Elevator cooperative
43-34 UNION STREET
QUEENS · BIN 4443490
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R7-1Zoning
135,353 sfGross Floor Area
141Units
LL97 CoveredRent Stabilized23 Open Violations 21 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: KISSENA COOPERATIVE SECTION I · 53,263 sf lot · 2.54 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 2 filings · 8 docs
Floor 6Under Construction6p · 1 filing · 5 docs
Floor 5Under Construction6p · 1 filing · 5 docs
Floor 4Under Construction6p · 1 filing · 5 docs
Floor 3Under Construction6p · 1 filing · 5 docs
Floor 2Under Construction6p · 1 filing · 5 docs
Floor 1Under Construction6p · 1 filing · 5 docs
CellarUnder Construction7p · 2 filings · 20 docs
1 job · most recent 06/03/2025
Gas
FiledStatusContractorScope
06/03/2025Permit IssuedCAM ENERGY HTG&MECH CORPGas
3 jobs · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026Permit IssuedRICHARD NEU—
08/21/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
06/27/2018CompleteJUBILEE ELEC'L SERVICE COGeneral Wiring
1 job · most recent 07/24/2026
Sidewalk Shed
FiledStatusContractorScope
07/24/2026Permit IssuedPROFESSIONAL LINE CORPSidewalk Shed
1 job · most recent 04/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/03/2026Permit IssuedRSG CONSTRUCTION CORPSuspended Scaffold (SC)
Building Lifecycle
All (124)Filed (7)Permit Issued (9)Facade (FISP) (12)Violation (60)Inspection (19)Objection (4)Special Inspection (13)
09/28/2026
Permit issued — Plumbing
Q01456019-S1-PL
09/25/2026
Permit issued — Boiler Equipment
Q01456019-I1-BE
08/07/2026
Permit issued — General Construction
Q01300626-I1-GC
07/27/2026
Permit issued — Sidewalk Shed
Q01430417-I1-SH
07/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01430417-I1
07/22/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01300626-P1
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
07/21/2026
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
07/21/2026
Special inspection requirement — Final
Yakov Weinstein
05/08/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/10/2026
Permit issued — Suspended Scaffold
Q01379860-I1-SC
04/03/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR THE FACADE RESTORATION WORK AND INSPECTION AT 43-34 UNION STREET, QUEENS, NY 11355
Q01379860-I1
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/26/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2026
Objection raised — Scope
02/11/2026
Objection raised — Scope
01/23/2026
Permit issued — Plumbing
Q01219772-S1-PL
01/23/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/15/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01300626-I1
01/13/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/17/2025
Violation issued (HPD, closed)
C
11/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
06/10/2025
Permit issued — Boiler Equipment
Q01219772-S2-BE
06/10/2025
Permit issued — General Construction
Q01219772-I1-GC
06/10/2025
Permit issued — Plumbing
Q01219772-S1-PL
06/03/2025
Filed — Alteration
NEW CHIMNEY LINER. LEGALLY ABANDON 15,000 GALLON BURIED OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q01219772-I1
06/03/2025
Filed — Alteration
NEW CHIMNEY LINER. LEGALLY ABANDON 15,000 GALLON BURIED OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q01219772-S2
06/03/2025
Filed — Alteration
NEW CHIMNEY LINER. LEGALLY ABANDON 15,000 GALLON BURIED OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q01219772-S1
06/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
06/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
05/02/2025
Special inspection requirement — Final
Robert Germain Jr.
05/02/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
02/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/22/2024
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
05/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2022
Cycle 9 facade report signed — SWARMP
03/14/2022
Cycle 9 facade report submitted
01/21/2022
Cycle 9 facade inspection completed
05/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 124 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL209/12/2026
KISSENA COOP SECTION I303/22/2026
KISSENA COOP SECTION 1203/22/2026
KISSONA COOP SECT 1 INC103/22/2026
KISSENA COOP. SEC #1 INC203/22/2026
KISSENA COOPERATIVE APART203/22/2026
KISSENA COOP APT INC SECT103/22/2026
KISSENA COOP APARTMENTS I103/22/2026
KISSENA COOPERATIVE SECTI103/22/2026
KISSENA CO-OP INC/COOPER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP107/24/2026
SW ENGINEERING COMPANY207/22/2026
ROBERT GERMAIN JR. PE306/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HTG SERVICES, INCPlumbing209/29/2026
THE METRO GROUP PLBG LLCPlumbing207/08/2026
AXIS RESTORATION CORPGeneral Contractor109/07/2026
PROFESSIONAL LINE CORPGeneral Contractor107/28/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
CAM ENERGY HTG&MECH CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912207/22/2026
ROBERT F. GERMAIN JR. PE5100306/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA & C HTG SERVICES, INC09/28/2026
DOB NOWBoiler EquipmentPermit IssuedA & C HTG SERVICES, INC09/25/2026
DOB NOWGeneral ConstructionPermit IssuedAXIS RESTORATION CORP08/07/2026
DOB NOWSidewalk ShedPermit IssuedPROFESSIONAL LINE CORP07/27/2026
DOB NOWSuspended ScaffoldPermit IssuedRSG CONSTRUCTION CORP04/10/2026
DOB NOWPlumbingPermit IssuedCAM ENERGY HTG&MECH CORP01/23/2026
DOB NOWBoiler EquipmentPermit IssuedTHE METRO GROUP PLBG LLC06/10/2025
DOB NOWGeneral ConstructionPermit IssuedTHE METRO GROUP, INC06/10/2025
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC06/10/2025
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
05/08/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/13/2026Fail-Final Boiler Equipment InspectionFailView ↗
11/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
02/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/22/2024Fail-Final PL - More than 10 Requested FloorsFailView ↗
05/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
07/21/2026MasonryJOSHUA LUCKRITZspecial
07/21/2026FinalYakov Weinsteinprogress
06/03/2025HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
06/03/2025HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
06/03/2025HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
05/28/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
05/28/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
05/02/2025FinalRobert Germain Jr.progress
05/02/2025Chimneys and ventsRobert Germain Jr.special
05/02/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
05/02/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026Q01219772-S1Request digital key ↗
08/20/2026Q01219772-S2Request digital key ↗
08/20/2026Q01219772-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01219772-S2Open ↗
08/20/2026Q01219772-S1Open ↗
08/20/2026Q01219772-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/25/2026Q01219772-I1Open ↗
09/25/2026Q01219772-I1Open ↗
09/25/2026Q01219772-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/25/2026Q01219772-I1Open ↗
09/23/2026Q01219772-S2Open ↗
09/23/2026Q01219772-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01219772-S2Open ↗
08/20/2026Q01219772-S1Open ↗
08/20/2026Q01219772-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026Q01300626-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/17/2026Q01379860-I1Open ↗
▸DOB NOWCalculations1
08/17/2026Q01379860-I1Open ↗