Predominantly retail with other uses
135-20 40 ROAD
QUEENS · BIN 4449969
💬 Discuss this project
1993Year Built
3Stories
K4Building Class
C4-2Zoning
7,267 sfGross Floor Area
4Units
Rent Stabilized13 Open Violations 8 unresolved · 5 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: ASIA PLAZA CORP · 2,370 sf lot · 3.07 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 35p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORION DEVELOPMENT1007/08/2026
ASIA PLAZA4904/09/2026
ASIA PLACE CORP103/22/2026
AISA PLAZA CORP103/22/2026
STORE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOU GAO509/10/2025
DINGS ENGINEERING P.C.105/08/2025
KZ ENGINEERING, P.C105/07/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO1003/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
DINGS ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor707/08/2026
T & T CONST GROUP INCGeneral Contractor303/21/2026
TOP 8 CONSTRUCTION CORPGeneral Contractor203/21/2026
R & T ELECTRICAL CORPElectrical103/22/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407509/10/2025
DINGS ENGINEERING PC2051105/08/2025
Building Lifecycle
All (99)Filed (7)Permit Issued (7)Signed Off (4)Violation (60)Inspection (6)Special Inspection (15)
12/22/2025
Violation issued (ECB, open)
Construction
10/28/2025
Signed off — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-S1
10/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/10/2025
Filed — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-P4
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
09/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
09/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2025
Filed — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-P3
08/15/2025
Signed off — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-I1
08/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/11/2025
Special inspection requirement — Lighting in dwelling units
You Gao
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
You Gao
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
08/08/2025
Filed — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-P2
08/08/2025
Special inspection requirement — Lighting in dwelling units
You Gao
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
08/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
You Gao
07/25/2025
Signed off — Alteration
Minor interior renovation of existing eating and drinking establishment: To install a no-bearing partitions and two doors. No change of use, egress, bulk, and number of persons per existing CO#Q400206353.
Q01220666-I1
07/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/11/2025
Violation issued (HPD, closed)
A
05/15/2025
Permit issued — General Construction
Q01220666-I1-GC
05/08/2025
Filed — Alteration
Minor interior renovation of existing eating and drinking establishment: To install a no-bearing partitions and two doors. No change of use, egress, bulk, and number of persons per existing CO#Q400206353.
Q01220666-I1
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
02/21/2025
Permit issued — Plumbing
Q01179047-S1-PL
02/21/2025
Permit issued — General Construction
Q01179047-I1-GC
02/11/2025
Filed — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-S1
02/11/2025
Filed — Alteration
REMOVE ECB VIOLATION #34995063R & 35299057H, AND PROPOSE PLUMBING WORK ON MEZ., 2ND AND 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01179047-I1
07/30/2024
Violation issued (ECB, closed)
Construction
07/18/2024
Violation issued (FDNY_ORDER, closed)
07/18/2024
Violation issued (FDNY_ORDER, closed)
07/18/2024
Violation issued (FDNY_ORDER, closed)
07/18/2024
Violation issued (FDNY_ORDER, closed)
07/18/2024
Violation issued (FDNY_ORDER, closed)
04/12/2024
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
A
09/25/2020
Violation issued (ECB, closed)
Elevators
05/08/2019
Signed off — Alteration
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q00039850-I1
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2019
Permit issued — Sidewalk Shed
Q00039850-I1-SF
03/19/2019
Permit issued — Supported Scaffold
Q00039850-I1-SH
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/16/2019
Violation issued (ECB, closed)
Construction
01/14/2019
Violation issued (ECB, closed)
Construction
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2018
Violation issued (ECB, closed)
Construction
11/29/2018
Violation issued (ECB, closed)
Construction
11/29/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offT & T CONST GROUP INC05/15/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC02/21/2025
DOB NOWGeneral ConstructionSigned-offTOP 8 CONSTRUCTION CORP02/21/2025
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP03/19/2019
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP03/19/2019
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP05/08/2018
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP05/08/2018
BISOTISSUEDORION DEVELOPMENT INC06/13/2018
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC07/31/2017
BISEQISSUEDHAPPY GARDEN CONSTR. CORP06/02/2015
BISOTISSUEDHAPPY GARDEN CONSTR. CORP06/02/2015
BISFPISSUEDNEW YORK BUINESS FIRE SYSTEMS IN05/16/2007
BISEQISSUEDGOLDEN MINT INC06/12/1998
BISOTISSUEDGOLDEN MINT INC06/12/1998
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/31/1995
BIS—ISSUEDACE SIGN AND RIGGING CORP02/25/1994
BISPLISSUEDMAGOR PLG AND HEATING02/04/1994
BISPLISSUEDMAGOR PLG AND HEATING02/04/1994
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM01/26/1994
BIS—ISSUEDPANE STONE CONSTRUCTION CORP.01/24/1994
BIS—RE-ISSUEDPANESTONE CONST. CORP07/07/1993
BISEQISSUEDPANESTONE CONST. CORP07/07/1993
BISEQISSUEDPANESTONE CONST. CORP01/15/1993
BISPLISSUEDMAGOR PLG. & HTNG.11/09/1992
BISEQRE-ISSUEDPANESTONE CONST. CORP07/13/1992
BIS—ISSUEDPANESTONE CONST. CORP07/13/1992
3 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
05/19/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
05/02/2018CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/11/2025HVAC-R and service water piping design and insulationYou Gaoenergy_progress
09/11/2025Energy Code Compliance InspectionsYou Gaoprogress
09/11/2025Fire-Resistant Penetrations and JointsYou Gaospecial
09/10/2025Fire-Resistant Penetrations and JointsYou Gaospecial
09/10/2025Energy Code Compliance InspectionsYou Gaoprogress
09/10/2025HVAC-R and service water piping design and insulationYou Gaoenergy_progress
08/11/2025Lighting in dwelling unitsYou Gaoenergy_progress
08/11/2025Energy Code Compliance InspectionsYou Gaoprogress
08/11/2025Fire-Resistance Rated ConstructionYou Gaoprogress
08/11/2025Fire-Resistant Penetrations and JointsYou Gaospecial
08/08/2025Lighting in dwelling unitsYou Gaoenergy_progress
08/08/2025Fire-Resistant Penetrations and JointsYou Gaospecial
08/08/2025Energy Code Compliance InspectionsYou Gaoprogress
08/08/2025Fire-Resistance Rated ConstructionYou Gaoprogress
05/07/2025Fire-Resistant Penetrations and JointsYanqi Dingspecial
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026Q00039850-I1Request digital key ↗
08/20/2026Q01179047-S1Request digital key ↗
08/20/2026Q01179047-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
06/04/2018421620142Open ↗
06/04/2018421620142Open ↗
08/01/2017421533184Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
06/20/2018421620142Open ↗
08/02/2017421533184Open ↗
06/02/2015440223223Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/26/2015440223223Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature8
09/28/2026Q01179047-P4Open ↗
09/28/2026Q01179047-P4Open ↗
09/20/2026Q01179047-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026Q01179047-I1Open ↗
08/20/2026Q01179047-P3Open ↗
08/20/2026Q01179047-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026Q01179047-P4Open ↗
09/20/2026Q01179047-I1Open ↗
09/02/2026Q01179047-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/08/2019421620142Open ↗
10/19/2017421533184Open ↗
08/01/2017421533184Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/04/2018421620142Open ↗
08/01/2017421533184Open ↗
05/29/2015440223223Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/04/2018421620142Open ↗
08/01/2017421533184Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/29/2015440223223Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/29/2015440223223Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00039850-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/19/2017421533184Open ↗
08/01/2017421533184Open ↗
08/26/2015440223223Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/19/2017421533184Open ↗
08/26/2015440223223Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/29/2015440223223Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/29/2015440223223Open ↗
▸Inspections & Test Reports2
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/08/2019421620142Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/29/2015440223223Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/08/2019421620142Open ↗
10/19/2017421533184Open ↗
08/26/2015440223223Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/19/2017421533184Open ↗
08/26/2015440223223Open ↗
08/26/2015440223223Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/10/2015440223223Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
05/08/2019421620142Open ↗
06/04/2018421620142Open ↗
10/19/2017421533184Open ↗
Showing 3 of 6 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
06/02/2015440223223Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
06/04/2018421620142Open ↗
08/01/2017421533184Open ↗
▸BISADDITIONAL INFORMATION1
08/17/2015440223223Open ↗
▸BISBOROUGH INTAKE FORM1
10/19/2017421533184Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/29/2015440223223Open ↗