPRISES INScaffold
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/05/2024Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
02/05/2024FinalMOATEZ ALIprogress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/15/2026Q01457746-I1Request digital key ↗
08/23/2026Q01001241-I1Request digital key ↗
08/22/2026Q01046288-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00154044-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00154045-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
11/08/2019421905264Open ↗
03/29/2019440540899Open ↗
▸BISWORK PERMIT APPLICATION2
11/08/2019421905264Open ↗
03/29/2019440540899Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/11/2026Q01457746-I1Open ↗
08/28/2026Q00154044-I1Open ↗
08/22/2026Q01046288-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/14/2020421905264Open ↗
11/08/2019421905264Open ↗
07/30/2019440540899Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/08/2019421905264Open ↗
03/29/2019440540899Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/08/2019421905264Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/29/2019440540899Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2019440540899Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q01001241-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01001241-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
03/29/2019440540899Open ↗
11/08/2019421905264Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/29/2019440540899Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/14/2020421905264Open ↗
11/08/2019421905264Open ↗
07/30/2019440540899Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/14/2020421905264Open ↗
07/30/2019440540899Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/29/2019440540899Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/29/2019440540899Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/29/2019440540899Open ↗
03/29/2019440540899Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/29/2020421905264Open ↗
01/14/2020421905264Open ↗
07/31/2019440540899Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
01/17/2020421905264Open ↗
11/08/2019421905264Open ↗
07/30/2019440540899Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/08/2019421905264Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2019440540899Open ↗