55-10 103 STREET
QUEENS · BIN 4431674
💬 Discuss this project
1931Year Built
1Stories
C3Building Class
R6BZoning
3,317 sfGross Floor Area
4Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Four families · Owner of record: WEN CHANG LLC · 2,833 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2016$915K—— → —$276/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC105/07/2026
RIGID STRUCTURAL DESIGN, LLC104/28/2026
AMERILAND BROOK LLC310/22/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JABBIE INDUSTRIES INCORP*General Contractor106/28/2026
KALE CONSTRUCTION INCGeneral Contractor107/03/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402105/07/2026
AMERILAND BROOK LLC1506310/22/2022
Building Lifecycle
All (79)Filed (5)Permit Issued (3)Signed Off (3)Violation (59)Inspection (5)Special Inspection (4)
08/03/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01390596-I1
07/30/2026
Signed off — Alteration
Q01399189-I1
06/23/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/12/2026
Permit issued — General Construction
Q01399189-I1-GC
05/07/2026
Filed — Alteration
Q01399189-I1
05/07/2026
Violation issued (HPD, open)
A
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN ILL
04/28/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01390596-I1
04/28/2026
Permit issued — Sidewalk Shed
Q01390596-I1-SH
11/21/2025
Violation issued (HPD, open)
I
06/12/2025
Violation issued (HPD, open)
A
07/11/2024
Violation issued (HPD, closed)
C
06/25/2024
Violation issued (HPD, closed)
C
06/25/2024
Violation issued (HPD, closed)
A
06/25/2024
Violation issued (HPD, open)
A
06/25/2024
Violation issued (HPD, open)
B
06/25/2024
Violation issued (HPD, closed)
A
05/28/2024
Violation issued (HPD, closed)
B
04/27/2024
Violation issued (HPD, closed)
C
04/27/2024
Violation issued (HPD, open)
C
04/27/2024
Violation issued (HPD, closed)
C
04/27/2024
Violation issued (HPD, closed)
C
04/27/2024
Violation issued (HPD, closed)
C
04/27/2024
Violation issued (HPD, closed)
C
04/15/2024
Violation issued (HPD, open)
A
03/26/2024
Violation issued (HPD, closed)
C
11/24/2023
Violation issued (HPD, closed)
I
03/28/2023
Violation issued (HPD, closed)
A
12/20/2022
Signed off — Alteration
REPLACE BOILER & HOT WATER HEATER IN BOILER ROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00630709-I1
11/15/2022
Violation issued (HPD, closed)
I
11/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2022
Filed — Alteration
REPLACE BOILER & HOT WATER HEATER IN BOILER ROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00630709-P2
10/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
10/22/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
10/11/2022
Violation issued (HPD, closed)
C
10/11/2022
Violation issued (HPD, closed)
B
10/11/2022
Violation issued (HPD, closed)
C
10/11/2022
Violation issued (HPD, closed)
B
10/11/2022
Violation issued (HPD, closed)
C
10/08/2022
Violation issued (HPD, closed)
B
10/08/2022
Violation issued (HPD, closed)
C
10/08/2022
Violation issued (HPD, closed)
C
10/08/2022
Violation issued (HPD, closed)
B
10/08/2022
Violation issued (HPD, closed)
B
10/08/2022
Violation issued (HPD, closed)
C
10/08/2022
Violation issued (HPD, closed)
A
10/08/2022
Violation issued (HPD, closed)
B
10/07/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/04/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, closed)
A
02/24/2022
Filed — Alteration
REPLACE BOILER & HOT WATER HEATER IN BOILER ROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00630709-P1
01/21/2022
Permit issued — Plumbing
Q00630709-I1-PL
11/15/2021
Filed — Alteration
REPLACE BOILER & HOT WATER HEATER IN BOILER ROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00630709-I1
04/15/2021
Violation issued (HPD, closed)
A
11/25/2019
Violation issued (HPD, closed)
A
11/25/2019
Violation issued (HPD, closed)
C
11/25/2019
Violation issued (HPD, closed)
A
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/12/2026
DOB NOWSidewalk ShedSigned-offJABBIE INDUSTRIES INCORP*04/28/2026
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG01/21/2022
1 project · most recent 04/22/2026
FiledStatusContractorScope
04/22/2026CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 04/28/2026
Sidewalk Shed
FiledStatusContractorScope
04/28/2026Signed-offJABBIE INDUSTRIES INCORP*Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
11/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/07/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
05/07/2026Tenant Protection Plan ComplianceBRIAN ILLspecial
10/22/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
10/22/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00630709-P2Request digital key ↗
08/27/2026Q00630709-I1Request digital key ↗
08/27/2026Q00630709-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01390596-I1Open ↗
08/16/2026Q01399189-I1Open ↗
08/13/2026Q00630709-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026Q01399189-I1Open ↗
08/24/2026Q01399189-I1Open ↗
08/23/2026Q00630709-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q00630709-P2Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01399189-I1Open ↗