← Back
Elevator cooperative
Mitchell Gardens #2
26-20 WHITESTONE EP SR W · BIN 4449845
💬 Discuss this project
1952Year Built
6Stories
D4Building Class
R5Zoning
260,961 sfGross Floor Area
252Units
LL97 CoveredRent Stabilized27 Open Violations 25 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: MITCHELL GARDENS #2 COOP CORP · 267,348 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
Architecture
Floor 65p · 1 filing · 5 docs
Floor 55p · 1 filing · 5 docs
Floor 45p · 1 filing · 5 docs
Floor 35p · 1 filing · 5 docs
Floor 25p · 1 filing · 5 docs
Floor 15p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S S LINCOLN CONSTRUCTION707/08/2026
GSR CONTRACTOR607/08/2026
SKILL CONSTRUCTION503/22/2026
MITCHELL GARDEN COOP #2803/22/2026
MITCHELL GARDENS #2 CO-OP CORP.403/22/2026
MITCHELL GARDEN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.109/11/2024
MJE PROFESSIONAL SERVICES109/04/2024
ASR ENGINEERING PC111/13/2022
ASHRAF CORP109/07/2021
GREEN DESIGN107/31/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATLANTIC BUILDING SUPPLY INC.203/21/2026
KD DESIGNS103/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
S S LINCOLN CONSTRUCTION203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSR CONTRACTOR INCGeneral Contractor407/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor207/08/2026
SKILL CONSTRUCTION CORPGeneral Contractor203/21/2026
S.S. LINCOLN CONSTRUCTIONGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488109/11/2024
Building Lifecycle
All (45)Filed (5)Permit Issued (7)Signed Off (2)Facade (FISP) (9)Violation (22)
11/21/2025
Violation issued (HPD, closed)
I
10/11/2025
Violation issued (FDNY_NOV, closed)
06/12/2025
Violation issued (HPD, closed)
A
01/10/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01104645-I1
09/16/2024
Permit issued — General Construction
Q01104630-I1-GC
09/11/2024
Filed — Alteration
Q01104630-I1
09/05/2024
Permit issued — Sidewalk Shed
Q01104645-I1-SH
09/04/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01104645-I1
07/12/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00202601-I1
06/15/2023
Permit issued — Supported Scaffold
Q08036169-I1-SF
03/30/2023
Violation issued (HPD, closed)
A
02/10/2023
Cycle 9 facade report submitted
02/10/2023
Cycle 9 facade report signed — SWARMP
02/06/2023
Cycle 9 facade inspection completed
11/16/2022
Permit issued — Supported Scaffold
Q08036169-I1-SF
11/13/2022
Filed — Alteration
Q08036169-I1
04/12/2022
Permit issued — Sidewalk Shed
Q00202601-I1-SH
09/15/2021
Permit issued — General Construction
Q00582121-I1-GC
09/07/2021
Filed — Alteration
REMOVE AND REPLACE EXISTING WINDOW LINTELS & SILLS AND CRACKED BRICKS, AND GRINDING & POINTING WHERE NEEDED AS PER PLANS ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATIOS
Q00582121-I1
08/02/2019
Permit issued — Sidewalk Shed
Q00202601-I1-SH
07/31/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00202601-I1
12/26/2018
Cycle 8 facade report submitted
11/15/2018
Cycle 8 facade report signed — SWARMP
11/09/2018
Cycle 8 facade inspection completed
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2014
Cycle 7 facade report submitted
11/14/2014
Cycle 7 facade report signed — SAFE
10/02/2014
Cycle 7 facade inspection completed
10/01/2014
Violation issued (HPD, closed)
A
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2011
Violation issued (ECB, closed)
Cranes and Derricks
05/26/2011
Violation issued (ECB, closed)
Cranes and Derricks
05/26/2011
Violation issued (ECB, closed)
Cranes and Derricks
01/02/2007
Violation issued (ECB, closed)
Elevators
01/02/2007
Violation issued (ECB, closed)
Elevators
05/27/2005
Violation issued (ECB, closed)
Elevators
10/26/2004
Violation issued (ECB, closed)
Boilers
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedS.S. LINCOLN CONSTRUCTION09/16/2024
DOB NOWSidewalk ShedSigned-offS.S. LINCOLN CONSTRUCTION09/05/2024
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC06/15/2023
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC11/16/2022
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC04/12/2022
DOB NOWGeneral ConstructionPermit IssuedSKILL CONSTRUCTION CORP09/15/2021
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC08/02/2019
BISOTISSUEDSKILL CONSTRUCTION CORP06/29/2022
BISOTISSUEDSKILL CONSTRUCTION CORP05/20/2022
BISPLISSUEDMURRAY HILL PLBG & HTG IN02/21/2014
BISPLISSUEDMURRAY HILL PLBG & HTG IN12/14/2012
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD03/03/2011
BISFBISSUEDABILENE, INC08/28/1997
BISPLISSUEDBELL FUEL OIL, LLC08/28/1997
2 projects · most recent 10/01/2024
FiledStatusContractorScope
10/01/2024CompleteRICHARD NEU—
07/31/2019Permit IssuedRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/30/2024MasonryFAZAL BANGASHspecial
08/30/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
08/30/2024FinalFAZAL BANGASHprogress
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/27/2026Q00582121-I1Request digital key ↗
08/25/2026Q08036169-I1Request digital key ↗
08/21/2026Q01104645-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00202601-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
09/14/2021421918223Open ↗
05/27/2021421918223Open ↗
08/12/2019421918223Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION4
05/20/2022421918223Open ↗
12/18/2012420785742Open ↗
05/10/2011420303852Open ↗
Showing 3 of 4 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
04/21/2022421918223Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
05/20/2022421918223Open ↗
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/06/2019421918223Open ↗
06/11/2019421918223Open ↗
02/27/2014420303852Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00202601-I1Open ↗
08/25/2026Q08036169-I1Open ↗
08/21/2026Q01104630-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/11/2012420785742Open ↗
03/03/2011420328130Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/11/2012420785742Open ↗
03/03/2011420328130Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q01104630-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q01104630-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
06/12/2014420785742Open ↗
▸BISSCHEDULE B - PLUMBING1
12/11/2012420785742Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
12/11/2012420785742Open ↗
▸BISTenant Protection Plan and Notes1
06/11/2019421918223Open ↗
▸DOB NOWTenant Protection Plan1
08/28/2026Q00202601-I1Open ↗
▸Environmental & Asbestos7
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
12/11/2012420785742Open ↗
12/11/2012420785742Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01104630-I1Open ↗
08/13/2026Q00582121-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/03/2011420328130Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/21/2022421918223Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/07/2011420303852Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/18/2023421918223Open ↗
05/26/2021421918223Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/21/2022421918223Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/11/2019421918223Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/18/2023421918223Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/18/2023421918223Open ↗
08/18/2023421918223Open ↗
05/18/2022421918223Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
04/21/2022421918223Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
05/18/2022421918223Open ↗
▸BISMASONRY1
04/21/2022421918223Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS3
12/11/2012420785742Open ↗
03/03/2011420328130Open ↗
01/07/2011420303852Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/21/2023421918223Open ↗
10/17/2013420328130Open ↗
03/06/2014420303852Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/06/2014420303852Open ↗
10/17/2013420328130Open ↗
▸BISFINAL1
04/21/2022421918223Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
08/18/2023421918223Open ↗
10/26/2021421918223Open ↗
06/11/2019421918223Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
06/11/2019421918223Open ↗
12/11/2012420785742Open ↗
03/03/2011420328130Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
10/26/2021421918223Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/28/2026Q00202601-I1Open ↗