← Back
Condo, residential unit in walk-up building
Park Ridge Condominium
67-27 CLOVERDALE BOULEVARD · BIN 4456419
💬 Discuss this project
1950Year Built
2Stories
R2Building Class
R3-2Zoning
212,533 sfGross Floor Area
179Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in walk-up building · Owner of record: PARK RIDGE CONDO · 432,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 22p · 1 filing · 9 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WT ENGINEERING STUDIO106/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WT ENGINEERING STUDIO6730106/18/2021
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (9)
02/06/2022
Signed off — Alteration
INTERIOR FLOORING AND PAINTING WORK AT FIRST AND SECOND FLOOR ONLY AT EXISTING MULTI-FAMILY WALK-UP BUILDING. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
Q00536029-I1
06/24/2021
Permit issued — General Construction
Q00536029-I1-GC
06/18/2021
Filed — Alteration
INTERIOR FLOORING AND PAINTING WORK AT FIRST AND SECOND FLOOR ONLY AT EXISTING MULTI-FAMILY WALK-UP BUILDING. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
Q00536029-I1
06/17/2021
Special inspection requirement — Lighting in dwelling units
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Energy Code Compliance Inspections
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Fire-Resistance Rated Construction
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Interior lighting power
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Maintenance information
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Lighting controls
WAI LUN WAYNE TSANG
06/17/2021
Special inspection requirement — Permanent certificate
WAI LUN WAYNE TSANG
06/08/2021
Special inspection requirement — Final
WAI LUN WAYNE TSANG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC06/24/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/17/2021Lighting in dwelling unitsWAI LUN WAYNE TSANGenergy_progress
06/17/2021Energy Code Compliance InspectionsWAI LUN WAYNE TSANGprogress
06/17/2021Fire-Resistance Rated ConstructionWAI LUN WAYNE TSANGprogress
06/17/2021Fire-Resistant Penetrations and JointsWAI LUN WAYNE TSANGspecial
06/17/2021Interior lighting powerWAI LUN WAYNE TSANGenergy_progress
06/17/2021Maintenance informationWAI LUN WAYNE TSANGenergy_progress
06/17/2021Lighting controlsWAI LUN WAYNE TSANGenergy_progress
06/17/2021Permanent certificateWAI LUN WAYNE TSANGenergy_progress
06/08/2021FinalWAI LUN WAYNE TSANGprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00536029-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature4
08/22/2026Q00536029-I1Open ↗
08/22/2026Q00536029-I1Open ↗
08/22/2026Q00536029-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026Q00536029-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026Q00536029-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00536029-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00536029-I1Open ↗