← Back
Multi-story retail building (2+)
88-28 ROOSEVELT AVENUE
QUEENS · BIN 4314474
💬 Discuss this project
1989Year Built
2Stories
K2Building Class
R6Zoning
2,673 sfGross Floor Area
5Units
23 Open Violations 20 unresolved · 3 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: NUEVO MEXICO LINDO SU ABARROTERA CENTRAL CORP · 2,016 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NUEVO MEXICO LINDO SU ABARROTERA1003/22/2026
TOLLENTINO REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.111/23/2025
MADRIAGA ENGINEERING P.C.404/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BERNARDO GAMBA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor303/21/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637104/11/2025
Building Lifecycle
All (70)Filed (5)Permit Issued (2)Signed Off (2)Violation (43)Inspection (5)Special Inspection (13)
08/07/2026
Signed off — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATION 020700LL629126656; 022701LL629126305; AS WELL AS ECB VIOLATIONS 39122146L; 34751564Y; 39130204K; 34751563M AND 32053876M. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
Q01205690-S1
01/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2025
Permit issued — Plumbing
Q01205690-S1-PL
12/04/2025
Signed off — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATION 020700LL629126656; 022701LL629126305; AS WELL AS ECB VIOLATIONS 39122146L; 34751564Y; 39130204K; 34751563M AND 32053876M. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
Q01205690-I1
11/23/2025
Filed — Alteration
INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01286466-I1
11/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/15/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/03/2025
Permit issued — General Construction
Q01205690-I1-GC
07/02/2025
Violation issued (FDNY_NOV, closed)
05/30/2025
Violation issued (ECB, open)
Construction
04/11/2025
Filed — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATION 020700LL629126656; 022701LL629126305; AS WELL AS ECB VIOLATIONS 39122146L; 34751564Y; 39130204K; 34751563M AND 32053876M. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
Q01205690-S1
04/11/2025
Filed — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATION 020700LL629126656; 022701LL629126305; AS WELL AS ECB VIOLATIONS 39122146L; 34751564Y; 39130204K; 34751563M AND 32053876M. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
Q01205690-I1
04/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
04/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
04/03/2025
Special inspection requirement — Interior lighting power
Robert Truskosky
04/03/2025
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
03/28/2025
Filed — Alteration
ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATION 020700LL629126656; 022701LL629126305;032602LL629127490; AS WELL AS ECB VIOLATIONS 122146L;34751564Y;39130204K;34751563M AND 32053876M. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED
Q01199336-S1
03/27/2025
Filed — Alteration
ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATION 020700LL629126656; 022701LL629126305;032602LL629127490; AS WELL AS ECB VIOLATIONS 122146L;34751564Y;39130204K;34751563M AND 32053876M. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED
Q01199336-I1
03/27/2025
Special inspection requirement — Energy Code Compliance Inspections
03/27/2025
Special inspection requirement — Energy Code Compliance Inspections
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/27/2025
Special inspection requirement — Air barrier - visual inspection
03/27/2025
Special inspection requirement — Interior lighting power
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/22/2025
Special inspection requirement — Final
12/26/2024
Violation issued (ECB, closed)
Construction
11/14/2024
Violation issued (ECB, open)
Construction
11/14/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2024
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2022
Violation issued (FDNY_NOV, closed)
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2019
Violation issued (FDNY_NOV, closed)
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/20/2018
Violation issued (FDNY_NOV, closed)
03/20/2018
Violation issued (FDNY_NOV, closed)
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/24/2016
Violation issued (ECB, open)
Boilers
05/05/2016
Violation issued (FDNY_NOV, closed)
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2012
Violation issued (FDNY_NOV, closed)
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/14/2009
Violation issued (ECB, closed)
Construction
12/14/2009
Violation issued (ECB, open)
Construction
07/02/2007
Violation issued (ECB, open)
Boilers
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK12/30/2025
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC09/03/2025
2 projects · most recent 04/11/2025
Gas
FiledStatusContractorScope
04/11/2025Signed-offJUST PLBG & HTG INCGas
03/28/2025——Gas
1 project · most recent 03/22/2025
General Wiring
FiledStatusContractorScope
03/22/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/15/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/11/2025Energy Code Compliance InspectionsRobert Truskoskyprogress
04/03/2025Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
04/03/2025Energy Code Compliance InspectionsRobert Truskoskyprogress
04/03/2025Fire-Resistance Rated ConstructionRobert Truskoskyprogress
04/03/2025Interior lighting powerRobert Truskoskyenergy_progress
04/03/2025Air barrier - visual inspectionRobert Truskoskyenergy_progress
03/27/2025Energy Code Compliance Inspections—progress
03/27/2025Energy Code Compliance Inspections—progress
03/27/2025Fire-Resistance Rated Construction—progress
03/27/2025Air barrier - visual inspection—energy_progress
03/27/2025Interior lighting power—energy_progress
03/27/2025Fire-Resistant Penetrations and Joints—special
03/22/2025Final—progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01199336-S1Request digital key ↗
08/20/2026Q01199336-I1Request digital key ↗
08/20/2026Q01205690-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01205690-S1Open ↗
08/20/2026Q01205690-I1Open ↗
08/18/2026Q01286466-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01205690-I1Open ↗
09/01/2026Q01205690-I1Open ↗
08/25/2026Q01205690-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01205690-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01205690-I1Open ↗
▸Other Documents2
▸DOB NOWPro Cert Restriction Exception (LL158/17)2
08/13/2026Q01199336-I1Open ↗
08/13/2026Q01199336-S1Open ↗