← Back
Multi-story retail building (2+)
44-31 DOUGLASTON PARKWAY
QUEENS · BIN 4453378
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R1-2Zoning
24,630 sfGross Floor Area
24Units
9 Open Violations 1 unresolved · 8 paperwork only ▸
Multi-story retail building (2+) · Owner of record: DOUGLASTON CORNER LLC · 18,414 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BKH ARCHITECT, PLLC107/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIQUE MECHANICAL CORPGeneral Contractor107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BKH ARCHITECT, PLLC6255107/21/2026
Building Lifecycle
All (14)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (11)
08/05/2026
Signed off — Alteration
DIRECT REPLACE 2 HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF:44-41/44-43 DOUGLASTON PARKWAY
Q01433402-I1
07/23/2026
Permit issued — Mechanical Systems
Q01433402-I1-GC-CX
07/21/2026
Filed — Alteration
DIRECT REPLACE 2 HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF:44-41/44-43 DOUGLASTON PARKWAY
Q01433402-I1
07/20/2026
Special inspection requirement — Mechanical Systems
Brandon Hamchuk
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brandon Hamchuk
07/20/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
Brandon Hamchuk
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Brandon Hamchuk
07/20/2026
Special inspection requirement — Final
Brandon Hamchuk
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Brandon Hamchuk
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Brandon Hamchuk
07/20/2026
Special inspection requirement — Air barrier - visual inspection
Brandon Hamchuk
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Brandon Hamchuk
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Brandon Hamchuk
07/20/2026
Special inspection requirement — Maintenance information
Brandon Hamchuk
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offUNIQUE MECHANICAL CORP07/23/2026
1 project · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026Signed-offUNIQUE MECHANICAL CORP1 scope_items
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/20/2026Mechanical SystemsBrandon Hamchukspecial
07/20/2026Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
07/20/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsBrandon Hamchukspecial
07/20/2026Structural Stability – Alterations of existing buildingsBrandon Hamchukspecial
07/20/2026FinalBrandon Hamchukprogress
07/20/2026Energy Code Compliance InspectionsBrandon Hamchukprogress
07/20/2026HVAC-R and service water piping design and insulationBrandon Hamchukenergy_progress
07/20/2026Air barrier - visual inspectionBrandon Hamchukenergy_progress
07/20/2026HVAC-R and service water heating system controlsBrandon Hamchukenergy_progress
07/20/2026HVAC-R and service water heating equipmentBrandon Hamchukenergy_progress
07/20/2026Maintenance informationBrandon Hamchukenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Douglaston LiquorsRetailFloors 1, 2
Project Q01433402 Alteration · LOC Issued · 07/21/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01433402-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01433402-I1Open ↗
08/26/2026Q01433402-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01433402-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01433402-I1Open ↗