← Back
Walk-up cooperative
Queens Gardens
144-36 71 AVENUE · BIN 4451323
💬 Discuss this project
1949Year Built
2Stories
C6Building Class
R4Zoning
23,880 sfGross Floor Area
26Units
Rent Stabilized32 Open Violations 31 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: QUEENS GARDENS OWNERS INC · 28,914 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar3p · 6 filings · 20 docs
2 jobs · most recent 05/31/2022
Boiler Controls
FiledStatusContractorScope
05/31/2022CompleteDEMAND ELECTRIC INCBoiler Controls
10/21/2021CompleteDEMAND ELECTRIC INC—
Building Lifecycle
All (32)Filed (6)Permit Issued (6)Signed Off (6)Violation (8)Inspection (4)Special Inspection (2)
06/29/2022
Signed off — Alteration
Q00586815-I1
06/29/2022
Signed off — Alteration
REPLACE (1) BOILER AND (1) GAS/OIL BURNER WITH (2) GAS BOILERS. CONNECT TO EXISTING GAS PIPING IN BOILER ROOM. INSTALL TWO (2) NEW INDIRECT HOT WATER STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00586818-I1
06/29/2022
Signed off — Alteration
REPLACE BOILER AND GAS/OIL BURNER WITH GAS BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00586814-I1
06/28/2022
Signed off — Alteration
Q00586813-I1
06/28/2022
Signed off — Alteration
INSTALL CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00586817-I1
06/28/2022
Signed off — Alteration
Q00586811-I1
06/09/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/29/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2021
Permit issued — Mechanical Systems
Q00586817-I1-MS
10/08/2021
Permit issued — Boiler Equipment
Q00586814-I1-BE
10/08/2021
Permit issued — Plumbing
Q00586818-I1-PL
10/08/2021
Permit issued — Boiler Equipment
Q00586815-I1-BE
10/05/2021
Permit issued — General Construction
Q00586813-I1-GC
10/05/2021
Permit issued — Boiler Equipment
Q00586811-I1-BE
09/29/2021
Filed — Alteration
Q00586815-I1
09/29/2021
Filed — Alteration
REPLACE (1) BOILER AND (1) GAS/OIL BURNER WITH (2) GAS BOILERS. CONNECT TO EXISTING GAS PIPING IN BOILER ROOM. INSTALL TWO (2) NEW INDIRECT HOT WATER STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00586818-I1
09/29/2021
Filed — Alteration
REPLACE BOILER AND GAS/OIL BURNER WITH GAS BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00586814-I1
09/29/2021
Filed — Alteration
Q00586813-I1
09/29/2021
Filed — Alteration
INSTALL CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00586817-I1
09/29/2021
Filed — Alteration
Q00586811-I1
09/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
08/31/2021
Special inspection requirement — Final
Joseph Bazini
07/30/2021
Violation issued (ECB, closed)
Boilers
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2003
Violation issued (ECB, open)
Boilers
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUEENS QUALITY MANAGEMENT1307/08/2026
QUEENS GARDENS OWNERS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.609/29/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
CLEAN TECH MECHANICAL INCPlumbing307/08/2026
APPROVED OIL CO BROOKLYNGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808109/29/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME10/22/2021
DOB NOWBoiler EquipmentSigned-offCLEAN TECH MECHANICAL INC10/08/2021
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC10/08/2021
DOB NOWBoiler EquipmentSigned-offCLEAN TECH MECHANICAL INC10/08/2021
DOB NOWGeneral ConstructionSigned-offAPPROVED OIL CO BROOKLYN10/05/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL OF BKLYN,INC10/05/2021
BISFSISSUEDA L EASTMOND & SONS INC11/09/2004
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/29/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/07/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
08/31/2021FinalJoseph Baziniprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00586813-I1Request digital key ↗
08/27/2026Q00586811-I1Request digital key ↗
08/27/2026Q00586818-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00586811-I1Open ↗
08/27/2026Q00586815-I1Open ↗
08/13/2026Q00586817-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q00586814-I1Open ↗
08/23/2026Q00586813-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00586811-I1Open ↗
08/27/2026Q00586815-I1Open ↗
08/13/2026Q00586818-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00586814-I1Open ↗
08/13/2026Q00586815-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00586814-I1Open ↗
08/13/2026Q00586815-I1Open ↗