← Back
Over six families without stores
47-25 48 STREET
QUEENS · BIN 4432161
💬 Discuss this project
1924Year Built
5Stories
C1Building Class
R6AZoning
138,000 sfGross Floor Area
234Units
LL97 CoveredRent Stabilized92 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: COSMOPOLITAN ASSOCIATES I, LLC · 57,155 sf lot · 2.41 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 17 docs
BulkheadUnder Construction1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COSMOPOLITAN ASSOCIATES2607/08/2026
PLATINUM SERVICES NY507/08/2026
CANIDO BASONAS CONST SVC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALTAGRACIA ESTHER MARTINEZ, R.A.108/28/2025
SRS ARCHITECT, PC305/01/2025
ARQUITECTURA VARELA110/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANIDO BASONAS CONST SVCGeneral Contractor704/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANGELOS GEORGOPOULOS, P.C2955205/01/2025
GEORGE J. XERAKIAS, PE1658205/01/2025
SRS ARCHITECT, PC2434305/01/2025
Building Lifecycle
All (91)Filed (6)Permit Issued (11)Signed Off (2)Violation (60)Special Inspection (12)
08/03/2026
Signed off — Alteration
Q00965974-I1
06/01/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01128333-I1
01/29/2026
Permit issued — Suspended Scaffold
Q00965974-I1-SC
11/17/2025
Permit issued — General Construction
Q00951032-I1-GC
11/03/2025
Permit issued — General Construction
Q00951032-I1-GC
10/14/2025
Permit issued — Sidewalk Shed
Q01128333-I1-SH
09/02/2025
Permit issued — Supported Scaffold
Q01278257-I1-SF
08/28/2025
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FAADE REPAIRS PER DRAWINGS ATTACHED HEREWITH.
Q01278257-I1
05/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Angelos Georgopoulos
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
05/22/2025
Special inspection requirement — Masonry
Silvia Schlaen
05/22/2025
Special inspection requirement — Final
Silvia Schlaen
05/01/2025
Filed — Alteration
Q00951032-P2
04/23/2025
Special inspection requirement — Masonry
Silvia Schlaen
04/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Angelos Georgopoulos
04/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
04/23/2025
Special inspection requirement — Final
Silvia Schlaen
02/18/2025
Permit issued — Suspended Scaffold
Q00965974-I1-SC
11/26/2024
Permit issued — Suspended Scaffold
Q00965974-I1-SC
11/19/2024
Permit issued — General Construction
Q00951032-I1-GC
11/08/2024
Violation issued (ECB, closed)
Construction
11/08/2024
Violation issued (ECB, closed)
Construction
10/17/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01128333-I1
10/17/2024
Permit issued — Sidewalk Shed
Q01128333-I1-SH
10/11/2024
Permit issued — General Construction
Q00951032-I1-GC
07/03/2024
Filed — Alteration
Q00951032-P1
07/02/2024
Special inspection requirement — Masonry
Silvia Schlaen
07/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Silvia Schlaen
07/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/02/2024
Special inspection requirement — Final
Silvia Schlaen
04/18/2024
Filed — Alteration
Q00951032-I1
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
B
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
B
12/05/2023
Permit issued — Suspended Scaffold
Q00965974-I1-SC
11/21/2023
Filed — Alteration
Q00965974-I1
06/07/2023
Violation issued (HPD, closed)
A
04/03/2023
Violation issued (HPD, closed)
B
03/27/2023
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
C
01/10/2023
Violation issued (HPD, closed)
C
12/02/2022
Violation issued (HPD, closed)
C
10/17/2022
Violation issued (HPD, closed)
C
10/17/2022
Violation issued (HPD, closed)
A
10/15/2022
Violation issued (HPD, closed)
A
10/15/2022
Violation issued (HPD, closed)
C
09/26/2022
Violation issued (ECB, closed)
Boilers
06/17/2022
Violation issued (HPD, closed)
A
06/17/2022
Violation issued (HPD, closed)
A
06/17/2022
Violation issued (HPD, closed)
C
11/29/2021
Violation issued (HPD, closed)
B
11/29/2021
Violation issued (HPD, closed)
A
02/10/2021
Violation issued (HPD, closed)
C
12/26/2019
Violation issued (HPD, closed)
C
02/21/2019
Violation issued (HPD, closed)
C
02/21/2019
Violation issued (HPD, closed)
C
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR01/29/2026
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC11/17/2025
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC11/03/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/14/2025
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONST SVC09/02/2025
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR02/18/2025
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR11/26/2024
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC11/19/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/17/2024
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC10/11/2024
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR12/05/2023
BISPLISSUEDSTEPHEN FOX P & H INC07/27/1999
BISFSISSUEDMARLANDE HEATING CORP07/27/1999
1 project · most recent 10/18/2024
FiledStatusContractorScope
10/18/2024CompleteRICHARD NEU—
2 projects · most recent 08/28/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/28/2025Permit IssuedCANIDO BASONAS CONST SVCScaffold
10/17/2024Signed-offPLATINUM SERVICES NY LLCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/22/2025Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
05/22/2025Tenant Protection Plan ComplianceGeorge Xerakiasspecial
05/22/2025MasonrySilvia Schlaenspecial
05/22/2025FinalSilvia Schlaenprogress
04/23/2025MasonrySilvia Schlaenspecial
04/23/2025Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
04/23/2025Tenant Protection Plan ComplianceGeorge Xerakiasspecial
04/23/2025FinalSilvia Schlaenprogress
07/02/2024MasonrySilvia Schlaenspecial
07/02/2024Structural Stability – Alterations of existing buildingsSilvia Schlaenspecial
07/02/2024Tenant Protection Plan Compliance—special
07/02/2024FinalSilvia Schlaenprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q00965974-I1Request digital key ↗
08/22/2026Q00951032-P1Request digital key ↗
08/22/2026Q00951032-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00951032-P1Open ↗
08/30/2026Q00951032-P2Open ↗
08/30/2026Q00951032-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026Q00951032-P1Open ↗
08/22/2026Q00951032-I1Open ↗
08/22/2026Q00951032-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00951032-P1Open ↗
08/30/2026Q00951032-P2Open ↗
08/28/2026Q00951032-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/22/2026Q00951032-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026Q00965974-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q00965974-I1Open ↗