Walk-up cooperative
14-48 212 STREET
QUEENS · BIN 4455188
💬 Discuss this project
1958Year Built
2Stories
C6Building Class
R3-2Zoning
32,155 sfGross Floor Area
32Units
Rent Stabilized0 Open Violations
Walk-up cooperative · Owner of record: BAY TERRACE COOPERATIVE SECTION II, INC. · 88,750 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 11 docs
Floor 1Under Construction4p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C208/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASKO ELEC CONST & MAIN INElectrical103/22/2026
GEO MAINTENANCE INCGeneral Contractor108/22/2026
AURA PLUMBING INCPlumbing109/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK J. QUATELA, ARCHITE1632208/11/2026
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Special Inspection (15)
08/31/2026
Permit issued — Plumbing
Q01436161-S1-PL
08/21/2026
Permit issued — General Construction
Q01436161-I1-GC
08/11/2026
Filed — Alteration
REPLACE EXISTING KITCHEN FIXTURES ON FIRST FLOOR AND BATH FIXTURES ON SECOND FLOOR. NEW POWDER ROOM AND LAUNDRY FIXTURES ON FIRST FLOOR WITH ASSOCIATED PIPING.
Q01436161-S1
08/11/2026
Filed — Alteration
REPLACE EXISTING KITCHEN FIXTURES ON FIRST FLOOR AND BATH FIXTURES ON SECOND FLOOR. NEW POWDER ROOM AND LAUNDRY FIXTURES ON FIRST FLOOR WITH ASSOCIATED PIPING.
Q01436161-I1
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
07/24/2026
Special inspection requirement — Mechanical Systems
FRANK QUATELA
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
07/24/2026
Special inspection requirement — Final
FRANK QUATELA
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
07/24/2026
Special inspection requirement — Permanent certificate
FRANK QUATELA
07/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
07/24/2026
Special inspection requirement — Interior lighting power
FRANK QUATELA
07/24/2026
Special inspection requirement — Maintenance information
FRANK QUATELA
07/24/2026
Special inspection requirement — Ventilation and air distribution system
FRANK QUATELA
07/24/2026
Special inspection requirement — Insulation placement and R values
FRANK QUATELA
07/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
07/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC08/31/2026
DOB NOWGeneral ConstructionPermit IssuedGEO MAINTENANCE INC08/21/2026
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/11/2026Permit IssuedGEO MAINTENANCE INCHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 08/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
1 project · most recent 10/12/2023
General Wiring
FiledStatusContractorScope
10/12/2023CompleteASKO ELEC CONST & MAIN INGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/11/2026HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
07/24/2026Energy Code Compliance InspectionsFRANK QUATELAprogress
07/24/2026Mechanical SystemsFRANK QUATELAspecial
07/24/2026Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
07/24/2026FinalFRANK QUATELAprogress
07/24/2026Energy Code Compliance InspectionsFRANK QUATELAprogress
07/24/2026Permanent certificateFRANK QUATELAenergy_progress
07/24/2026HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
07/24/2026Interior lighting powerFRANK QUATELAenergy_progress
07/24/2026Maintenance informationFRANK QUATELAenergy_progress
07/24/2026Ventilation and air distribution systemFRANK QUATELAenergy_progress
07/24/2026Insulation placement and R valuesFRANK QUATELAenergy_progress
07/24/2026HVAC-R and service water heating equipmentFRANK QUATELAenergy_progress
07/24/2026Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
07/24/2026HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01436161-I1Request digital key ↗
08/16/2026Q01436161-S1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01436161-I1Open ↗
08/26/2026Q01436161-I1Open ↗
08/23/2026Q01436161-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01436161-I1Open ↗
08/16/2026Q01436161-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01436161-I1Open ↗
08/23/2026Q01436161-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01436161-I1Open ↗
08/16/2026Q01436161-S1Open ↗