← Back
Parochial school, yeshiva
87-43 88 AVENUE
QUEENS · BIN 4438405
💬 Discuss this project
1915Year Built
2Stories
W2Building Class
R3-1Zoning
68,175 sfGross Floor Area
1Units
LL97 Covered3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Parochial school, yeshiva · 31,859 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof2p · 1 filing · 5 docs
Cellar1p · 1 filing · 4 docs
3 jobs · most recent 07/07/2023
Lighting
FiledStatusContractorScope
07/07/2023CompleteRICHARD NEU—
02/21/2020CompleteAMC ELEC'L SERVICES, INC.1 meters, 1 new_meters
04/10/2019CompleteSALVATORE CAMPISI & SONSLighting
Building Lifecycle
All (37)Filed (8)Permit Issued (6)Signed Off (6)Violation (6)Inspection (4)Special Inspection (7)
11/20/2024
Signed off — Alteration
Q00900037-I1
12/27/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00898476-I1
11/13/2023
Signed off — Alteration
Architectural changes to the roof as indicated on drawings.
Q00909661-I1
08/07/2023
Permit issued — General Construction
Q00909661-I1-GC
07/26/2023
Filed — Alteration
Architectural changes to the roof as indicated on drawings.
Q00909661-I1
07/25/2023
Special inspection requirement — Final
JIRI MARSIK
07/18/2023
Filed — Alteration
Q00900037-I1
07/18/2023
Permit issued — Supported Scaffold
Q00900037-I1-SF
07/10/2023
Permit issued — Sidewalk Shed
Q00898476-I1-SH
07/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00898476-I1
12/13/2022
Signed off — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER AND CONNECT TO NEW GAS BOILER AND EXISTING GAS BOILER.
Q00692025-I1
12/13/2022
Signed off — Alteration
Q00691975-I1
10/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/19/2022
Filed — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER AND CONNECT TO NEW GAS BOILER AND EXISTING GAS BOILER.
Q00692025-P1
10/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2022
Signed off — Alteration
Q00704902-I1
04/12/2022
Permit issued — General Construction
Q00704902-I1-GC
04/06/2022
Filed — Alteration
Q00704902-I1
03/25/2022
Permit issued — Boiler Equipment
Q00691975-I1-BE
03/25/2022
Permit issued — Plumbing
Q00692025-I1-PL
03/24/2022
Filed — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER AND CONNECT TO NEW GAS BOILER AND EXISTING GAS BOILER.
Q00692025-I1
03/24/2022
Filed — Alteration
Q00691975-I1
03/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/04/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
03/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/04/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/14/2018
Filed — No Work
Q00109136-I1
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/1989
Violation issued (ECB, closed)
Public Assembly
10/01/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET2207/08/2026
LEMX407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
ARCHETYPE CONSULTANTS203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
DIPROPERZIO MALLIA ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VDK RESTORATION INCGeneral Contractor303/21/2026
AMERICAN VENTILATION SERVGeneral Contractor203/21/2026
BONDEE ENTERPRISES INCPlumbing207/08/2026
LEMX CORPGeneral Contractor107/08/2026
VICTORIA CONSULTING & DEVGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851410/19/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offVDK RESTORATION INC08/07/2023
DOB NOWSupported ScaffoldSigned-offVICTORIA CONSULTING & DEV07/18/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP07/10/2023
DOB NOWGeneral ConstructionSigned-offAMERICAN VENTILATION SERV04/12/2022
DOB NOWBoiler EquipmentSigned-offBONDEE ENTERPRISES INC03/25/2022
DOB NOWPlumbingSigned-offBONDEE ENTERPRISES INC03/25/2022
BIS—ISSUEDFAZIO CONSTRUCTION GROUP01/15/2019
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/25/2023FinalJIRI MARSIKprogress
10/25/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/04/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/04/2022Heating SystemsLOUIS ARENAspecial
03/04/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/04/2022Maintenance informationLOUIS ARENAenergy_progress
03/04/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/26/2026Q00691975-I1Request digital key ↗
08/26/2026Q00704902-I1Request digital key ↗
08/25/2026Q00692025-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026Q00109136-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
03/06/2019421668010Open ↗
11/08/2018421668010Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/22/2019421668010Open ↗
▸BISWORK PERMIT APPLICATION1
01/18/2019421668010Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
04/07/2022421668010Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/07/2022421668010Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00109136-I1Open ↗
08/26/2026Q00691975-I1Open ↗
08/26/2026Q00704902-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026Q00691975-I1Open ↗
09/23/2026Q00691975-I1Open ↗
09/23/2026Q00691975-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/16/2019421668010Open ↗
11/08/2018421668010Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q00691975-I1Open ↗
08/24/2026Q00692025-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/08/2018421668010Open ↗
▸BISHEATING SYSTEMS1
04/07/2022421668010Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
11/08/2018421668010Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026Q00691975-I1Open ↗
08/24/2026Q00909661-I1Open ↗
08/13/2026Q00692025-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/05/2019421668010Open ↗
11/08/2018421668010Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026Q00704902-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/16/2019421668010Open ↗
11/08/2018421668010Open ↗
▸BISINTERIOR LIGHTING POWER1
04/07/2022421668010Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/07/2022421668010Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/07/2022421668010Open ↗
▸BISLIGHTING CONTROLS1
04/07/2022421668010Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00691975-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00691975-I1Open ↗
▸Inspections & Test Reports3
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/07/2022421668010Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/07/2022421668010Open ↗
▸BISMECHANICAL SYSTEMS1
04/07/2022421668010Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/28/2026Q00109136-I1Open ↗
08/26/2026Q00704902-I1Open ↗
08/25/2026Q00692025-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/05/2019421668010Open ↗
01/05/2019421668010Open ↗
11/08/2018421668010Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
01/08/2019421668010Open ↗
11/08/2018421668010Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
04/07/2022421668010Open ↗
▸BISCOST AFFIDAVIT1
11/08/2018421668010Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
06/17/2019421668010Open ↗
03/20/2019421668010Open ↗
01/05/2019421668010Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
11/08/2018421668010Open ↗
▸BISBOROUGH INTAKE FORM1
03/06/2019421668010Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
11/08/2018421668010Open ↗
▸DOB NOWAlternate Plan 11
08/28/2026Q00109136-I1Open ↗