← Back
Factory, light manufacturing
35-39 VERNON BOULEVARD
QUEENS · BIN 4436737
💬 Discuss this project
1941Year Built
2Stories
F5Building Class
R5Zoning
4,800 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Factory, light manufacturing · Owner of record: VERNON STUDIO LLC · 5,005 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 03/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/12/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin heating 57000 BTU / cooling 57500 BTU- Model #RXTA60TAAVJU 57,500 BTU · Vrf Outdoor ×1
1 job · most recent 03/12/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/12/2026——Storm, Water/Sanitary
1 job · most recent 03/12/2026
Concrete
FiledStatusContractorScope
03/12/2026——Concrete
Building Lifecycle
All (53)Filed (5)Violation (4)Objection (14)Special Inspection (30)
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
04/02/2026
Objection raised — Energy
04/02/2026
Objection raised — Energy
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/31/2026
Special inspection requirement — Maintenance information
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/12/2026
Filed — Alteration CO
Installation of mechanical equipment and related ductwork and piping for a proposed rear extension as per plans submitted herewith.
Q01112488-S3
03/12/2026
Filed — Alteration CO
Installation of mechanical equipment and related ductwork and piping for a proposed rear extension as per plans submitted herewith.
Q01112488-S4
02/26/2026
Filed — Alteration CO
Installation of mechanical equipment and related ductwork and piping for a proposed rear extension as per plans submitted herewith.
Q01112488-S1
02/26/2026
Filed — Alteration CO
Installation of mechanical equipment and related ductwork and piping for a proposed rear extension as per plans submitted herewith.
Q01112488-S2
02/13/2026
Special inspection requirement — Post-installed Anchors
02/13/2026
Special inspection requirement — Structural Cold-Formed Steel
02/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/13/2026
Special inspection requirement — Final
02/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/11/2026
Special inspection requirement — Energy Code Compliance Inspections
02/11/2026
Special inspection requirement — Mechanical Systems
02/11/2026
Special inspection requirement — Energy Code Compliance Inspections
02/11/2026
Special inspection requirement — Final
02/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/11/2026
Special inspection requirement — Shutoff dampers
02/11/2026
Special inspection requirement — Maintenance information
10/23/2025
Violation issued (ECB, closed)
Construction
05/07/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/13/2024
Objection raised — Zoning
11/27/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/20/2024
Special inspection requirement — Maintenance information
11/01/2024
Special inspection requirement — Exterior lighting power
11/01/2024
Special inspection requirement — Interior lighting power
11/01/2024
Special inspection requirement — Air barrier - visual inspection
11/01/2024
Special inspection requirement — Lighting controls
10/24/2024
Objection raised — Other
10/24/2024
Objection raised — Other
10/24/2024
Objection raised — Fire_Protection
10/24/2024
Objection raised — Zoning
10/17/2024
Filed — Alteration CO
Installation of mechanical equipment and related ductwork and piping for a proposed rear extension as per plans submitted herewith.
Q01112488-I1
09/30/2024
Special inspection requirement — Insulation placement and R values
09/30/2024
Special inspection requirement — Fenestration areas
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/30/2024
Special inspection requirement — Fenestration air leakage
09/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
09/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERNON STUDIO1403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2016$2.2M—Private party → VERNON STUDIO LLC$469/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TYLIN203/12/2026
CES ENGINEERING LLC202/26/2026
KTISMA ARCHITECTURE STUDIO PLLC110/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDBROOKLYN SOLARWORKS LLC03/14/2017
BISBLISSUEDEAST COAST MECHANICAL LLC12/24/1997
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/31/2026HVAC-R and service water heating equipment—energy_progress
03/31/2026Maintenance information—energy_progress
03/31/2026HVAC-R and service water heating system controls—energy_progress
03/31/2026HVAC-R and service water piping design and insulation—energy_progress
02/13/2026Post-installed Anchors—special
02/13/2026Structural Cold-Formed Steel—special
02/13/2026Structural Stability – Alterations of existing buildings—special
02/13/2026Final—progress
02/11/2026Fire-Resistant Penetrations and Joints—special
02/11/2026Energy Code Compliance Inspections—progress
02/11/2026Mechanical Systems—special
02/11/2026Energy Code Compliance Inspections—progress
02/11/2026Final—progress
02/11/2026HVAC-R and service water heating system controls—energy_progress
02/11/2026HVAC-R and service water piping design and insulation—energy_progress
02/11/2026HVAC-R and service water heating equipment—energy_progress
02/11/2026Shutoff dampers—energy_progress
02/11/2026Maintenance information—energy_progress
11/20/2024Maintenance information—energy_progress
11/01/2024Exterior lighting power—energy_progress
11/01/2024Interior lighting power—energy_progress
11/01/2024Air barrier - visual inspection—energy_progress
11/01/2024Lighting controls—energy_progress
09/30/2024Insulation placement and R values—energy_progress
09/30/2024Fenestration areas—energy_progress
Latest 25 of 30.
▾Documents — 25 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/08/2017440388901Open ↗
▸BISWORK PERMIT APPLICATION1
03/14/2017440388901Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01112488-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01112488-I1Open ↗
▸Seals & Professional Certifications1
▸BISAPPLICANT OWNER SIGNATURE1
03/08/2017440388901Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
03/08/2017440388901Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/08/2017440388901Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/06/2017440388901Open ↗
03/08/2017440388901Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/06/2017440388901Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/08/2017440388901Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
06/06/2017440388901Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/06/2017440388901Open ↗
03/08/2017440388901Open ↗
▸Approvals, Objections & Sign-offs3
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
06/06/2017440388901Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/08/2017440388901Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/06/2017440388901Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/06/2017440388901Open ↗
03/08/2017440388901Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/13/2017440388901Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/08/2017440388901Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram2
08/13/2026Q01112488-I1Open ↗
08/13/2026Q01112488-S4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01112488-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01112488-I1Open ↗