Elevator cooperative
Mitchell Gardens
26-10 UNION STREET · BIN 4433296
💬 Discuss this project
1957Year Built
6Stories
D4Building Class
R5Zoning
500,710 sfGross Floor Area
504Units
LL97 CoveredRent Stabilized66 Open Violations 43 unresolved · 23 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: MITCHELL GARDENS #3 COOPERATIVE · 431,000 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Bulkhead1p · 1 filing · 10 docs
Cellar7p · 1 filing · 19 docs
Nothing on file for this building.
Building Lifecycle
All (109)Filed (7)Permit Issued (17)Signed Off (1)Facade (FISP) (16)Violation (53)Inspection (6)Special Inspection (9)
07/27/2026
Special inspection requirement — Fenestration air leakage
Dane Barnes
07/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
07/27/2026
Special inspection requirement — Masonry
Dane Barnes
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
07/27/2026
Special inspection requirement — Final
Dane Barnes
07/27/2026
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
06/29/2026
Filed — Alteration
Repair/replace all facades to include masonry, pointing, lintels, sills, scrape and paint fire escapes
Q00480079-P1
05/19/2026
Cycle 10 facade inspection completed
01/21/2026
Violation issued (FDNY_NOV, closed)
12/08/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Permit issued — Plumbing
Q00975904-S1-PL
09/22/2025
Cycle 10 facade report submitted
08/16/2025
Violation issued (FDNY_NOV, closed)
08/16/2025
Violation issued (FDNY_NOV, closed)
08/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/10/2025
Permit issued — Boiler Equipment
Q00975904-S2-BE
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
02/18/2025
Filed — Alteration
Q00975904-P1
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2025
Violation issued (FDNY_NOV, closed)
01/14/2025
Permit issued — General Construction
Q00480079-I1-GC
12/30/2024
Permit issued — Plumbing
Q00975904-S1-PL
12/12/2024
Violation issued (ECB, open)
Construction
01/31/2024
Permit issued — Plumbing
Q00975904-S1-PL
01/25/2024
Permit issued — Boiler Equipment
Q00975904-S2-BE
01/16/2024
Filed — Alteration
Q00975904-S1
01/16/2024
Filed — Alteration
Q00975904-S2
01/12/2024
Permit issued — General Construction
Q00480079-I1-GC
01/04/2024
Permit issued — General Construction
Q00975904-I1-GC
12/26/2023
Filed — Alteration
Q00975904-I1
12/12/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
06/08/2023
Signed off — Alteration
Q00546045-I1
03/09/2023
Cycle 9 facade report signed — SAFE
02/02/2023
Permit issued — General Construction
Q00480079-I1-GC
12/29/2022
Cycle 9 facade report submitted
12/01/2022
Cycle 9 facade inspection completed
09/09/2022
Permit issued — General Construction
Q00480079-I1-GC
06/21/2022
Permit issued — Sidewalk Shed
Q00546045-I1-SH
02/15/2022
Cycle 9 facade report signed — UNSAFE
02/14/2022
Cycle 9 facade report submitted
02/14/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2022
Cycle 9 facade inspection completed
09/09/2021
Permit issued — General Construction
Q00480079-I1-GC
09/07/2021
Permit issued — General Construction
Q00480079-I1-GC
09/07/2021
Permit issued — General Construction
Q00480079-I1-GC
09/07/2021
Permit issued — General Construction
Q00480079-I1-GC
08/31/2021
Permit issued — General Construction
Q00480079-I1-GC
08/02/2021
Violation issued (ECB, open)
Local Law
06/30/2021
Filed — Alteration
Q00546045-I1
06/30/2021
Permit issued — Sidewalk Shed
Q00546045-I1-SH
03/30/2021
Filed — Alteration
Repair/replace all facades to include masonry, pointing, lintels, sills, scrape and paint fire escapes
Q00480079-I1
01/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/11/2019
Violation issued (ECB, open)
Local Law
01/31/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 109 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL109/13/2026
KINGS GROUP NY607/08/2026
MITCHELL GARDENS #3 COOPERATIVE603/22/2026
MITCHELL GARDENS # CO-103/22/2026
MITCHELL GARDENS SEC 3203/21/2026
MITCHELL GARDENS NO 3 COOP1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH K. BLUM CO. LLP206/29/2026
ROBERT GERMAIN JR. PE402/18/2025
SYED ENGINEERING, P.C.106/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D D EXPEDITORS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE BUILDERS GROUP LLGeneral Contractor2107/08/2026
KINGS GROUP NY CORPGeneral Contractor407/08/2026
CAM ENERGY HTG&MECH CORPPlumbing307/08/2026
CUOMO, FElectrical203/21/2026
KANHAI, ONEILElectrical203/21/2026
AGGRESSIVE HEATING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH K. BLUM CO. LLP1741206/29/2026
ROBERT F. GERMAIN JR. PE5100402/18/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP10/08/2025
DOB NOWBoiler EquipmentPermit IssuedRICHARD MORTMAN04/10/2025
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL01/14/2025
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP12/30/2024
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP01/31/2024
DOB NOWBoiler EquipmentPermit IssuedAGGRESSIVE HEATING INC01/25/2024
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL01/12/2024
DOB NOWGeneral ConstructionPermit IssuedAGGRESSIVE HEATING INC01/04/2024
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL02/02/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/09/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/21/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/09/2021
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/07/2021
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/07/2021
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/07/2021
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL08/31/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/30/2021
BISPLISSUEDALKLEM PLUMBING INC04/04/2006
BISSPISSUEDALKLEM PLUMBING INC.02/07/2005
BISOTISSUEDAPOGEE ENTERPRISED INC.04/18/2003
BISOTISSUEDJOE L MASONARY CONST08/18/1997
BISOTISSUEDJOE L. MASONARY CONSTRUCTION, IN08/01/1997
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/08/2025Fail-Final Boiler Equipment InspectionFailView ↗
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/27/2026Fenestration air leakageDane Barnesenergy_progress
07/27/2026Structural Stability – Alterations of existing buildingsDane Barnesspecial
07/27/2026MasonryDane Barnesspecial
07/27/2026Energy Code Compliance InspectionsDane Barnesprogress
07/27/2026FinalDane Barnesprogress
07/27/2026Air barrier - visual inspectionDane Barnesenergy_progress
02/25/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
02/13/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/12/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00480079-I1Request digital key ↗
08/27/2026Q00480079-P1Request digital key ↗
08/27/2026Q00546045-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00480079-P1Open ↗
08/27/2026Q00546045-I1Open ↗
08/20/2026Q00975904-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00480079-I1Open ↗
08/28/2026Q00975904-S1Open ↗
08/26/2026Q00975904-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q00480079-I1Open ↗
08/29/2026Q00480079-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026Q00480079-P1Open ↗
08/20/2026Q00975904-P3Open ↗
08/20/2026Q00975904-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/27/2026Q00480079-I1Open ↗