← Back
Two stories - detached, small or mid-size
211 BEACH 97 STREET
QUEENS · BIN 4435751
💬 Discuss this project
1901Year Built
3Stories
A1Building Class
R5BZoning
1,156 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.46 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Floor 37p · 2 filings · 20 docs
Floor 29p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THOMAS WARNKE 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT PROFFITT601/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAHREAM SUTTON403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MBJ CLEAN OUT INCGeneral Contractor203/21/2026
VOLTRON ELECTRIC LLCElectrical103/22/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT230501/13/2026
Building Lifecycle
All (55)Filed (6)Permit Issued (3)Violation (8)Inspection (4)Objection (16)Special Inspection (18)
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cloud Lee
01/26/2026
Special inspection requirement — Maintenance information
Robert Proffitt
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Robert Proffitt
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Proffitt
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Robert Proffitt
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Robert Proffitt
01/13/2026
Filed — Alteration
INSTALLATION OF BATHROOM FIXTURES AS INDICATED ON DRAWINGS. INSTALLATION OF PLUMBING FIXTURES IN KITCHEN AS INDICATED ON DRAWINGS. INSTALLATION OF HOT WATER HEATER AS INDICATED ON DRAWINGS.
Q00965768-P4
01/12/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/12/2026
Special inspection requirement — Maintenance information
Robert Proffitt
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cloud Lee
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Robert Proffitt
01/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Robert Proffitt
01/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Robert Proffitt
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Proffitt
12/28/2025
Objection resolved — Addressed
12/26/2025
Objection raised — Cost
12/15/2025
Filed — Alteration
INSTALLATION OF BATHROOM FIXTURES AS INDICATED ON DRAWINGS. INSTALLATION OF PLUMBING FIXTURES IN KITCHEN AS INDICATED ON DRAWINGS. INSTALLATION OF HOT WATER HEATER AS INDICATED ON DRAWINGS.
Q00965768-P3
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cloud Lee
12/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Proffitt
12/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Proffitt
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Proffitt
12/12/2025
Special inspection requirement — Maintenance information
Robert Proffitt
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Robert Proffitt
12/02/2025
Objection resolved — Addressed
11/29/2025
Objection raised — Admin
11/17/2025
Filed — Alteration
INSTALLATION OF BATHROOM FIXTURES AS INDICATED ON DRAWINGS. INSTALLATION OF PLUMBING FIXTURES IN KITCHEN AS INDICATED ON DRAWINGS. INSTALLATION OF HOT WATER HEATER AS INDICATED ON DRAWINGS.
Q00965768-P2
11/06/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2025
Permit issued — Plumbing
Q00965768-I1-PL
07/07/2025
Permit issued — General Construction
Q00737441-I1-GC
05/28/2025
Permit issued — General Construction
Q00737441-I1-GC
05/10/2024
Filed — Alteration
INSTALLATION OF BATHROOM FIXTURES AS INDICATED ON DRAWINGS. INSTALLATION OF PLUMBING FIXTURES IN KITCHEN AS INDICATED ON DRAWINGS. INSTALLATION OF HOT WATER HEATER AS INDICATED ON DRAWINGS.
Q00965768-P1
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
12/07/2023
Objection raised — Admin
12/07/2023
Objection raised — Inspections
12/07/2023
Objection raised — Inspections
12/07/2023
Objection raised — Scope
12/07/2023
Objection raised — Structural
12/07/2023
Objection raised — Inspections
12/03/2023
Filed — Alteration
INSTALLATION OF BATHROOM FIXTURES AS INDICATED ON DRAWINGS. INSTALLATION OF PLUMBING FIXTURES IN KITCHEN AS INDICATED ON DRAWINGS. INSTALLATION OF HOT WATER HEATER AS INDICATED ON DRAWINGS.
Q00965768-I1
02/10/2023
Filed — Alteration CO
Q00737441-I1
12/23/2022
Violation issued (ECB, closed)
Construction
03/13/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/06/2014
Violation issued (ECB, closed)
Unknown
10/02/2014
Violation issued (ECB, closed)
Unknown
08/27/2014
Violation issued (ECB, closed)
Unknown
06/20/2014
Violation issued (ECB, closed)
Unknown
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC08/14/2025
DOB NOWGeneral ConstructionPermit IssuedMBJ CLEAN OUT INC07/07/2025
DOB NOWGeneral ConstructionPermit IssuedMBJ CLEAN OUT INC05/28/2025
1 project · most recent 01/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/13/2026Signed-offGREGG NY PLUMBING, INCGas, Water/Sanitary
1 project · most recent 09/10/2025
General Wiring
FiledStatusContractorScope
09/10/2025Permit IssuedVOLTRON ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/12/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/26/2026Fire-Resistant Penetrations and JointsCloud Leespecial
01/26/2026Maintenance informationRobert Proffittenergy_progress
01/26/2026HVAC-R and service water heating system controlsRobert Proffittenergy_progress
01/26/2026HVAC-R and service water piping design and insulationRobert Proffittenergy_progress
01/26/2026HVAC-R and service water heating equipmentRobert Proffittenergy_progress
01/26/2026Energy Code Compliance InspectionsRobert Proffittprogress
01/12/2026Maintenance informationRobert Proffittenergy_progress
01/12/2026Fire-Resistant Penetrations and JointsCloud Leespecial
01/12/2026Energy Code Compliance InspectionsRobert Proffittprogress
01/12/2026HVAC-R and service water heating system controlsRobert Proffittenergy_progress
01/12/2026HVAC-R and service water heating equipmentRobert Proffittenergy_progress
01/12/2026HVAC-R and service water piping design and insulationRobert Proffittenergy_progress
12/12/2025Fire-Resistant Penetrations and JointsCloud Leespecial
12/12/2025HVAC-R and service water heating equipmentRobert Proffittenergy_progress
12/12/2025HVAC-R and service water heating system controlsRobert Proffittenergy_progress
12/12/2025HVAC-R and service water piping design and insulationRobert Proffittenergy_progress
12/12/2025Maintenance informationRobert Proffittenergy_progress
12/12/2025Energy Code Compliance InspectionsRobert Proffittprogress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00737441-I1Request digital key ↗
08/17/2026Q00965768-P2Request digital key ↗
08/17/2026Q00965768-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
12/28/2023420924478Open ↗
12/19/2023420924478Open ↗
11/25/2014420924478Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
02/03/2015420924478Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature15
08/27/2026Q00965768-I1Open ↗
08/27/2026Q00965768-I1Open ↗
08/27/2026Q00965768-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00737441-I1Open ↗
08/17/2026Q00965768-P3Open ↗
08/17/2026Q00965768-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026Q00965768-I1Open ↗
08/26/2026Q00965768-P3Open ↗
08/25/2026Q00965768-P4Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/15/2014420924478Open ↗
11/21/2013420924478Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
11/25/2014420924478Open ↗
11/21/2013420924478Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
11/21/2013420924478Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00737441-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/25/2026Q00737441-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00737441-I1Open ↗
08/17/2026Q00965768-P2Open ↗
08/17/2026Q00965768-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/21/2013420924478Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026Q00737441-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/15/2014420924478Open ↗
11/21/2013420924478Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
11/21/2013420924478Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/29/2014420924478Open ↗
11/21/2013420924478Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/21/2013420924478Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/25/2026Q00737441-I1Open ↗