← Back
Over six families without stores
47-01 49 STREET
QUEENS · BIN 4432155
💬 Discuss this project
1924Year Built
5Stories
C1Building Class
R6AZoning
230,000 sfGross Floor Area
390Units
LL97 CoveredRent Stabilized115 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: COSMOPOLITAN ASSOCIATES II, LLC · 95,195 sf lot · 2.42 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COSMOPOLITAN ASSOCIATES1404/09/2026
PHOENIX SUTTON STR INC703/22/2026
COSMOPOLITAN ASSOCIATES II LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.404/03/2025
SRS ARCHITECT, PC205/22/2023
ENTHINK ENGINEERS LLC106/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANIDO BASONAS CONST SVCGeneral Contractor407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor403/21/2026
GMAK PLMBG AND HEATNG LLCPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851404/03/2025
ANGELOS GEORGOPOULOS, P.C2955205/22/2023
SRS ARCHITECT, PC2434405/22/2023
Building Lifecycle
All (103)Filed (7)Permit Issued (8)Signed Off (4)Violation (60)Inspection (3)Objection (4)Special Inspection (17)
06/26/2026
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER
Q01057993-I1
06/26/2026
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER
Q01057993-S1
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/12/2026
Permit issued — Boiler Equipment
Q01057993-I1-BE
02/11/2026
Permit issued — Plumbing
Q01057993-S1-PL
04/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/03/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER
Q01057993-P2
04/03/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER
Q01057993-P1
12/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/31/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
12/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/31/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
12/30/2024
Violation issued (HPD, open)
A
12/25/2024
Violation issued (HPD, closed)
B
08/27/2024
Violation issued (HPD, closed)
B
08/07/2024
Violation issued (HPD, closed)
B
08/03/2024
Violation issued (HPD, open)
B
08/03/2024
Violation issued (HPD, closed)
B
08/03/2024
Violation issued (HPD, closed)
A
08/03/2024
Violation issued (HPD, open)
C
08/03/2024
Violation issued (HPD, closed)
A
08/03/2024
Violation issued (HPD, open)
C
07/30/2024
Violation issued (HPD, closed)
B
07/30/2024
Violation issued (HPD, closed)
C
07/30/2024
Violation issued (HPD, open)
C
07/22/2024
Permit issued — Plumbing
Q01057993-S1-PL
07/22/2024
Permit issued — Boiler Equipment
Q01057993-I1-BE
07/02/2024
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER
Q01057993-I1
07/02/2024
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER
Q01057993-S1
04/26/2024
Violation issued (HPD, closed)
C
04/26/2024
Violation issued (HPD, closed)
C
02/10/2024
Violation issued (HPD, closed)
C
02/10/2024
Violation issued (HPD, closed)
B
02/10/2024
Violation issued (HPD, closed)
C
06/20/2023
Signed off — Alteration
Exterior Facade Restoration as per plans. No change in use, egress or occupancy. Sidewalk Shed to be filed separately.
Q00538013-I1
06/14/2023
Special inspection requirement — Final
Silvia Schlaen
06/14/2023
Special inspection requirement — Chimneys and vents
Angelos Georgopoulos
06/14/2023
Special inspection requirement — Masonry
Silvia Schlaen
06/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Silvia Schlaen
06/09/2023
Objection resolved — Addressed
06/09/2023
Objection resolved — Addressed
06/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Silvia Schlaen
05/30/2023
Objection raised — Inspections
05/30/2023
Objection raised — Scope
05/22/2023
Filed — Alteration
Exterior Facade Restoration as per plans. No change in use, egress or occupancy. Sidewalk Shed to be filed separately.
Q00538013-P1
02/28/2023
Special inspection requirement — Final
Silvia Schlaen
02/28/2023
Special inspection requirement — Chimneys and vents
Angelos Georgopoulos
02/28/2023
Special inspection requirement — Masonry
Silvia Schlaen
10/26/2022
Signed off — Alteration
Q00540222-I1
06/22/2022
Permit issued — General Construction
Q00538013-I1-GC
06/14/2022
Permit issued — Sidewalk Shed
Q00540222-I1-SH
04/27/2022
Violation issued (HPD, closed)
A
03/11/2022
Violation issued (HPD, closed)
A
03/11/2022
Violation issued (HPD, closed)
A
03/11/2022
Violation issued (HPD, closed)
A
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offGMAK PLMBG AND HEATNG LLC02/12/2026
DOB NOWPlumbingSigned-offGMAK PLMBG AND HEATNG LLC02/11/2026
DOB NOWPlumbingSigned-offGMAK PLMBG AND HEATNG LLC07/22/2024
DOB NOWBoiler EquipmentSigned-offGMAK PLMBG AND HEATNG LLC07/22/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC06/22/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/14/2022
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC08/20/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/17/2021
BISFBISSUEDMETROPOLITAN HEAT AND POWER08/08/1994
BISPLISSUEDJ.H. LOEWY PLG INC08/08/1994
1 project · most recent 04/03/2025
Gas
FiledStatusContractorScope
04/03/2025Signed-offGMAK PLMBG AND HEATNG LLCGas
2 projects · most recent 08/26/2026
Boiler Controls
FiledStatusContractorScope
08/26/2026Permit IssuedGREY GOOSE ELECTRIC CORPBoiler Controls
06/14/2021Permit IssuedELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/04/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/31/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/31/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/31/2024Maintenance informationLOUIS ARENAenergy_progress
12/31/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/31/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/31/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/31/2024Heating SystemsLOUIS ARENAspecial
06/14/2023FinalSilvia Schlaenprogress
06/14/2023Chimneys and ventsAngelos Georgopoulosspecial
06/14/2023MasonrySilvia Schlaenspecial
06/14/2023Structural Stability – Alterations of existing buildingsSilvia Schlaenspecial
06/08/2023Structural Stability – Alterations of existing buildingsSilvia Schlaenspecial
02/28/2023FinalSilvia Schlaenprogress
02/28/2023Chimneys and ventsAngelos Georgopoulosspecial
02/28/2023MasonrySilvia Schlaenspecial
06/15/2021FinalSunil Saigalprogress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00540222-I1Request digital key ↗
08/27/2026Q00538013-I1Request digital key ↗
08/20/2026Q01057993-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q00538013-P1Open ↗
09/02/2026Q00538013-P1Open ↗
09/02/2026Q00538013-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00538013-I1Open ↗
08/27/2026Q00538013-P1Open ↗
08/20/2026Q01057993-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00538013-P1Open ↗
09/01/2026Q00538013-I1Open ↗
08/22/2026Q01057993-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026Q01057993-S1Open ↗
08/20/2026Q01057993-I1Open ↗
08/13/2026Q01057993-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026Q00538013-I1Open ↗
08/27/2026Q00538013-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/20/2026Q01057993-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00538013-I1Open ↗