← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Rego Park Gardens Condominium
94-31 60 AVENUE · BIN 4433107
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R7BZoning
368,854 sfGross Floor Area
292Units
Rent Stabilized103 Open Violations 95 unresolved · 8 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: REGO PARK GARDENS CONDO · 84,912 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC1407/08/2026
REGO PARK GARDENS OWNERS INC2207/08/2026
REGO PARK GARDENS606/27/2026
REGO PARK GARDENS CONDO703/22/2026
CONSTRUCTION NEW AMERICAN103/22/2026
OWNER OF 94-30 59TH AVE103/22/2026
DOUGLAS ELLIMAN PROPERTY MANAGEM203/21/2026
REGO PARK OWNER INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS205/19/2026
RAS PE CONSULTING ENGINEERS201/02/2025
ENTHINK ENGINEERS LLC212/29/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMERICAN CONSTRUCTION INCGeneral Contractor1107/08/2026
MGR RESTRO INCGeneral Contractor507/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
DISCOVER.GREEN RENEWABLEGeneral Contractor206/27/2026
IRVING BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561205/19/2026
CG CONSULTING ENGINEERING6757101/02/2025
RI CONSULTING SERVICES IN8904201/02/2025
AA BUILDING & INSPECTION1519111/08/2021
Building Lifecycle
All (97)Filed (6)Permit Issued (11)Signed Off (2)Facade (FISP) (11)Violation (60)Objection (2)Special Inspection (5)
06/25/2026
Permit issued — Solar
Q01118263-I1-SL
06/19/2026
Violation issued (HPD, open)
C
06/19/2026
Violation issued (HPD, open)
A
06/19/2026
Violation issued (HPD, open)
C
06/19/2026
Violation issued (HPD, open)
A
06/19/2026
Violation issued (HPD, open)
C
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
05/20/2026
Special inspection requirement — Final
Malathi Ananthakrishnan
05/20/2026
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
05/19/2026
Filed — Alteration
Installation of 82.295 kw solar energy system on roof. No change of occupancy, use or egress.
Q01118263-P1
01/31/2026
Violation issued (HPD, closed)
C
01/31/2026
Violation issued (HPD, open)
C
01/27/2026
Permit issued — Solar
Q01118263-I1-SL
06/11/2025
Violation issued (HPD, closed)
A
06/10/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00427300-I1
05/29/2025
Signed off — Alteration
EMERGENCY FACADE REPAIR WORK INCLUDE BRICK REPOSITIONING, TO REPLACE CRACKED BRICK, TOREPLACE DETERIORATED WINDOW SILLS AND LINTELS. WORKS TO CORRECT THE UNSAFE CONDITIONSIDENTIFIED IN CYCLE-9 FISP.
Q00596222-I1
05/07/2025
Cycle 9 facade report submitted
05/07/2025
Cycle 9 facade report signed — SAFE
03/10/2025
Cycle 9 facade inspection completed
01/22/2025
Permit issued — General Construction
Q00596222-I1-GC
01/02/2025
Filed — Alteration
EMERGENCY FACADE REPAIR WORK INCLUDE BRICK REPOSITIONING, TO REPLACE CRACKED BRICK, TOREPLACE DETERIORATED WINDOW SILLS AND LINTELS. WORKS TO CORRECT THE UNSAFE CONDITIONSIDENTIFIED IN CYCLE-9 FISP.
Q00596222-P1
12/10/2024
Violation issued (HPD, open)
B
12/10/2024
Violation issued (HPD, closed)
C
12/10/2024
Violation issued (HPD, open)
C
12/10/2024
Violation issued (HPD, open)
C
12/10/2024
Violation issued (HPD, open)
C
12/10/2024
Violation issued (HPD, open)
B
12/10/2024
Violation issued (HPD, open)
B
12/10/2024
Violation issued (HPD, open)
C
11/22/2024
Permit issued — Solar
Q01118263-I1-SL
11/07/2024
Filed — Alteration
Installation of 82.295 kw solar energy system on roof. No change of occupancy, use or egress.
Q01118263-I1
09/25/2024
Permit issued — Sidewalk Shed
Q00427300-I1-SH
06/03/2024
Violation issued (HPD, open)
A
06/03/2024
Violation issued (HPD, open)
B
06/03/2024
Violation issued (HPD, closed)
C
05/14/2024
Violation issued (ECB, closed)
Unknown
05/06/2024
Violation issued (HPD, closed)
C
05/06/2024
Violation issued (HPD, closed)
C
05/06/2024
Violation issued (HPD, open)
B
03/22/2024
Violation issued (ECB, closed)
Unknown
01/16/2024
Violation issued (ECB, open)
Local Law
10/24/2023
Permit issued — Sidewalk Shed
Q00427300-I1-SH
06/30/2023
Violation issued (ECB, closed)
Elevators
06/09/2023
Violation issued (FDNY_NOV, closed)
03/30/2023
Permit issued — General Construction
Q00596222-I1-GC
03/28/2023
Violation issued (HPD, closed)
A
11/03/2022
Permit issued — Sidewalk Shed
Q00427300-I1-SH
10/27/2022
Violation issued (ECB, closed)
Construction
12/29/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00427300-P1
12/03/2021
Violation issued (ECB, closed)
Local Law
12/01/2021
Permit issued — General Construction
Q00596222-I1-GC
11/16/2021
Permit issued — Sidewalk Shed
Q00427300-I1-SH
11/15/2021
Objection raised — Other
11/15/2021
Objection resolved — Addressed
11/08/2021
Filed — Alteration
EMERGENCY FACADE REPAIR WORK INCLUDE BRICK REPOSITIONING, TO REPLACE CRACKED BRICK, TOREPLACE DETERIORATED WINDOW SILLS AND LINTELS. WORKS TO CORRECT THE UNSAFE CONDITIONSIDENTIFIED IN CYCLE-9 FISP.
Q00596222-I1
10/30/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/2021
Violation issued (ECB, closed)
Construction
04/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedDISCOVER.GREEN RENEWABLE06/25/2026
DOB NOWSolarPermit IssuedDISCOVER.GREEN RENEWABLE01/27/2026
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC01/22/2025
DOB NOWSolarPermit IssuedACCORD POWER INC11/22/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION09/25/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION10/24/2023
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC03/30/2023
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION11/03/2022
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC12/01/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION11/16/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION11/13/2020
BISOTISSUEDUNITED RESTORATION & DEV01/05/2015
BISOTISSUEDUNITED RESTORATION & DEV04/25/2014
BISEQISSUEDUNITED RESTORATION & DEV03/28/2014
BISEQISSUEDSAFE CONTRACTOR INC09/18/2003
BISOTISSUEDSAFE CONTRACTOR INC09/18/2003
BISFSISSUEDACE ATLAS CORP10/07/1993
BISFSISSUEDABILENE, INC07/30/1993
BISPLISSUEDBMC PLUMBING CORP.07/30/1993
BISOTISSUEDDUAL FUEL PLUMBING AND HEATING03/05/1993
3 projects · most recent 01/12/2026
FiledStatusContractorScope
01/12/2026CompleteFIRST CHOICE ELECTRICAL2 meters, 1 new_meters
11/18/2024CompleteACCORD POWER ELECTRIC LLC—
11/12/2020CompleteRICHARD NEU—
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026Permit IssuedDISCOVER.GREEN RENEWABLE151 panels, 82.29 kw, 12,174.95 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/20/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
05/20/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
05/20/2026Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
05/20/2026FinalMalathi Ananthakrishnanprogress
05/20/2026Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/27/2026Q00596222-P1Request digital key ↗
08/16/2026Q01118263-I1Request digital key ↗
08/16/2026Q01118263-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/27/2026Q00427300-P1Request digital key ↗
08/27/2026Q00427300-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
03/27/2014440135444Open ↗
11/16/2013420920052Open ↗
08/19/2011420461994Open ↗
▸BISWORK PERMIT APPLICATION3
01/22/2015420920052Open ↗
05/01/2014420920052Open ↗
03/27/2014440135444Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/28/2015420920052Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00427300-P1Open ↗
08/27/2026Q00427300-I1Open ↗
08/27/2026Q00596222-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/20/2015440135444Open ↗
10/20/2015440135444Open ↗
11/16/2013420920052Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01118263-I1Open ↗
08/25/2026Q01118263-I1Open ↗
08/25/2026Q01118263-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01118263-I1Open ↗
08/25/2026Q01118263-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/27/2014440135444Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/27/2014440135444Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/27/2014440135444Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026Q00427300-P1Open ↗
08/13/2026Q00427300-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01118263-I1Open ↗
08/16/2026Q01118263-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/19/2011420461994Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/16/2013420920052Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/16/2013420920052Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/27/2014440135444Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS2
11/16/2013420920052Open ↗
08/19/2011420461994Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/28/2015420920052Open ↗
10/20/2015440135444Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/27/2026Q00427300-P1Open ↗
08/27/2026Q00427300-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/28/2015420920052Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/18/2015420920052Open ↗
11/16/2013420920052Open ↗
08/19/2011420461994Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
11/16/2013420920052Open ↗
08/19/2011420461994Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/27/2014440135444Open ↗
▸BISADDITIONAL INFORMATION1
05/01/2014420920052Open ↗
▸Other Documents4
▸DOB NOWDHCR Document4
08/15/2026Q00596222-I1Open ↗
08/15/2026Q00596222-I1Open ↗
08/13/2026Q00596222-P1Open ↗
Showing 3 of 4 on file for this type