← Back
One family attached or semi-detached
60-68 60 AVENUE
QUEENS · BIN 4432745
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R4-1Zoning
1,408 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR109/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281109/08/2026
Building Lifecycle
All (8)Filed (1)Special Inspection (7)
09/08/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ROOFTOP, RAILED, GRID-TIED, 9 MODULES, 3.69KW
Q01456994-I1
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/08/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
09/08/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
09/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
09/08/2026
Special inspection requirement — Final
Mina Makar
09/08/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Nothing on file for this building.
1 project · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026——18 panels, 7.38 kw, 158 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/08/2026Fire-Resistant Penetrations and JointsMina Makarspecial
09/08/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
09/08/2026Post-installed AnchorsMina Makarspecial
09/08/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
09/08/2026Energy Code Compliance InspectionsMina Makarprogress
09/08/2026FinalMina Makarprogress
09/08/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/23/2026Q01456994-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q01456994-I1Open ↗
09/23/2026Q01456994-I1Open ↗
09/23/2026Q01456994-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01456994-I1Open ↗
09/23/2026Q01456994-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/23/2026Q01456994-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/23/2026Q01456994-I1Open ↗