← Back
Church, synagogue, chapel
731 CHURCH ROAD
QUEENS · BIN 4442157
💬 Discuss this project
1950Year Built
2Stories
M1Building Class
R3AZoning
10,753 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Church, synagogue, chapel · 15,000 sf lot · 0.72 FAR built · Flood zone AE
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIDERIS KEFALAS ENGINEERS PC112/21/2021
TPD ARCHITECTURE, PLLC101/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAZIO CONSTRUCTION GROUPGeneral Contractor407/08/2026
NYBS MECHANICAL LLCGeneral Contractor303/21/2026
D HANDY INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIDERIS KEFALAS ENGINEERS3434112/21/2021
Building Lifecycle
All (21)Filed (2)Permit Issued (4)Signed Off (2)Objection (2)Special Inspection (11)
11/14/2024
Signed off — Alteration
minor renovation to existing church
Q00448229-I1
07/23/2024
Permit issued — General Construction
Q00448229-I1-GC
07/25/2023
Permit issued — General Construction
Q00448229-I1-GC
12/01/2022
Signed off — Alteration
Herewith filing Mechanical work for Church. No change to use occupancy or egress.
Q00649251-I1
03/22/2022
Permit issued — Mechanical Systems
Q00649251-I1-MS
12/30/2021
Objection raised — Zoning
12/30/2021
Objection resolved — Addressed
12/21/2021
Filed — Alteration
Herewith filing Mechanical work for Church. No change to use occupancy or egress.
Q00649251-I1
12/16/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Chris Sideris
12/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
Chris Sideris
12/16/2021
Special inspection requirement — HVAC-R and service water heating equipment
Chris Sideris
12/16/2021
Special inspection requirement — Maintenance information
Chris Sideris
12/16/2021
Special inspection requirement — Mechanical Systems
Chris Sideris
12/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chris Sideris
12/16/2021
Special inspection requirement — Heating Systems
Chris Sideris
12/16/2021
Special inspection requirement — Final
Chris Sideris
03/10/2021
Permit issued — General Construction
Q00448229-I1-GC
01/15/2021
Filed — Alteration
minor renovation to existing church
Q00448229-I1
01/13/2021
Special inspection requirement — Insulation placement and R values
JOHN SEMIOLI
01/13/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
01/06/2021
Special inspection requirement — Final
JOHN SEMIOLI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFAZIO CONSTRUCTION GROUP07/23/2024
DOB NOWGeneral ConstructionSigned-offFAZIO CONSTRUCTION GROUP07/25/2023
DOB NOWMechanical SystemsPermit IssuedNYBS MECHANICAL LLC03/22/2022
DOB NOWGeneral ConstructionSigned-offD HANDY INC03/10/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/16/2021HVAC-R and service water piping design and insulationChris Siderisenergy_progress
12/16/2021HVAC-R and service water heating system controlsChris Siderisenergy_progress
12/16/2021HVAC-R and service water heating equipmentChris Siderisenergy_progress
12/16/2021Maintenance informationChris Siderisenergy_progress
12/16/2021Mechanical SystemsChris Siderisspecial
12/16/2021Fire-Resistant Penetrations and JointsChris Siderisspecial
12/16/2021Heating SystemsChris Siderisspecial
12/16/2021FinalChris Siderisprogress
01/13/2021Insulation placement and R valuesJOHN SEMIOLIenergy_progress
01/13/2021Energy Code Compliance InspectionsJOHN SEMIOLIprogress
01/06/2021FinalJOHN SEMIOLIprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St.virgilius Rc ChurchOtherFloor 1, Roof
Project Q00448229 Alteration · LOC Issued · 01/15/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch1
08/15/2026Q00649251-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00448229-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q00649251-I1Open ↗
08/31/2026Q00649251-I1Open ↗
08/23/2026Q00448229-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00448229-I1Open ↗
08/26/2026Q00649251-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q00649251-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026Q00448229-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q00649251-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00448229-I1Open ↗
08/13/2026Q00649251-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026Q00448229-I1Open ↗
08/13/2026Q00649251-I1Open ↗