143-43 BARCLAY AVENUE
BIN 4449226
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
6 Open Violations ▸FDNY Report ↗
Locations of Work
Plumbing
Cellar3p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARCLAY CONDO INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHI F. LAU ARCHITECT, P.C.307/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHI FAI LAU, RA2802307/19/2022
Building Lifecycle
All (29)Filed (3)Permit Issued (1)Signed Off (1)Violation (14)Inspection (4)Objection (2)Special Inspection (4)
05/07/2026
Violation issued (HPD, open)
A
06/12/2025
Violation issued (HPD, open)
A
03/29/2023
Violation issued (HPD, closed)
A
01/12/2023
Signed off — Alteration
PROPOSE TO FILE PLUMBING APPLICATION TO RE-INSTALL GAS LINE FROM THE METERS TO THE EXISTING HOT WATER HEATERS, BOILERS & DRYER IN CELLAR LEVEL TO SUPERSEDE THE LAA PERMIT #Q00433709. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00683687-I1
12/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI FAI LAU
07/25/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI FAI LAU
07/19/2022
Filed — Alteration
PROPOSE TO FILE PLUMBING APPLICATION TO RE-INSTALL GAS LINE FROM THE METERS TO THE EXISTING HOT WATER HEATERS, BOILERS & DRYER IN CELLAR LEVEL TO SUPERSEDE THE LAA PERMIT #Q00433709. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00683687-P2
07/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI FAI LAU
07/11/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI FAI LAU
06/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/14/2022
Filed — Alteration
PROPOSE TO FILE PLUMBING APPLICATION TO RE-INSTALL GAS LINE FROM THE METERS TO THE EXISTING HOT WATER HEATERS, BOILERS & DRYER IN CELLAR LEVEL TO SUPERSEDE THE LAA PERMIT #Q00433709. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00683687-P1
04/07/2022
Permit issued — Plumbing
Q00683687-I1-PL
03/03/2022
Objection raised — Scope
03/03/2022
Objection resolved — Addressed
02/28/2022
Filed — Alteration
PROPOSE TO FILE PLUMBING APPLICATION TO RE-INSTALL GAS LINE FROM THE METERS TO THE EXISTING HOT WATER HEATERS, BOILERS & DRYER IN CELLAR LEVEL TO SUPERSEDE THE LAA PERMIT #Q00433709. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00683687-I1
04/15/2021
Violation issued (HPD, closed)
A
11/11/2020
Violation issued (HPD, closed)
C
11/11/2020
Violation issued (HPD, open)
A
11/11/2020
Violation issued (HPD, open)
A
11/11/2020
Violation issued (HPD, open)
A
11/11/2020
Violation issued (HPD, open)
A
10/24/2018
Violation issued (HPD, closed)
I
12/05/2017
Violation issued (HPD, closed)
I
11/21/2016
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
02/27/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC04/07/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/25/2022Fire-Resistant Penetrations and JointsCHI FAI LAUspecial
07/25/2022Energy Code Compliance InspectionsCHI FAI LAUprogress
07/11/2022Fire-Resistant Penetrations and JointsCHI FAI LAUspecial
07/11/2022Energy Code Compliance InspectionsCHI FAI LAUprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00683687-P2Request digital key ↗
08/26/2026Q00683687-P1Request digital key ↗
08/14/2026Q00683687-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00683687-I1Open ↗
08/13/2026Q00683687-P2Open ↗
08/13/2026Q00683687-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00683687-P2Open ↗
08/23/2026Q00683687-P1Open ↗
08/22/2026Q00683687-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00683687-P2Open ↗
08/23/2026Q00683687-P1Open ↗
08/22/2026Q00683687-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00683687-P1Open ↗
08/14/2026Q00683687-I1Open ↗
08/13/2026Q00683687-P2Open ↗