← Back
Condo, residential unit in walk-up building
19-35 80 STREET
QUEENS · Astoria (North)-Ditmars-Steinway · BIN 4444711
💬 Discuss this project
0Year Built
—Stories
R2Building Class
R4Zoning
25,400 sfGross Floor Area
34Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · 49,069 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Mechanical
Permit Issued — active, not yet Signed-off
Floor 22p · 1 filing · 6 docs
Floor 1Under Construction1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL CHRISTAKOS ARCHITECTURE205/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEREBUZZA CONSTRUCTION INGeneral Contractor105/29/2026
MANKA CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL CHRISTAKOS ARCHITECT5894205/19/2026
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Violation (2)Special Inspection (13)
05/27/2026
Permit issued — Mechanical Systems
Q01403397-I1-GC-CX
05/19/2026
Filed — Alteration
NEW THREE(3) AC UNITS IN APARTMENT 1 AND ONE OUTDOOR CONDENSER IN OPEN SPACE AND NEW INSULATION ON EXTERIOR WALLS. NO CHANGE TO OCCUPANCY, USE, OR EGRESS
Q01403397-I1
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Christakos
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Christakos
05/19/2026
Special inspection requirement — Insulation placement and R values
Paul Christakos
05/19/2026
Special inspection requirement — Maintenance information
Paul Christakos
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Christakos
05/17/2026
Special inspection requirement — Mechanical Systems
Paul Christakos
05/17/2026
Special inspection requirement — Final
Paul Christakos
12/23/2025
Permit issued — Mechanical Systems
Q01316555-I1-MS
11/26/2025
Filed — Alteration
NEW THREE(3) AC UNITS IN APARTMENT 1 AND ONE OUTDOOR CONDENSER IN OPEN SPACE. NO CHANGE TO OCCUPANCY, USE, OR EGRESS
Q01316555-I1
11/24/2025
Special inspection requirement — Maintenance information
Paul Christakos
11/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Paul Christakos
11/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Christakos
11/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Christakos
11/10/2025
Special inspection requirement — Final
Paul Christakos
11/10/2025
Special inspection requirement — Mechanical Systems
Paul Christakos
05/13/2018
Violation issued (HPD, closed)
B
05/13/2018
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedGEREBUZZA CONSTRUCTION IN05/27/2026
DOB NOWMechanical SystemsPermit IssuedMANKA CONSTRUCTION12/23/2025
2 projects · most recent 05/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2026Permit IssuedGEREBUZZA CONSTRUCTION INAir Conditioning Systems
Cooling
Gree MUL36HP230V1R32A0 3 tons · Condensing Unit ×1
11/26/2025Permit IssuedMANKA CONSTRUCTION INCAir Conditioning Systems
Cooling
Gree GREE Comfort, Model No. MUL36HP230V1R32A0 3 tons · Condensing Unit ×1
1 project · most recent 02/20/2026
General Wiring
FiledStatusContractorScope
02/20/2026CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/19/2026HVAC-R and service water piping design and insulationPaul Christakosenergy_progress
05/19/2026HVAC-R and service water heating system controlsPaul Christakosenergy_progress
05/19/2026Insulation placement and R valuesPaul Christakosenergy_progress
05/19/2026Maintenance informationPaul Christakosenergy_progress
05/19/2026HVAC-R and service water heating equipmentPaul Christakosenergy_progress
05/17/2026Mechanical SystemsPaul Christakosspecial
05/17/2026FinalPaul Christakosprogress
11/24/2025Maintenance informationPaul Christakosenergy_progress
11/24/2025HVAC-R and service water heating equipmentPaul Christakosenergy_progress
11/24/2025HVAC-R and service water piping design and insulationPaul Christakosenergy_progress
11/24/2025HVAC-R and service water heating system controlsPaul Christakosenergy_progress
11/10/2025FinalPaul Christakosprogress
11/10/2025Mechanical SystemsPaul Christakosspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01316555-I1Request digital key ↗
08/16/2026Q01403397-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q01316555-I1Open ↗
09/23/2026Q01316555-I1Open ↗
09/01/2026Q01403397-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01316555-I1Open ↗
08/16/2026Q01403397-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01316555-I1Open ↗
09/01/2026Q01403397-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026Q01316555-I1Open ↗
08/16/2026Q01403397-I1Open ↗