← Back
Elevator apt, semi-fireproof with stores
98-09 65 ROAD
QUEENS · BIN 4432002
💬 Discuss this project
1938Year Built
6Stories
D7Building Class
R7-1Zoning
255,400 sfGross Floor Area
240Units
LL97 CoveredRent Stabilized46 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: QUEENS PORTFOLIO V, LLC · 114,517 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
Architecture
Floor 65p · 1 filing · 12 docs
Floor 55p · 1 filing · 12 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUEENS PARK REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WRG ENGINEERING, P.C.209/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WRG ENGINEERING P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JW DEVELOPMENT HOLDINGS LGeneral Contractor207/08/2026
HENRY MYERS P & H, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG ENGINEERING, P.C.4403105/24/2021
Building Lifecycle
All (62)Filed (2)Permit Issued (3)Violation (49)Inspection (4)Special Inspection (4)
07/21/2026
Violation issued (HPD, open)
C
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
C
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
12/05/2024
Violation issued (HPD, closed)
B
12/05/2024
Violation issued (HPD, closed)
C
12/05/2024
Violation issued (HPD, closed)
C
04/08/2024
Violation issued (HPD, closed)
B
04/08/2024
Violation issued (HPD, closed)
B
04/08/2024
Violation issued (HPD, closed)
B
04/08/2024
Violation issued (HPD, closed)
C
01/13/2024
Violation issued (HPD, closed)
C
01/13/2024
Violation issued (HPD, closed)
C
11/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2022
Permit issued — Plumbing
Q08005026-I1-PL
09/27/2022
Filed — Alteration
Installation of new washer machine for apt 6B as per plans filed herewith.
Q08005026-I1
04/04/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2022
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
03/07/2022
Violation issued (ECB, closed)
Elevators
01/20/2022
Permit issued — General Construction
Q00523213-I1-GC
07/26/2021
Permit issued — General Construction
Q00523213-I1-GC
05/24/2021
Filed — Alteration
Combination of Apt 5B and 6B as per plans filed herewith. New Apartment Names: Apt 5BB and Apt 6BB
Q00523213-I1
05/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Winston Garcia
05/21/2021
Special inspection requirement — Air barrier - visual inspection
Winston Garcia
05/21/2021
Special inspection requirement — Insulation placement and R values
Winston Garcia
05/17/2021
Special inspection requirement — Final
Winston Garcia
10/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2020
Violation issued (ECB, closed)
Elevators
03/06/2020
Violation issued (ECB, closed)
Elevators
11/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/05/2019
Violation issued (HPD, closed)
A
02/05/2019
Violation issued (HPD, closed)
A
10/16/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/24/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/09/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/21/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/11/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/22/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC10/10/2022
DOB NOWGeneral ConstructionPermit IssuedJW DEVELOPMENT HOLDINGS L01/20/2022
DOB NOWGeneral ConstructionPermit IssuedJW DEVELOPMENT HOLDINGS L07/26/2021
BISOTISSUEDVLAD RESTORATION LTD07/26/2002
BISEQISSUEDVLAD RESTORATION LTD07/26/2002
1 job · most recent 09/27/2022
Water/Sanitary
FiledStatusContractorScope
09/27/2022Signed-offHENRY MYERS P & H, INCWater/Sanitary
2 jobs · most recent 09/21/2022
General Wiring
FiledStatusContractorScope
09/21/2022Permit IssuedARGON ELECTRICAL CORPGeneral Wiring
06/17/2021CompleteSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/11/2022Fail-Final SP - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/21/2021Fire-Resistant Penetrations and JointsWinston Garciaspecial
05/21/2021Air barrier - visual inspectionWinston Garciaenergy_progress
05/21/2021Insulation placement and R valuesWinston Garciaenergy_progress
05/17/2021FinalWinston Garciaprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00523213-P1Request digital key ↗
08/27/2026Q00523213-I1Request digital key ↗
08/25/2026Q08005026-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q00523213-P1Open ↗
08/29/2026Q00523213-P1Open ↗
08/25/2026Q00523213-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00523213-I1Open ↗
08/25/2026Q08005026-I1Open ↗
08/13/2026Q00523213-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q00523213-P1Open ↗
08/25/2026Q00523213-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00523213-I1Open ↗
08/25/2026Q08005026-I1Open ↗
08/13/2026Q00523213-P1Open ↗