← Back
Elevator cooperative
Ruskin Apartments
66-38 YELLOWSTONE BLVD · BIN 4432099
💬 Discuss this project
1950Year Built
6Stories
D4Building Class
R7-1Zoning
222,030 sfGross Floor Area
246Units
LL97 CoveredRent Stabilized59 Open Violations 58 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: QUALITY & RUSKIN APTS CORP · 78,129 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 12 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY407/08/2026
QUALITY-RUSKIN HOUSING UN1103/22/2026
ARGO103/22/2026
RUSKIN & QUALITY CORP.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
L L CONSULTING SERVICES203/21/2026
WRG ENGINEERING P C203/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIBERTY CONSTRUCTION & REGeneral Contractor407/08/2026
TRIBUTE RESTORATION INCGeneral Contractor204/09/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
ALL CITY MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG ENGINEERING, P.C.4403208/07/2025
EC SPECIAL INSPECTIONS8355209/13/2023
BUTTERFIELD & O'CONNOR4189102/27/2022
Building Lifecycle
All (113)Filed (6)Permit Issued (6)Signed Off (1)Facade (FISP) (14)Violation (60)Inspection (4)Objection (2)Special Inspection (20)
08/07/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, closed)
Construction
06/16/2026
Violation issued (ECB, closed)
Unknown
03/24/2026
Permit issued — Structural
Q01230044-I1-GC-CX
02/17/2026
Permit issued — Structural
Q01133287-I1-ST
09/08/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Admin
08/07/2025
Filed — Alteration
Restoration existing parking garage including garage roof replacement as per plans submitted. No changes to the egress, use or occupancy under this application.
Q01230044-I1
08/07/2025
Special inspection requirement — Insulation placement and R values
Carlos Honorio, Jr.
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Winston Garcia
07/21/2025
Special inspection requirement — Post-installed Anchors
Winston Garcia
07/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Winston Garcia
07/21/2025
Special inspection requirement — Structural Steel - Details
Winston Garcia
07/21/2025
Special inspection requirement — Masonry
Winston Garcia
07/21/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Winston Garcia
07/21/2025
Special inspection requirement — Structural Steel - Welding
Winston Garcia
07/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Winston Garcia
05/22/2025
Special inspection requirement — Final
Carlos Honorio, Jr.
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2025
Violation issued (FDNY_NOV, closed)
12/14/2024
Violation issued (ECB, closed)
Construction
12/07/2024
Violation issued (ECB, closed)
Construction
11/05/2024
Filed — Alteration
TEMPORARY SHORING OF EXISTING GARAGE.
Q01133287-I1
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
Winston Garcia
10/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Winston Garcia
10/28/2024
Special inspection requirement — Final
Winston Garcia
10/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2024
Violation issued (ECB, closed)
Construction
07/19/2024
Cycle 9 facade inspection completed
06/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2024
Cycle 9 facade report signed — SWARMP
05/31/2024
Permit issued — General Construction
Q00659491-I1-GC
05/09/2024
Permit issued — Sidewalk Shed
Q01047302-I1-SH
05/08/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01047302-I1
02/20/2024
Cycle 9 facade report submitted
01/23/2024
Signed off — Alteration
Replacing an existing 3/4" gas pipe line with 1" gas pipe serving four laundry room gas clothes dryers and oil burner gas pilot. Replacing existing 3/4" flexible gas pipe with 3/4" hard pipe serving individual gas clothes dryers.
Q00882924-I1
11/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
09/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
09/13/2023
Filed — Alteration
Replacing an existing 3/4" gas pipe line with 1" gas pipe serving four laundry room gas clothes dryers and oil burner gas pilot. Replacing existing 3/4" flexible gas pipe with 3/4" hard pipe serving individual gas clothes dryers.
Q00882924-P1
08/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
08/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
06/23/2023
Permit issued — Plumbing
Q00882924-I1-PL
06/15/2023
Filed — Alteration
Replacing an existing 3/4" gas pipe line with 1" gas pipe serving four laundry room gas clothes dryers and oil burner gas pilot. Replacing existing 3/4" flexible gas pipe with 3/4" hard pipe serving individual gas clothes dryers.
Q00882924-I1
12/02/2022
Violation issued (ECB, closed)
Local Law
08/05/2022
Permit issued — General Construction
Q00659491-I1-GC
02/27/2022
Filed — Alteration
FACADE REPAIR AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
Q00659491-I1
02/18/2022
Cycle 9 facade report submitted
01/25/2022
Cycle 9 facade inspection completed
01/12/2022
Special inspection requirement — Masonry
BRIAN T. O'CONNOR
01/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
01/09/2022
Special inspection requirement — Final
JAMES CORNEJO
04/16/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, open)
C
04/16/2021
Violation issued (HPD, open)
B
04/16/2021
Violation issued (HPD, open)
B
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTRIBUTE RESTORATION INC03/24/2026
DOB NOWStructuralSigned-offTRIBUTE RESTORATION INC02/17/2026
DOB NOWGeneral ConstructionPermit IssuedLIBERTY CONSTRUCTION & RE05/31/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP05/09/2024
DOB NOWPlumbingSigned-offALL CITY MECHANICAL INC06/23/2023
DOB NOWGeneral ConstructionPermit IssuedLIBERTY CONSTRUCTION & RE08/05/2022
BISPLISSUEDLANDMARK PLUMBING & HEATING07/26/2018
BISPLISSUEDBELL FUEL OIL, LLC11/06/2002
BISFSISSUEDABILENE, INC11/06/2002
3 projects · most recent 08/07/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/07/2025Permit IssuedTRIBUTE RESTORATION INCSteel, Concrete, Masonry
11/05/2024Signed-offTRIBUTE RESTORATION INC1 scope_items
02/27/2022Permit IssuedLIBERTY CONSTRUCTION & RE1 scope_items
1 project · most recent 05/08/2024
Sidewalk Shed
FiledStatusContractorScope
05/08/2024Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/07/2026Fail-Final CND-Occupancy InspectionFailView ↗
06/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/07/2025Insulation placement and R valuesCarlos Honorio, Jr.energy_progress
07/22/2025Fire-Resistant Penetrations and JointsWinston Garciaspecial
07/21/2025Post-installed AnchorsWinston Garciaspecial
07/21/2025Structural Stability – Alterations of existing buildingsWinston Garciaspecial
07/21/2025Structural Steel - DetailsWinston Garciaspecial
07/21/2025MasonryWinston Garciaspecial
07/21/2025Structural Steel - High Strength BoltingWinston Garciaspecial
07/21/2025Structural Steel - WeldingWinston Garciaspecial
07/21/2025Tenant Protection Plan ComplianceWinston Garciaspecial
05/22/2025FinalCarlos Honorio, Jr.progress
11/04/2024Tenant Protection Plan ComplianceWinston Garciaspecial
10/29/2024Structural Stability – Alterations of existing buildingsWinston Garciaspecial
10/28/2024FinalWinston Garciaprogress
09/14/2023Energy Code Compliance InspectionsArthur Harrisprogress
09/14/2023Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
08/31/2023Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
08/31/2023Energy Code Compliance InspectionsArthur Harrisprogress
01/12/2022MasonryBRIAN T. O'CONNORspecial
01/12/2022Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
01/09/2022FinalJAMES CORNEJOprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00659491-I1Request digital key ↗
08/24/2026Q00882924-I1Request digital key ↗
08/24/2026Q00882924-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/24/2018440497446Open ↗
▸BISWORK PERMIT APPLICATION1
07/24/2018440497446Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature13
08/29/2026Q00882924-I1Open ↗
08/27/2026Q01230044-I1Open ↗
08/27/2026Q01230044-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00659491-I1Open ↗
08/24/2026Q00882924-P1Open ↗
08/24/2026Q00882924-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00882924-I1Open ↗
08/27/2026Q01230044-I1Open ↗
08/27/2026Q01230044-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/24/2018440497446Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/24/2018440497446Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/24/2018440497446Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/07/2019440497446Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
07/24/2018440497446Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/24/2018440497446Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00659491-I1Open ↗
08/24/2026Q00882924-P1Open ↗
08/24/2026Q00882924-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2018440497446Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/24/2018440497446Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/23/2019440497446Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/23/2019440497446Open ↗
07/24/2018440497446Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/24/2018440497446Open ↗