← Back
Over six families without stores
90-32 53 AVENUE
QUEENS · BIN 4431626
💬 Discuss this project
1975Year Built
3Stories
C1Building Class
R5Zoning
16,900 sfGross Floor Area
30Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: ELMHURST VENTURA LLC · 7,500 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 2 filings · 11 docs
Floor 1
Basement1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELMHURST VENTURA LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RILDER MEJIA PE210/17/2025
HERO ARCHITECTS210/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARK CONTRACTING NY INCGeneral Contractor304/09/2026
ROSMIL TILE & PAINTING COGeneral Contractor107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292210/17/2025
BUILDTECH ENGINEERING6369111/02/2023
Building Lifecycle
All (78)Filed (4)Permit Issued (4)Signed Off (3)Violation (54)Special Inspection (13)
06/11/2026
Signed off — Alteration
PROPOSE TO REPAIR THE EXISTING FRONT PORCH STEPS AND REPLACE THE RAILING AS PER THE PLANS SUBMITTED HEREWITH.
Q00894165-I1
11/06/2025
Permit issued — Structural
Q00894165-I1-GC
11/06/2025
Permit issued — Structural
Q00894165-I1-ST
10/20/2025
Special inspection requirement — Final
Rilder Mejia
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
10/20/2025
Special inspection requirement — Post-installed Anchors
Luis Pichardo
10/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
10/20/2025
Special inspection requirement — Masonry
Luis Pichardo
10/17/2025
Filed — Alteration
PROPOSE TO REPAIR THE EXISTING FRONT PORCH STEPS AND REPLACE THE RAILING AS PER THE PLANS SUBMITTED HEREWITH.
Q00894165-P1
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Special inspection requirement — Masonry
Jose Santos
10/16/2025
Special inspection requirement — Post-installed Anchors
Jose Santos
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
10/16/2025
Special inspection requirement — Final
02/05/2025
Violation issued (HPD, closed)
B
02/05/2025
Violation issued (HPD, closed)
B
02/05/2025
Violation issued (HPD, closed)
C
02/05/2025
Violation issued (HPD, closed)
B
02/05/2025
Violation issued (HPD, closed)
C
02/05/2025
Violation issued (HPD, closed)
C
11/02/2023
Filed — Alteration
PROPOSE TO REPAIR THE EXISTING FRONT PORCH STEPS AND REPLACE THE RAILING AS PER THE PLANS SUBMITTED HEREWITH.
Q00894165-I1
09/22/2020
Signed off — Alteration
PROPOSE TO REPLACE BATHROOM EXHAUST FANS IN SIX APARTMENTS AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q00214646-I1
09/18/2020
Signed off — Alteration
PROPOSE TO REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING.
Q00202394-I1
10/29/2019
Permit issued — Plumbing
Q00202394-I1-PL
10/23/2019
Permit issued — Mechanical Systems
Q00214646-I1-MS
10/22/2019
Filed — Alteration
PROPOSE TO REPLACE BATHROOM EXHAUST FANS IN SIX APARTMENTS AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q00214646-I1
10/22/2019
Filed — Alteration
PROPOSE TO REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING.
Q00202394-I1
08/21/2019
Special inspection requirement — Final
martin hero
08/21/2019
Special inspection requirement — Fire-Resistance Rated Construction
martin hero
08/21/2019
Special inspection requirement — Mechanical Systems
Jose Santos
08/06/2019
Violation issued (HPD, closed)
I
08/06/2019
Violation issued (HPD, closed)
A
08/06/2019
Violation issued (HPD, closed)
I
08/06/2019
Violation issued (HPD, closed)
I
07/03/2019
Violation issued (HPD, closed)
C
07/03/2019
Violation issued (HPD, closed)
C
06/26/2019
Violation issued (HPD, open)
B
06/24/2019
Violation issued (HPD, closed)
C
06/24/2019
Violation issued (HPD, closed)
C
02/16/2017
Violation issued (HPD, closed)
C
11/01/2016
Violation issued (HPD, closed)
B
11/01/2016
Violation issued (HPD, closed)
B
10/24/2016
Violation issued (HPD, closed)
B
10/24/2016
Violation issued (HPD, closed)
B
12/31/2014
Violation issued (HPD, closed)
B
12/31/2014
Violation issued (HPD, closed)
A
12/31/2014
Violation issued (HPD, closed)
C
12/09/2014
Violation issued (HPD, closed)
B
12/09/2014
Violation issued (HPD, closed)
B
12/09/2014
Violation issued (HPD, closed)
C
12/09/2014
Violation issued (HPD, closed)
C
12/09/2014
Violation issued (HPD, closed)
B
12/09/2014
Violation issued (HPD, closed)
B
12/09/2014
Violation issued (HPD, closed)
B
07/15/2013
Violation issued (HPD, open)
A
07/15/2013
Violation issued (HPD, closed)
B
07/15/2013
Violation issued (HPD, closed)
B
07/15/2013
Violation issued (HPD, closed)
B
07/26/2011
Violation issued (ECB, closed)
Boilers
11/30/2009
Violation issued (HPD, closed)
B
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMARK CONTRACTING NY INC11/06/2025
DOB NOWStructuralSigned-offMARK CONTRACTING NY INC11/06/2025
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN10/29/2019
DOB NOWMechanical SystemsSigned-offROSMIL TILE & PAINTING CO10/23/2019
BISOTISSUEDROSMIL TILE & PAINTING CO10/18/2019
BIS—ISSUEDPRACTICAL CONSTRUCTORS, LTD.12/31/1991
1 project · most recent 06/19/2019
FiledStatusContractorScope
06/19/2019Permit IssuedALL WAYS ELECTRIC CORP.W—
1 project · most recent 10/17/2025
Masonry
FiledStatusContractorScope
10/17/2025Signed-offMARK CONTRACTING NY INCMasonry
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/20/2025FinalRilder Mejiaprogress
10/20/2025Structural Stability – Alterations of existing buildingsLuis Pichardospecial
10/20/2025Post-installed AnchorsLuis Pichardospecial
10/20/2025Tenant Protection Plan ComplianceLuis Pichardospecial
10/20/2025MasonryLuis Pichardospecial
10/16/2025Tenant Protection Plan Compliance—special
10/16/2025MasonryJose Santosspecial
10/16/2025Post-installed AnchorsJose Santosspecial
10/16/2025Structural Stability – Alterations of existing buildingsJose Santosspecial
10/16/2025Final—progress
08/21/2019Finalmartin heroprogress
08/21/2019Fire-Resistance Rated Constructionmartin heroprogress
08/21/2019Mechanical SystemsJose Santosspecial
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/18/2026Q00894165-P1Request digital key ↗
08/18/2026Q00894165-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00214646-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00202394-I1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
10/22/2019421935703Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/24/2019421935703Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature4
09/22/2026Q00894165-P1Open ↗
08/30/2026Q00214646-I1Open ↗
08/30/2026Q00214646-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00202394-I1Open ↗
08/18/2026Q00894165-I1Open ↗
08/13/2026Q00894165-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/22/2026Q00894165-P1Open ↗
08/30/2026Q00214646-I1Open ↗
08/28/2026Q00894165-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/24/2019421935703Open ↗
10/22/2019421935703Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/24/2019421935703Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/24/2019421935703Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/28/2026Q00202394-I1Open ↗
08/13/2026Q00214646-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026Q00202394-I1Open ↗
08/18/2026Q00894165-I1Open ↗
08/13/2026Q00214646-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2019421935703Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
10/21/2020421935703Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/21/2020421935703Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2019421935703Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/21/2020421935703Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/21/2020421935703Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/21/2020421935703Open ↗
10/24/2019421935703Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/24/2019421935703Open ↗