← Back
Walk-up cooperative
Glen Oaks Village
245-24 76 AVENUE · BIN 4458920
💬 Discuss this project
1948Year Built
2Stories
C6Building Class
R3-2Zoning
136,802 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized7 Open Violations ▸
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 282,525 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLEN OAKS VILLAGE OWNER'S INC.1807/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MESZAROS ENGINEERING PLLC602/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MESZAROS ENGINEERING PLLC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY CITY PLUMBER CORPPlumbing207/22/2026
ABILENE INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MESZAROS ENGINEERING PLLC963602/05/2026
Building Lifecycle
All (54)Filed (6)Permit Issued (4)Violation (11)Inspection (3)Special Inspection (30)
07/21/2026
Permit issued — Plumbing
Q01215407-S1-PL
06/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
02/06/2026
Special inspection requirement — Final
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
02/06/2026
Special inspection requirement — Maintenance information
Christian Meszaros
02/06/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
02/06/2026
Special inspection requirement — Chimneys and vents
Christian Meszaros
02/06/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
02/06/2026
Special inspection requirement — Preliminary
Christian Meszaros
02/05/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P3
02/05/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P2
01/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/29/2026
Special inspection requirement — Maintenance information
Christian Meszaros
01/29/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/26/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P1
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/26/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
01/26/2026
Special inspection requirement — Heating Systems
Christian Meszaros
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/26/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/26/2026
Special inspection requirement — Maintenance information
Christian Meszaros
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/21/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/21/2026
Special inspection requirement — Maintenance information
Christian Meszaros
01/21/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/06/2025
Permit issued — General Construction
Q01215407-I1-GC
06/06/2025
Permit issued — Plumbing
Q01215407-S1-PL
06/06/2025
Permit issued — Boiler Equipment
Q01215407-S2-BE
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-I1
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-S1
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-S2
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNY CITY PLUMBER CORP07/21/2026
DOB NOWGeneral ConstructionPermit IssuedABILENE INC06/06/2025
DOB NOWPlumbingPermit IssuedNY CITY PLUMBER CORP06/06/2025
DOB NOWBoiler EquipmentSigned-offABILENE, INC06/06/2025
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC04/26/1990
1 project · most recent 02/05/2026
Gas
FiledStatusContractorScope
02/05/2026Permit IssuedNY CITY PLUMBER CORPGas
1 project · most recent 08/21/2025
Boiler Controls
FiledStatusContractorScope
08/21/2025CompleteABILENE ELECTRIC INCBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
02/06/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
02/06/2026FinalChristian Meszarosprogress
02/06/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
02/06/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
02/06/2026Maintenance informationChristian Meszarosenergy_progress
02/06/2026Permanent certificateChristian Meszarosenergy_progress
02/06/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
02/06/2026Chimneys and ventsChristian Meszarosspecial
02/06/2026Post-installed AnchorsChristian Meszarosspecial
02/06/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
02/06/2026PreliminaryChristian Meszarosprogress
01/29/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
01/29/2026Maintenance informationChristian Meszarosenergy_progress
01/29/2026Permanent certificateChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
01/29/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
01/26/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
01/26/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
01/26/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
01/26/2026Heating SystemsChristian Meszarosspecial
01/26/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
01/26/2026Permanent certificateChristian Meszarosenergy_progress
01/26/2026Maintenance informationChristian Meszarosenergy_progress
01/26/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
Latest 25 of 33.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01215407-P1Request digital key ↗
08/17/2026Q01215407-P2Request digital key ↗
08/17/2026Q01215407-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature22
09/20/2026Q01215407-S1Open ↗
09/20/2026Q01215407-S1Open ↗
09/20/2026Q01215407-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/20/2026Q01215407-S1Open ↗
08/31/2026Q01215407-P3Open ↗
08/30/2026Q01215407-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01215407-I1Open ↗
08/17/2026Q01215407-S1Open ↗
08/17/2026Q01215407-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026Q01215407-S2Open ↗
08/17/2026Q01215407-I1Open ↗
08/17/2026Q01215407-S1Open ↗
Showing 3 of 6 on file for this type